Summer Special Discount 60% Offer - Ends in 0d 00h 00m 00s - Coupon code: brite60

ExamsBrite Dumps

UiPath Test Automation Engineer Professional v1.0 Exam Question and Answers

UiPath Test Automation Engineer Professional v1.0 Exam

Last Update Oct 2, 2025
Total Questions : 110

We are offering FREE UiPath-TAEPv1 UiPath exam questions. All you do is to just go and sign up. Give your details, prepare UiPath-TAEPv1 free exam questions and then go for complete pool of UiPath Test Automation Engineer Professional v1.0 Exam test questions that will help you more.

UiPath-TAEPv1 pdf

UiPath-TAEPv1 PDF

$42  $104.99
UiPath-TAEPv1 Engine

UiPath-TAEPv1 Testing Engine

$50  $124.99
UiPath-TAEPv1 PDF + Engine

UiPath-TAEPv1 PDF + Testing Engine

$66  $164.99
Questions 1

What UiPath Studio tool is used to record and perform actions on real or simulated mobile devices?

Options:

A.  

Mobile Device Connection

B.  

Mobile Device Manager

C.  

Mobile Testing Template

D.  

Mobile Automation Activities

Discussion 0
Questions 2

What conclusions can be drawn from the exhibit?

Options:

A.  

It's a data-driven test case with 2 variations, 2 variations were run and 2 not yet run.

B.  

It's a data-driven test case with 3 variations, 3 variations were run and 3 not yet run.

C.  

It's a data-driven test case with 6 variations, 3 variations were run and 3 not yet run.

D.  

It's an automated test case with 8 variations.

Discussion 0
Questions 3

Options:

A.  

Only the Test Manager can perform re-executions.

B.  

The pre-defined user roles that can perform re-executions are: Test Manager, Test Executor and Manual Tester.

C.  

Any user with access to the Test Manager can perform re-executions.

D.  

Only the Test Executor can perform re-executions.

Discussion 0
Questions 4

According to the troubleshooting Test Manager tips, what is one of the ways to resolve the following issue?

Options:

A.  

Duplicate the faulty test case within Studio.

B.  

Re-link the faulty test case to the test set.

C.  

Re-publish the project to Orchestrator.

D.  

Unlink the automation in Test Manager.

Discussion 0
Questions 5

What kind of changes can be made to test sets linked from Orchestrator in Test Manager?

Options:

A.  

The description can not be edited, but the name and version can be edited in Test Manager.

B.  

The name description, or version can not be edited. Any changes need to be made in Orchestrator.

C.  

The name can not be edited, but the version and description can be edited in Test Manager.

D.  

The version can not be edited, but the name and description can be edited in Test Manager.

Discussion 0
Questions 6

According to best practices, what is an acceptable way of validating an application's state before proceeding with certain steps in a process during testing?

Options:

A.  

Consider applying validation measures which include using extra activities that wait for the desired application state before other interactions.

B.  

Use as many hardcoded delays as needed to ensure the application has reached the desired state before proceeding with other interactions.

C.  

Validate an application's state by implementing hardcoded delays before proceeding with other interactions.

D.  

Avoid waiting for the desired application state and directly proceed with other interactions.

Discussion 0
Questions 7

What is the appropriate scenario to use the "Synchronize mock" action?

Options:

A.  

To sync the mock files with the source workflow files.

B.  

To sync the workflows into newly mock files for mock testing.

C.  

To copy the workflows into mock files for mock testing.

D.  

To sync the mock files into newly created workflow files.

Discussion 0
Questions 8

What are the key features of UiPath Test Manager and its integration with ALM solutions, facilitated by UiPath Test Manager Connect?

Options:

A.  

UiPath Test Manager Connect offers a one-way synchronization of objects and supports a limited number of ALM tools.

B.  

UiPath Test Manager is only compatible with ALM solutions for defect management, and the integration is facilitated by an external provider.

C.  

UiPath Test Manager is compatible with leading ALM solutions, and the UiPath Test Manager Connect, provided by Planview, ensures bidirectional synchronization for seamless data exchange.

D.  

UiPath Test Manager excludes agile planning and requirement management, and the integration is facilitated by UiPath itself.

Discussion 0
Questions 9

What is the output format of the UiPath.Testing.Activites.TestData.Address activity?

Options:

A.  

Dictionary (String, String) with the fields: Country, PostalCode, StreetNumber, State

B.  

Dictionary (String, Object) with the fields: Country, PostalCode, StreetNumber, StreetName, City, State

C.  

Dictionary (String, String) with the fields: Country PostalCode, StreetNumber, StreetName, City, State

D.  

