SAFe Release Train Engineer (RTE 6.0) Question and Answers

SAFe Release Train Engineer (RTE 6.0)

Last Update Jan 15, 2026
Total Questions : 225

We are offering FREE SAFe-RTE Scaled Agile exam questions. All you do is to just go and sign up. Give your details, prepare SAFe-RTE free exam questions and then go for complete pool of SAFe Release Train Engineer (RTE 6.0) test questions that will help you more.

SAFe-RTE pdf

SAFe-RTE PDF

$36.75  $104.99
SAFe-RTE Engine

SAFe-RTE Testing Engine

$43.75  $124.99
SAFe-RTE PDF + Engine

SAFe-RTE PDF + Testing Engine

$57.75  $164.99
Questions 1

Which two actions can be taken immediately during the management review and prob-lem-solving meeting? (Choose two.)

Options:

A.  

Change the business priorities

B.  

Recognize the team with the highest velocity

C.  

Combine teams to increase velocity

D.  

Change the scope

E.  

Hire new people

Discussion 0
Questions 2

Which action describes the behavior of applying Systems Thinking for a Release Train Engineer (RTE)?

Options:

A.  

Encourages the team to express opinions in all circumstances

B.  

Examines what may be missing to make the environment better for the team

C.  

Demonstrates appreciation to team members in many ways

D.  

Facilitates individual decision-making over team-level decision-making

Discussion 0
Questions 3

Becoming a coach requires a shift from old behaviors to new ones. What are three ex-amples of new coaching behaviors? (Choose three.)

Options:

A.  

Facilitate team problem-solving

B.  

Focus on business value delivery

C.  

Drive toward specific outcomes

D.  

Fix problems for the team

E.  

Ask the team for the answer

F.  

Focus on deadlines

Discussion 0
Questions 4

What are two purposes of the System Demo? (Choose two.)

Options:

A.  

To demonstrate the full solution in a production-like context

B.  

To exercise the performance of the staging area

C.  

To get feedback from the primary stakeholders

D.  

To demonstrate a team's build

E.  

To conduct the Inspect and Adapt workshop

Discussion 0
Questions 5

Which of the following PI Planning element(s) creates transparency and helps engage Business

Owners and stakeholders in the planning process?

Options:

A.  

Draft objectives

B.  

Team Iteration plans

C.  

Problem-solving workshop

D.  

ROAMing Risks

Discussion 0
Questions 6

Why is it helpful to communicate newly refined Features and Enablers to the teams dur-ing the current Program Increment (PI)?

Options:

A.  

Teams can prepare backlogs, give feedback to the Product Owner/Product Man-agement/System Architect, and begin looking at dependencies, impediments, and knowledge building

B.  

Teams can review the Features and Enablers so they have an understanding of the Roadmap for the next PI

C.  

Teams can establish face-to-face communication across all team members and stakeholders

D.  

Teams can help support overall product integrity and facilitate working agree-merits during PI Planning

Discussion 0
Questions 7

What hourly activity helps keep teams on track and facilitates early identification of risks during the

Team Breakout portion of PI Planning?

Options:

A.  

Iteration Review

B.  

ART planning board inspection

C.  

Coach Sync

D.  

Business Owner feedback meeting

Discussion 0
Questions 8

Which of the following is true about the ART sync event?

Options:

A.  

It is run after PO-sync and Scrum of Scrum events

B.  

It is a combination of PO-sync and Scrum of Scrums events

C.  

It occurs during the Innovation and Planning iteration

D.  

Attendance by the entire ART is important

Discussion 0
Questions 9

How can a ReleaseTrain Engineer be aware of employee satisfaction?

Options:

A.  

Gather employee Metrics immediately after the Agile Release Train launches

B.  

Address and resolve any problems areas

C.  

Conduct an employee Net Promoter Score survey

D.  

Survey full-time employees

Discussion 0
Questions 10

(Which action describes the behavior of applying Systems Thinking for a Release Train Engineer (RTE)?)

