An implementation engineer is performing a precheck on a VxRail cluster before expansion. During validation, they find out that the host is not compatible.
Use the VxRail simulator to describe why the host is Incompatible.
Note: It is necessary to close (x) the simulator window before you can select a response to this question.
A VxRail Manager VM must be configured as follows:
* IP address: 192 168.10.16
* Net mask: 255.255.255.0
* Gateway: 192 168 10 254
Which command must be used?
Which command can be used from the VxRail Manager VM to restart the loudmouth daemon?
What is a difference between vSAN Data-In-Transit Encryption and vSAN Data-At-Rest-Encryption?
What is a supported witness configuration for a 3+3+1 VxRail Stretched Cluster?
What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-5 (Erasure Coding)?
After implementation, the implementation engineer observes errors from both VxRail Manager and vCenter Server. Dell EMC support has requested a log bundle containing only the required log files. Using the simulator, create and download a log bundle for Dell EMC support.
When you have finished, continue to the next question.
A VxRail cluster is being deployed in a DMZ environment. What is the recommended deployment option?
A company has multiple VxRail systems installed at geographically dispersed data centers They want to upgrade all their VxRail systems to the latest release- Before the upgrade, they want an inventory report of all the VxRail systems which shows the current health status and versions of all installed VxRail components.
What should be used to meet these requirements?
What guideline should be followed when planning bandwidth between sites hosting VM objects and the witness nodes?
During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?
Once a VxRail cluster has been acquired, what is the correct sequence of steps to deploy it?