Labour Day Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

IBM AIX v7 Administrator Specialty Question and Answers

IBM AIX v7 Administrator Specialty

Last Update May 2, 2024
Total Questions : 46

We are offering FREE S1000-007 IBM exam questions. All you do is to just go and sign up. Give your details, prepare S1000-007 free exam questions and then go for complete pool of IBM AIX v7 Administrator Specialty test questions that will help you more.

S1000-007 pdf

S1000-007 PDF

$35  $99.99
S1000-007 Engine

S1000-007 Testing Engine

$42  $119.99
S1000-007 PDF + Engine

S1000-007 PDF + Testing Engine

$56  $159.99
Questions 1

Which file starts the System Resource Controller?

Options:

A.  

/etc/rc.d/rc.2

B.  

/etc/rc.srcmstr

C.  

/etc/rc.local

D.  

/etc/inittab

Discussion 0
Questions 2

One morning the application owner needed to urgently transfer some files using FTP from Development Dev_DB_Server to the production server - DB_Server, but is receiving the following error:

connect: Connection refused

Note: DB_Server-cannot be shutdown during business hours.

Checking the setup of DB_Serrver, the administrator finds the following entries in /etc/inetd.conf

The administrator also, finds the file /etc/ftpaccess . ctl doesn't exit.

Which two methods can be used to allow files to be transferred to DB Server using FTP?

Options:

A.  

On DBServer run command startsrc -s ftpd and create /etc/ftpaccess-ctl with line "allow: *".

B.  

On DB_Server uncomment line starting with "#f tp" in /etc/inetd.conf and reboot.

C.  

On DBServer run the command /usr/sbin/f tpd.

D.  

On DB_Server uncomment line starting with "#ftp" and run refresh -s inetd.

E.  

On DB_Server run command startsrc -t ftp.

Discussion 0
Questions 3

An administrator is tasked with installing an open source package. They are told to use the IBM AIX Toolbox for Linux Applications because the organization wants to be able to open tickets with IBM support.

What should the administrator tell the requester?

Options:

A.  

IBM offers standard support for open source software that is licensed with the operating system.

B.  

IBM offers extended support for open source software and they need to verify entitlement.

C.  

IBM offers this open source software as-is.

D.  

IBM offers extended support for open source software that is licensed with the hardware.

Discussion 0
Questions 4

While executing the following extendvg command, the system administrator receives the following error:

The administrator used the chvg -t command to fix the error.

What is the implication of running this command?

Options:

A.  

It reduces the maximum number of logical volumes allowed within that volume group.

B.  

It reduces the maximum number of files allowed within that volume group.

C.  

It reduces the maximum file size allowed within that volume group.

D.  

It reduces the maximum number of physical volumes allowed within that volume group.

Discussion 0
Questions 5

When configuring an LPAR profile, what is the meaning of CPU Entitlement?

Options:

A.  

the count of virtual CPUs configured on an LPAR

B.  

the number of logical CPUs allocated to an LPAR

C.  

Simultaneous Multi Threading setting of an LPAR

D.  

the amount of guaranteed CPU time allocated to an LPAR

Discussion 0
Questions 6

A customer calls to complain about slow workload performance but offers no additional details. What should the administrator do next?

Options:

A.  

Ask the caller for additional details.

B.  

Add two more virtual CPUs by DLPAR operation.

C.  

Increase CPU entitlement by 10%

D.  

Add 10% more memory by DLPAR operation

Discussion 0