Options:

A.  

Analyzes the flow of value through the Agile Release Train (ART) and looks for systemic bottlenecks or dependencies that impede progress

B.  

Tracks individual team performance metrics to foster healthy competition among teams

C.  

Implements strict adherence to process and documentation standards, ensuring all teams follow the defined procedures regardless of context

D.  

Focuses the teams on meeting individual deadlines and commitments, ensuring each team stays on track

Discussion 0
Questions 11

What is a benefit of capacity allocation?

Options:

A.  

It enables more effective time tracking

B.  

It ensures all value streams in the portfolio are appropriately funded

C.  

It ensures different types of backlog items are not compared against one another

Discussion 0
Questions 12

What is the best way for a Release Train Engineer to support teams having challenges with problem identification and decision making?

Options:

A.  

By providing solution ideas

B.  

By changing team composition

C.  

By listening to the team

D.  

By escalating to senior management

Discussion 0
Questions 13

Which skill do Release Train Engineers (RTEs) have the opportunity to regularly practice and improve?

Options:

A.  

Test-driven development

B.  

Return-on-investment (ROI) projections

C.  

Continuous Integration

D.  

Servant leadership

Discussion 0
Questions 14

Which two items should be kept under version control? (Choose two.)

Options:

A.  

Test data

B.  

Scrum of scrum results

C.  

Weighted shortest job first outcomes

D.  

Archived User Stories

E.  

Configuration Items

Discussion 0
Questions 15

What are two ways to ensure facility readiness when preparing for the Program Incre-ment (PI) Planning event? (Choose two.)

Options:

A.  

Secure communication channels for remote participants

B.  

Print program boards

C.  

Engage audio-visual technical support

D.  

Share business value documents

E.  

Print PI Objectives

Discussion 0
Questions 16

When planning for a distributed Program Increment (PI) Planning event with a large dif-ference in time zones, what are two key preparation and facilitation focus areas for a Re-lease Train Engineer (RTE)? (Choose two.)

Options:

A.  

Share the outcomes of preparation meetings with local Scrum Masters so they can arrange local rooms

B.  

Have a single RTE and technical support person that acts as a central point of communication for all locations

C.  

Adjust the PI agenda to 2.5 – 3 days, allowing for overlapping hours

D.  

Split up the PI Planning event per time zone and then have the final plan review, confidence vote, and planning retrospective as one centralized meeting

E.  

Arrange and test presentation audio and video connectivity in all locations

Discussion 0
Questions 17

Which activity takes place during Team Breakout #2 on the second day of Program In-crement (PI) Planning?

Options:

A.  

The RTE modifies the PI Iteration schedule, if needed, based on the scope of high priority Features

B.  

Business Owners assign business value without team discussion so they can nor-malize business value across all teams on the Agile Release Train

C.  

All Feature delivery and dependencies are visualized on the program board

D.  

The Release Train Engineer (RTE) combines all Team PI Objectives into Program PI Objectives

Discussion 0
Questions 18

The business must depend on the team for what in order to do any meaningful planning?

Options:

A.  

Team capabilities

B.  

Commitment to the plan

C.  

Measurements

D.  

A cross-functional skill set

Discussion 0
Questions 19

What are personas?

Options:

A.  

Descriptions of actual target customers or users

B.  

Key end-users the Product Owner leverages for managing the backlog

C.  

Fictional representations of target customers or users

Discussion 0
Questions 20

Who are two key collaborators with the RTE to support the ART? (Choose two)

Options:

A.  

Release Management

B.  

System Architects/Engineers

C.  

Product Owners

D.  

Scrum Masters

E.  

Product Management

Discussion 0
Questions 21

Which responsibility belongs to the Product Owner?

Options:

A.  

Testing Features

B.  

Assigning Pl Objectives

C.  