Dictionary (String, Object) with the fields: Country, PostalCode, StreetNumber, State

Discussion 0
Questions 10

What does the Timezone configuration in the Add Test Schedule section do?

Options:

A.  

It adjusts the test execution time accordingto the tenant's timezone.

B.  

It allows to specify the timezone accordingto which the schedule is launched.

C.  

It allows to set up a default timezone for all test schedules.

D.  

It determines the timezone of your Orchestrator instance.

Discussion 0
Questions 11

How can a Serverless Robot be added to an Orchestrator tenant?

Options:

A.  

Go to Tenant > Machines. Click Add Machine and select Cloud Robot - Serverless. Fill in the Name and optionally the Description. Add tags if necessary, but don't configure other settings. Finally, click Save.

B.  

Go to Tenant > Robots. Click Add Robot and select Serverless. Fill in the Name and optionally the Description. Add tags if necessary and configure other settings. Finally, click Provision.

C.  

Go to Tenant > Robots. Click Add Robot and select Serverless Robot. Fill in the Name and optionally the Description. Add tags if necessary and configure other settings. Finally, click Add Robot.

D.  

Go to Tenant > Machines. Click Add Machine and select Cloud Robot - Serverless. Fill in the Name and optionally the Description. Add tags if necessary and configure other settings. Finally, click Provision.

Discussion 0
Questions 12

Given the following SumWorkflow:

What is the appropriate verification required for testing that the SumWorkflow works as expected?

Options:

A.  

"sum = expectedSum"

B.  

sum

C.  

no1 + no2 = expectedSum

D.  

sum.Equals(expectedSum)

Discussion 0
Questions 13

Where can robot authentication settings be seen and configured?

Options:

A.  

Tenant > Preferences, on the Robot security tab.

B.  

Tenant > Settings, on the Robot connection tab.

C.  

Tenant > Preferences, on the Robot connection tab.

D.  

Tenant > Settings, on the Robot security tab.

Discussion 0
Questions 14

Considering the following snippet, where is LoanRate defined?

Options:

A.  

In the Object Repository, under the application LoanResults.

B.  

In the LoanResults class that contains a setter for LoanRate.

C.  

In the UiAutomation class that contains a setter for LoanRate.

D.  

In the Object Repository, under the screen LoanResults.

Discussion 0
Questions 15

What color code in the status tab represents a test without a definitive results or that have not been executed yet but is a part of a test set that is currently being executed?

Options:

A.  

Red

B.  

Black

C.  

Grey

D.  

Green

Discussion 0
Questions 16

What are the mock testing conditions in UiPath?

Options:

A.  

• There can be only one mock file for a workflow

• Nested mocks are available

• Mock.json file does not contain configuration settings for mock files

• Changes made in the source workflow file are not applied to the mock file when the project is saved

B.  

• There can be multiple mock files for a workflow

• Nested mocks are not available

• Mock.json file contains configuration settings for mock files

• Changes made in the source workflow file are applied to the mock file when the project is saved

C.  

• There can be multiple mock files for a workflow

• Nested mocks are available

• Mock.json file contains configuration settings for mock files

• Changes made in the source workflow file are not applied to the mock file when the project is saved

D.  

• There can be only one mock file for a workflow

• Nested mocks are not available

• Mock.json file contains configuration settings for mock files

• Changes made in the source workflow file are applied to the mock file when the project is saved

Discussion 0
Questions 17

Which are the supported object types when creating a new custom field in UiPath Test Manager?

Options:

A.  

Test case and test result.

B.  

Test set and defect

C.  

Requirement and test set.

D.  

Defect and requirement.

Discussion 0
Questions 18

What are the tasks that can be executed from the UiPath command-line interface (CLI) while creating a CI/CD pipeline?

Options:

A.  

Job, Run, Deploy, Delete, Analyze.

B.  

Asset Job, Package, Test, Help, Version.

C.  

Analyze, Delete, Deploy, Pack.

D.  

Run, Test, Deploy, Pack, Help, Version.

Discussion 0
Questions 19

What is the maximum number of Projects that can be created in Test Manager?

Options:

A.  

10 Test Manager Projects

B.  

50 Test Manager

C.  

100 Test Manager Projects

D.  

Unlimited Test Manager Projects

Discussion 0
Questions 20

What type(s) of license should be used in order to be able to connect Studio to Test Manager?

Options:

A.  

Just Task Capture license

B.  

Just Test Manager license.

C.  

Studio license and Test Manager license.

D.  

Studio license and Orchestrator license.

Discussion 0
Questions 21

What happens once a Test Set execution starts in Test Manager?

Options:

A.  

A test execution container is created without a name, and an empty test result entry, called a test case log. is added for each Test Case.

