Procedural requirements for alternates, project meetings, and submittals belong where?
Which of the following is a format that standardizes the way text is arranged in specification pages so that it is best suited for easy reading and rapid reference?
Which bid form component ensures equal consideration, transparency, and flexibility while awarding a contract, but also manages cost during execution for undefined and unforeseen construction conditions?
What determines the responsibilities of the participants on the project team?
The three types of commissioning include systems and equipment commissioning, building envelope commissioning, and what other process?
Who has the right to stop the work if hazardous materials are encountered during the construction?
Who is responsible for accepting and inspecting for damage of the owner-furnished products delivered to the project site?
What is the term used to describe the time it takes to procure an item on site?
What is the procedure for guarding against defects and deficiencies before and during the execution of the work?
Where can you typically find requirements for temporary toilet facilities?
In the MasterFormat® specification system, which subgroup contains requirements of MEP, fire protection, and telecom systems?
There are over 3,500 different grades of steel. The amount of carbon, level of impurities, and additional elements all contribute to what grade steel is classified as in building projects. Therefore, which of the following is the method of specification writing used to limit lengthy descriptions of materials?
You are working on a project that is subject to regulatory reviews both at the city and at the state level. Both agencies have acknowledged receiving the construction documents. This project has already been awarded to a general contractor, and you are representing the owner who wants to start construction immediately. How would you advise the owner?
To avoid miscommunication problems during construction, which best practice should the design professional use?
How long after bid opening is a bidder required to honor their bid price for a project?
How does the architect/engineer control the project cost when not enough information is available to make product decisions during the design phases of a project?
When should a post-occupancy evaluation by the facility manager be performed?
The general principle to which architects and engineers have a duty to clients and society at large to practice is defined as "taking the same course of action as another reasonable and prudent architect or engineer in the same geographic area would have taken under the same circumstances" is known by what term?
What is a fundamental principle required to provide fairness in a competitive bidding process?
What activity helps the owner assess the viability of a project, evaluate financial resources, and understand the project's potential impact on the community?
Under the design-bid-build project delivery, what is the next step after the procurement phase has ended to award the contract for construction?
When innovative or unusual design techniques are proposed, it is advised to have what type of review?