Prioritizing the Team Backlog

Discussion 0
Questions 22

Which one SAFe core value creates an environment where facts are always friendly?

Options:

A.  

Transparency

B.  

Respect for People and Culture

C.  

Flow

D.  

Innovation

Discussion 0
Questions 23

Iteration Goals serve what purpose?

Options:

A.  

To align team members to a common purpose

B.  

To define the what, the how, and the how much

C.  

To set preliminary PI Objectives

Discussion 0
Questions 24

In the SAFe work item hierarchy, Epics are decomposed into what?

Options:

A.  

Features

B.  

Stories

C.  

Capabilities

Discussion 0
Questions 25

Which SAFe Core Competency incorporates guidance on coordinating trains and suppliers?

Options:

A.  

Enterprise Solution Delivery

B.  

Business Agility

C.  

Measure and Grow

D.  

Lean Portfolio Management

Discussion 0
Questions 26

Why is the problem-solving workshop more effective than traditional lessons learned documents?

Options:

A.  

Collaboration over documentation is a key recommendation of the Agile Manifes-to

B.  

Workshops are more engaging than document writing

C.  

It makes improvements actionable through backlog items for the next Program Increment

Discussion 0
Questions 27

What are two responsibilities of the Release Train Engineer during Program Increment (PI) execution? (Choose two.)

Options:

A.  

To facilitate the System Demo

B.  

To escalate and track impediments

C.  

To formulate and direct decisions on risks

D.  

To make decisions on resource issues for critical bottlenecks

E.  

To direct the management of the communities of practice

Discussion 0
Questions 28

How often should a system demo occur?

Options:

A.  

After the end of each program increment (Pl)

B.  

After every other iteration

C.  

After every release

D.  

After every iteration

Discussion 0
Questions 29

During which part of an Inspect and Adapt event would differences between planned business value and actual business value be presented?

Options:

A.  

Retrospective

B.  

Problem-solving workshop

C.  

Quantitative and qualitative measurement

D.  

PI system demo

Discussion 0
Questions 30

What is the Release Train Engineer's (RTE's) role during the final plan review during PI Planning?

Options:

A.  

Verify that each team's uncommitted objectives have lower business value than the committed PI Objectives to reflect proper prioritization

B.  

Encourage discussion of each team's product Vision as part of the final plan review

C.  

Facilitate all teams when they are presenting their final plans to the entire ART

D.  

Manage the ROAMing of each team's risks

Discussion 0
Questions 31

Which two key skills does a Release Train Engineer bring to economic prioritization? (Choose two.)

Options:

A.  

Do research and data collection for cost of delay factors

B.  

Determine job size by surveying Scrum Masters of impacted teams

C.  

Facilitate stakeholder collaboration

D.  

Coordinate Lean Portfolio Management by providing feedback for cost of delay factors

E.  

Understand and facilitate weighted shortest job first

Discussion 0
Questions 32

Product Management has content authority for the Program Backlog including the Vision, the Roadmap, driving the Pl Objectives, and what else?

Options:

A.  

Establishing Features and benefit hypotheses

B.  

Managing risk, helping to ensure value delivery, and driving continuous improvement

C.  

Working with business stakeholders and Solution and System Architects to implement holistic technology across Value Streams

Discussion 0
Questions 33

During Program Increment (PI) execution, the System Team is unclear about how to test some of the larger Features. What should a Release Train Engineer do?

Options:

A.  

Allow the problem to reach a critical point knowing that a minor failure is a tech-nique for learning

B.  

Encourage the System Team and Product Management to meet and collaborate on a solution

C.  

Escalate the problem to senior management to get the required action

D.  

Direct Product Management to define the use cases for the Features

Discussion 0
Questions 34

Which core competency best describes the critical skills of Scrum, Kanban, and the Built-in Quality practices that are needed to manage the flow of value?

Options:

A.  

Lean Portfolio Management

B.  

Enterprise Solution Delivery

C.  