B.  

A test execution container with the same name as the Test Set is created, and for each Test Case, an empty test result entry, called a test case log. is added.

C.  

An empty test result, called a Test Case log. is created, but no test execution container is formed.

D.  

A Test Case log is created for each executed Test Case, and an empty test result entry is added to an unnamed test execution container.

Discussion 0
Questions 22

Which test cases are included in test sets linked from Orchestrator to Test Manager?

Options:

A.  

Only the test cases from Orchestrator.

B.  

Test cases from both Orchestrator and Test Manager.

C.  

Both manual and automated test cases from multiple Studio projects.

D.  

Test cases that have been updated by your user, by specific labels, or the source.

Discussion 0
Questions 23

Who can import projects in Test Manager?

Options:

A.  

Only users who originally created the artifact in the ALM system.

B.  

Anyone with access to the project.

C.  

Any user that has a valid Test Manager License.

D.  

Only users that are specifically designated by the admin.

Discussion 0
Questions 24

When is it necessary to utilize the Mobile Device Manager?

Options:

A.  

Both at design-time and at run-time.

B.  

Never

C.  

At run-time.

D.  

At design-time.

Discussion 0
Questions 25

Having the test case described in the image below:

The test data queue was imported in Studio workflow through a variable called testQueue. The structure of the Test Data Queue can be seen below:

What ROI will be printed in the Output panel when the test case from the Text Explorer panel is run?

Options:

A.  

67,77

B.  

12.45

C.  

45

D.  

67,34,77

Discussion 0
Questions 26

What is the correct order of stages of the Testing process?

Instructions: Drag the Description found on the left and drop on the correct order of stages found on the right.

Options:

Discussion 0
Questions 27

Which are the sub-tasks available under test task in UiPath CLI?

Options:

A.  

Convert: converts test results written as CSV to another format.

Run: tests a given package, or runs an existing Test Set on Orchestrator.

B.  

Convert: converts test results written in JSON or CSV to another format.

Run: tests a given package, or runs an existing Test Set on Orchestrator.

C.  

Convert: converts test results written in JSON to another format.

Run: tests a given package, or runs an existing Test Set on Orchestrator.

D.  

Convert: converts test results written in JSON to another format.

Test: tests a given package.

Run: runs an existing Test Set on Orchestrator.

Discussion 0
Questions 28

Consider the following snippet:

What should be improved to ensure the Test Case will not fail with exception?

Options:

A.  

In the Verification point '_autogenerated_TextString' should be removed.

B.  

The ObjectRepository should be changed so all the elements fall into Home screen.

C.  

The ApplicationPath should be provided dynamically.

D.  

Click 'OK' should be removed.

Discussion 0
Questions 29

A developer, who has just discovered Test Suite, built a test case that checks if the SumWorkflow correctly performs the sum of 2 integers, using different input values from an Excel file.

What could be considered an improvement in the way the test was developed?

SumWorkflow:

TestCase:

TestData.xlsx:

Options:

A.  

Use the Excel file as a Data Variation Source, instead of iterating through it inside the test case.

B.  

Replace the Verify Expression activity with Verify Expression with Operator to benefit from built-in operators.

C.  

Surround the SumWorkfiow in a Retry Scope to improve error handling.

D.  

Replace the Given-When-Then structure with a custom-built framework.

Discussion 0
Questions 30

How can manual steps be marked in a Test Case as passed or failed in the Manual Execution Assistant?

Options:

A.  

Use the "Execute Manually" button.

B.  

Click "Set Failed" or "Set Passed" at the end of the test.

C.  

Click "Set Failed" or "Set Passed" for each step.

D.  

Only automated steps can be marked; manual steps are automatically passed.

Discussion 0
Questions 31

What are the two methods for executing tests and where are they invoked??

Options:

A.  

Manual and semi-automated: invoked in Studio.

B.  

Manual and Automated; invoked in Test Manager only.

C.  

Manual and Scripted; invoked in Orchestrator only

D.  

Manual andAutomated; invoked in Test Manager and Orchestrator.

Discussion 0
Questions 32

What does the UiPath CLI allow to do?

Options:

A.  

Run on both Windows and Linux devices without any restrictions.

B.  

Execute certainpre-defined tasks for RPA package management and testing.

C.  

Run only Windows - Legacy projects.

D.  

Build Studio projects that are not compatible with Orchestrator.

Discussion 0
Questions 33

What happens if a Test Execution is re-executed?

Options:

A.  

A log with all the previous executions is kept.

B.  

A log with only the previous execution is kept.

C.  

New test execution results are generated, independent from the previous ones.

D.  

The old execution results are deleted and replaced with the new results.

Discussion 0