Pre-Winter Special Discount 60% Offer - Ends in 0d 00h 00m 00s - Coupon code: brite60

ExamsBrite Dumps

Certified Lean Six Sigma Green Belt (CLSSGB) Question and Answers

Certified Lean Six Sigma Green Belt (CLSSGB)

Last Update Oct 16, 2024
Total Questions : 200

We are offering FREE CLSSGB GAQM exam questions. All you do is to just go and sign up. Give your details, prepare CLSSGB free exam questions and then go for complete pool of Certified Lean Six Sigma Green Belt (CLSSGB) test questions that will help you more.

CLSSGB pdf

CLSSGB PDF

$40  $99.99
CLSSGB Engine

CLSSGB Testing Engine

$48  $119.99
CLSSGB PDF + Engine

CLSSGB PDF + Testing Engine

$64  $159.99
Questions 1

Significant variation in process performance is a consequence of several causes that can be classified using terminologies shown here. (Note: There are 2 correct answers).

Options:

A.  

Common

B.  

Random

C.  

Uneducated

D.  

Special

E.  

Vital

Discussion 0
Questions 2

The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.

Options:

A.  

True

B.  

False

Discussion 0
Questions 3

As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.

Options:

A.  

Kanban

B.  

Kaizen

C.  

Poke-Yoke

D.  

WhoSai

Discussion 0
Questions 4

The very best way to begin an effort to map a process is to do which of these?

Options:

A.  

Interview the process owner

B.  

Interview the manager of the department

C.  

Walk the actual process from beginning to end

D.  

Take pictures of the factory floor at each shift

Discussion 0
Questions 5

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

Options:

A.  

Never, a Control Plan is a living document

B.  

As soon as the Champion signs off

C.  

Within 30 days of the LSS project review team meeting

D.  

After the project has been presented at the recognition event

Discussion 0
Questions 6

Inferential Statistics is largely about Significance. There are both Practical and _______________ Significance to consider during an analysis of data in a Lean Six Sigma project.

Options:

A.  

Problematic

B.  

Impractical

C.  

Usable

D.  

Statistical

Discussion 0
Questions 7

The following Business Case is constructed properly.

“In business unit A there are too many flashlight returns and flashlight sales have decreased by 25 percent.”

Options:

A.  

True

B.  

False

Discussion 0
Questions 8

A 1-Sample t-test is used when you want to compare the Median of one distribution to a target value.

Options:

A.  

True

B.  

False

Discussion 0
Questions 9

Standardized work instructions apply to which resource in the process of interest?

Options:

A.  

People

B.  

Machines

C.  

Supervision

D.  

Engineering

Discussion 0
Questions 10

Which statement(s) describe an undesirable situation when implementing SPC?

Options:

A.  

The lower Control Limit for the R chart is equal to zero

B.  

Attempt to use SPC for tracking transaction times at a warehouse

C.  

A process is in Statistical Control before implementation of SPC

D.  

The Control Limits are wider than the customer specification limits

Discussion 0
Questions 11

Skewed, or Mixed, Distributions occur when data comes from several sources that are supposed to be the same yet are not.

Options:

A.  

True

B.  

False

Discussion 0
Questions 12

The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as ____________.

Options:

A.  

Repeatability

B.  

Bias

C.  

Linearity

D.  

Reproducibility

Discussion 0
Questions 13

Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.

Options:

A.  

Standard Deviation

B.  

Mean

C.  

Median

D.  

True value

Discussion 0
Questions 14

The higher the sigma level of a process the better the performance.

Options:

A.  

True

B.  

False

Discussion 0
Questions 15

Cost of Poor Quality (COPQ) can be classified as Tangible (Visible) Costs and Hidden Costs.

Options:

A.  

True

B.  

False

Discussion 0
Questions 16

The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as ____________.

Options:

A.  

Repeatability

B.  

Bias

C.  

Linearity

D.  

Reproducibility

Discussion 0
Questions 17

If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

Options:

A.  

Individual—Moving Range

B.  

Xbar-R Charts

C.  

Xbar-S Charts

D.  

nP and P Charts

Discussion 0
Questions 18

The Regression Model for an observed value of Y contains the term ?o which represents the Y axis intercept when X = 0.

Options:

A.  

True

B.  

False

Discussion 0
Questions 19

While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?

Options:

A.  

Straighten

B.  

Sort

C.  

Shine

D.  

Sustain

Discussion 0
Questions 20

Voice of the Customer is a Lean Six Sigma technique to determine ____________________ attributes of a product or service.

Options:

A.  

At least 6

B.  

The profitable

C.  

Critical-to-Quality

D.  

The majority of the

Discussion 0
Questions 21

Which statement(s) are true about the Fitted Line Plot shown here? (Note: There are 2 correct answers).

Options:

A.  

When Reactant increases, the Energy Consumed increases.

B.  

The slope of the equation is a positive 130.5.

C.  

The predicted output Y is close to -18 when the Reactant level is set to 6.

D.  

Over 85 % of the variation of the Energy Consumed is explained by the Reactant via this Linear Regression.

Discussion 0
Questions 22

According to the definition of Rolled Throughput Yield which of the following items best describe the purpose of RTY?

Options:

A.  

A function of Y=f(x)

B.  

Determines incremental Growth

C.  

Isolates the increase throughput

D.  

Accounts for rejects and reworks

Discussion 0
Questions 23

Having an Alpha of .05 and a Beta of .10 are the most common risk levels when running a Statistical test.

Options:

A.  

True

B.  

False

Discussion 0
Questions 24

The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.

Options:

A.  

Shining

B.  

Standardizing

C.  

Sustaining

D.  

Sorting

Discussion 0
Questions 25

Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

Options:

A.  

True

B.  

False

Discussion 0
Questions 26

It is a Type II error if we decide to reject the Null Hypothesis when it is actually true.

Options:

A.  

True

B.  

False

Discussion 0
Questions 27

A Lean Principle that addresses efficiency by the process worker is called ____________________?

Options:

A.  

Visual Factory

B.  

Supervising

C.  

Training

D.  

Standardizing

Discussion 0
Questions 28

The perfect sample size is the minimum number of data points required to provide exactly 6% overlap or risk if one wants a 95% confidence level.

Options:

A.  

True

B.  

False

Discussion 0
Questions 29

The 80:20 rule is associated with which of these tools?

Options:

A.  

Pareto Chart

B.  

Simon's Cross-Functional Tool

C.  

SIPOC

D.  

Framing Tool

Discussion 0
Questions 30

The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?

Options:

A.  

Inefficiency of estimates

B.  

Residuals

C.  

Confounded data

D.  

Gap Analysis

Discussion 0