Agile Product Delivery

D.  

Team and Technical Agility

Discussion 0
Questions 35

Release Train Engineers have the opportunity to regularly practice and improve which two skills? (Choose two.)

Options:

A.  

Servant leadership

B.  

Facilitation

C.  

Test-driven development

D.  

Return on investment projections

E.  

Continuous Integration

Discussion 0
Questions 36

The Release Train Engineer (RTE) learns the teams feel the business value does not re-flect the effort and progress. What are two ways the RTE can provide a better under-standing of what the teams have created? (Choose two.)

Options:

A.  

Educate teams that business value provides the Enterprise with a Metric of how fast the team executed work during the PI

B.  

Coach the Business Owner's review of objectives to see that scoring is against the specific details negotiated with the team during PI Planning

C.  

Illustrate the linkage between business values and the market communica-tions/release objectives tied to the three to six month Enterprise strategy

D.  

Work with the team to ensure they are actively involved when the Business Own-ers score the business value achieved

Publish the team business values and coach teams that these values are for track-ing each Agile Release Train deliverable

Discussion 0
Questions 37

What is an input to the Program Increment Planning process that highlights how Product Management plans to accomplish the Vision?

Options:

A.  

Top ten Features

B.  

Top 20 Features

C.  

Business context

D.  

Program board

Discussion 0
Questions 38

Becoming a coach requires a shift from old behaviors to new ones. What are three ex-amples of old behaviors? (Choose three.)

Options:

A.  

Focusing on deadlines

B.  

Fixing problems for the team

C.  

Driving toward specific outcomes

D.  

Asking the team for the answers

E.  

Facilitating team problem solving

F.  

Focusing on business value delivery

Discussion 0
Questions 39

In addition to Innovation and Planning, what else does the IP Iteration provide time for?

Options:

A.  

An estimating guard band

B.  

An opportunity to integrate and perform end-to-end testing

C.  

Building in quality and compliance

D.  

Additional planned work

Discussion 0
Questions 40

When is one time a Scrum Master may be a participant rather than a facilitator?

Options:

A.  

If the entire team is present during the daily stand-up

B.  

During team breakout sessions at Pl Planning

C.  

When using ad hoc teams for Inspect and Adapt

D.  

When the Agile Release Train does not require any team coordination

Discussion 0
Questions 41

Teams are reporting a high level of success through their individual quantitative meas-urements, but the system results say otherwise. What should the Release Train Engineer do to help the teams deliver more value?

Options:

A.  

Coach the Scrum Masters on good retrospective techniques and ensure teams are defining and taking a systems view approach to improvements

B.  

Share the quantitative measurement results with Product Management and lead-ership and ask for their input

C.  

Diagnose the differences between the measurements and the results and suggest improvement items to each team

D.  

Work with the team that is struggling the most to discover patterns that can be ap-plied to the other teams

Discussion 0
Questions 42

Which SAFe tool might the RTE use to identify areas for an ART to improve how its Con-tinuous Delivery Pipeline (CDP) functions?

Options:

A.  

Agile Product Delivery core competency assessment

B.  

Facilitate a CDP sync every iteration

C.  

Conduct empathy interviews with system architects/engineers

D.  

Architectural runway program backlog enablers

Discussion 0
Questions 43

When is the Inspect and Adapt event held?

Options:

A.  

At the end of every Iteration

B.  

At the end of the Program Increment (PI)

C.  

After the System Demo

D.  

During the Program Increment (PI)

Discussion 0
Questions 44

An Agile Release Train (ART) is frequently discovering compatibility issues between the developed Solution and the Enterprise information architecture. What can the Release Train Engineer do to prevent this from occurring?

Options:

A.  

Develop more detailed Feature definitions

B.  

Add data Architects onto the ART

C.  

Confirm attendance of architectural representatives at Program Increment (PI) Planning

D.  

Conduct the entire data architecture design upfront

Discussion 0
Questions 45

(Which statement is a value from the Agile Manifesto?)

Options:

A.  

Individuals and interactions over processes and tools

B.  

Customer collaboration over following a plan

C.  

Apply systems thinking

D.  

Customer collaboration over a constant indefinite pace

Discussion 0
Questions 46

Some teams are having difficulty identifying where they might make process improve-ments. How might the RTE support them?

Options:

A.  

Encourage the team to perform regular self-assessments and discuss findings

B.  

Conduct a survey to identify the worst problems the team is having

C.  

Observe the team's ceremonies and share observations

D.  

Run longer I&A meetings to brainstorm improvement items

Discussion 0
Questions 47

What can a Release Train Engineer use to support relentless improvement for the Pro-gram Increment?

Options:

A.  

Inspect and Adapt event

B.  

Iteration retrospective

C.  

Product Owner sync

D.  

Release management meeting

Discussion 0
Questions 48

What is one reason an environment of mutual influence is desirable?

Options:

A.  

It provides guardrails for decision making

B.  

It demonstrates Respect for People

C.  

It centralizes decision making

D.  

It helps fund Value Streams

Discussion 0
Questions 49

While facilitating Program Increment (PI) Planning readiness activities, the Release Train Engineer (RTE) notices a Feature that is risky to the teams because the technology is new. Which of the following could reduce the risk?

Options:

A.  

Ensure engineering managers are directing the development process

B.  

Coach the teams to create exploration Enablers

C.  

Ask for a presentation of a detailed design before the PI Planning meeting

D.  

Make sure all the technical specifications are written before PI execution

Discussion 0
Questions 50

What is a key characteristic lean-agile leaders need to have when implementing SAFe?

Options:

A.  

Ensuring compliance with process standards

B.  

Understanding and exhibiting the values, principles and practices

C.  

Emphasizing the enterprise objectives and KPIs

D.  

Keeping roadmaps to no more than a single PI

Discussion 0
Questions 51

The ART is near the end of the final Iteration of its first PI. Integration into staging is more challenging

than estimated. The ART adds a week to the Innovation and Planning (IP) Iteration for integration and

testing. Why is this action considered an anti-pattern?

Options:

A.  

Overall, train velocity goes up, and the time-to-market goes down

B.  

It decreases job satisfaction by removing autonomy and purpose

C.  

It reduces the overall predictability established through cadence and synchronization

D.  

It substantially decreases the predictability of the Solution Intent

Discussion 0
Questions 52

What are two anti-patterns for the IP Iteration? (Choose two.)

Options:

A.  

To minimize lost capacity when people are on vacation or holidays

B.  

To plan work for the IP lteration during P Planning

C.  

To allow for sufficient capacity in the Program Roadmap

D.  

To wait for the IP Iteration to fix defects

E.  

To ensure all Stories and teams' Pl plans are completed prior to the IP Iteration

Discussion 0
Questions 53

When estimating stories, what is the Scrum Master's key responsibility?

Options:

A.  

Ensure the team gives accurate estimates

B.  

Ensure everyone on the team participates

C.  

Provide information about customer needs

D.  

Limit discussion to manage timeboxes

Discussion 0
Questions 54

When planning for a distributed PI Planning with a significant difference in time zones, what is a key

preparation and facilitation focus?

Options:

A.  

Share the outcomes of preparation meetings with local Scrum Masters/Team Coaches (SM/TCs) so they can arrange local rooms

B.  

Split up the PI Planning event per time zone and then have the final plan review, confidence vote, and planning retrospective as one centralized meeting

C.  

Have a single Release Train Engineer (RTE) and technical support person that acts as a central point of communication for all locations

D.  

Adjust the PI agenda to 2.5-3 days, allowing for overlapping hours

Discussion 0
Questions 55

What is one example of a servant leader behavior pattern?

Options:

A.  

Thinks about the day-to-day activities

B.  

Uses authority rather than persuasion when necessary

C.  

Understands and empathizes with others

D.  

Focuses on individual task Metrics

Discussion 0
Questions 56

At the end of day two of the Program Increment (PI) Planning event, the team's final plan review covers what information?

Options:

A.  

Team Features, Stories, and team-level enablers

B.  

Changes to capacity and load, final PI objectives, program risks and impediments

C.  

Changes to iteration goals, measured velocity, and dependencies

D.  

Planned Features, uncommitted objectives, and ROAMed risks

Discussion 0
Questions 57

What is the recommended duration of an Iteration in SAFe?

Options:

A.  

Three weeks

B.  

Two weeks

C.  

Four weeks

D.  

Six weeks

Discussion 0
Questions 58

The team's draft plan review consists of which three items at the end of the first day of the Program Increment (PI) Planning event? (Choose three.)

Options:

A.  

Capacity and load estimates

(Correct)

B.  

Program delivery schedule

C.  

Draft PI Objectives

D.  

Risks and impediments

E.  

Iteration Goals

F.  

Refined team backlogs

Discussion 0
Questions 59

What is a characteristic of an effective Scrum Master?

Options:

A.  

Gives open, honest opinions

B.  

Removes all conflict

C.  

As a technical expert

D.  

Understands customer needs

Discussion 0
Questions 60

Which tool can the Release Train Engineer use to visualize the flow of value?

Options:

A.  

Weighted shorted job first

B.  

Team burn-down charts

C.  

Velocity trend charts

D.  

Kanban systems

Discussion 0
Questions 61

(The teams on the ART just finished the second Iteration in the PI and have nothing to demonstrate at the System Demo. What steps should be taken next?)

Options:

A.  

Stop working on any new functionality and fully integrate and test the system; adjust scope based on learnings

B.  

Require every team demonstrate their team increment to the stakeholders separately in the team branch

C.  

Re-architect the system so that there are no dependencies between the teams, and integration is not needed

D.  

Continue to work on new functionality and reserve time to fully integrate the system during the IP Iteration

Discussion 0
Questions 62

A team is consistently meeting 100% of their PI Objectives. How should the Release Train Engineer

(RTE) respond?

Options:

A.  

Coach the team on their tendency to size Stories too small

B.  

Praise the team for being high performers

C.  

Praise the team for being a cross-functional team

D.  

Coach the team on their tendency to under-commit

Discussion 0
Questions 63

Why would a Release Train Engineer use an Iteration and Program Increment Calendar?

Options:

A.  

To know the cycle time between important team and train events

B.  

To ensure that key ceremonies don't conflict with non-SAFe ceremonies

C.  

To create a BVIR of the important team and ART milestones

D.  

To visualize the Agile Release Train's cadence and synchronization

Discussion 0
Questions 64

What does the "R" in SMART stand for that is used to write PI Objectives?

Options:

A.  

Realistic

B.  

Random

C.  

Rationalized

D.  

Required

Discussion 0
Questions 65

Which of the following roles should help facilitate an ART Sync?

Options:

A.  

Business Owner

B.  

Epic Owner

C.  

Product Owner (PO)

D.  

Product Management

Discussion 0
Questions 66

In the SAFe work item hierarchy, Features are decomposed into what?

Options:

A.  

Stories

B.  

Sub-Tasks

C.  

Tasks

D.  

Capabilities

Discussion 0
Questions 67

Which two activities take place during Team Breakout #1 on the first day of Program In-crement (PI) Planning? (Choose two.)

Options:

A.  

Risks on the teams' planning boards are resolved by the Release Train Engineer

B.  

Teams use color-coding for their backlog items as a reminder that they are re-quired to have all backlog item types on their planning boards

C.  

Draft objectives and uncommitted objectives are written

D.  

All teams' planning boards are visible and use the same color-coding

E.  

Draft objectives are written but do not include exploration Enablers

Discussion 0