BICSI Registered Communications Distribution Designer - RCDD Question and Answers

BICSI Registered Communications Distribution Designer - RCDD

Last Update May 3, 2024
Total Questions : 361

We are offering FREE RCDD-002 BICSI exam questions. All you do is to just go and sign up. Give your details, prepare RCDD-002 free exam questions and then go for complete pool of BICSI Registered Communications Distribution Designer - RCDD test questions that will help you more.

RCDD-002 pdf

RCDD-002 PDF

$35  $99.99
RCDD-002 Engine

RCDD-002 Testing Engine

$42  $119.99
RCDD-002 PDF + Engine

RCDD-002 PDF + Testing Engine

$56  $159.99
Questions 1

At the end of the third week of a project, the actual cost of work performed is $7000 USd and the budgeted cost of work performed is $8000 USd. Which of the following is true?

Options:

A.  

The project is under budget.

B.  

The project is budget incorrect.

C.  

The project has been back-end loaded.

D.  

The project is over budget.

Discussion 0
Questions 2

All of the following are true about the post construction phase EXCEPT:

Options:

A.  

The owner is responsible to update the record copy drawings to reflect "as-built" documents.

B.  

The contractors are resolving issues identified on the punch lists.

C.  

The architect is involved in final acceptance and contract closeout activities.

D.  

The construction manager is coordinating removal of construction equipment and job trailers.

Discussion 0
Questions 3

Composite conductors, although not generally recommended, may be used in special circumstances because they provide all of the following advantages EXCEPT:

Options:

A.  

Have good digital transmission characteristics

B.  

Lightweight

C.  

Inexpensive

D.  

Easy to produce

E.  

Easily embedded into other materials

Discussion 0
Questions 4

The public telephone system is an example of a __________ system.

Options:

A.  

Simplex

B.  

Half-duplex

C.  

Full-duplex

D.  

Purely analog

E.  

Purely digital

Discussion 0
Questions 5

A reasonable approximation for the signal speed in 100 ohm balanced twisted pair cable is __________, where c is the velocity of light in free space.

Options:

A.  

0.2 c

B.  

0.4 c

C.  

0.6 c

D.  

08 c

E.  

0.9 c

Discussion 0
Questions 6

On a project with three small conference rooms, a break room, and twelve private offices, what is the MINIMUM number of telecommunications outlet boxes required?

Options:

A.  

16

B.  

24

C.  

28

D.  

40

E.  

46

Discussion 0
Questions 7

Assuming the total fill capacity of a pathway is 100 cables (all of the same cable type and size), the MAXIMUM number of cables to be installed during the initial installation, without exceeding the fill ratio is:

Options:

A.  

25

B.  

40

C.  

50

D.  

60

Discussion 0
Questions 8

Which of the following is NOT a type of connector for optical fiber?

Options:

A.  

LC

B.  

ST

C.  

SFF

D.  

S/FTP

E.  

SC

Discussion 0
Questions 9

If looking to specify an optical fiber backbone within a building going 275 m (902 ft) between the equipment room (ER) and the telecommunications room (TR), what type of fiber should be specified to support a 10 GB ethernet application?

Options:

A.  

OM1

B.  

50 micron multimode

C.  

50 micron laser optimized multimode

D.  

62.5 micron multimode

Discussion 0
Questions 10

The ability of a conductors insulation to transmit an electric field is called:

Options:

A.  

Conductivity

B.  

Transmitability

C.  

Permittivity

D.  

Capacitance

E.  

Reactance

Discussion 0
Questions 11

There are three buildings approximately 400 meters apart and the customer wants to use 10 Gig Ethernet. What fiber should be specified for this application?

Options:

A.  

8 - 9 micron singlemode

B.  

50 micron multimode

C.  

50 micron laser optimized multimode

D.  

62.5 micron multimode

Discussion 0
Questions 12

A conduit run is installed from the ER to a TR. It has two (2) 90 degree bend and a length of 20 m (65 ft). What will be the MINIMUM test rating of the pull cord left in the conduit?

Options:

A.  

20 kg (44 lb)

B.  

40 kg (88 lb)

C.  

60 kg (132 lb)

D.  

90 kg (200 lb)

E.  

100 kg (220 lb)

Discussion 0
Questions 13

Which type of cable tray is best described as a ventilated bottom with side rails?

Options:

A.  

Ventilated channel

B.  

Ladder

C.  

Spline

D.  

Ventilated trough

E.  

Basket tray

Discussion 0
Questions 14

You are designing a horizontal distribution system that will have a zone box located 71.6 m (235 ft) away from the telecommunications room (TR). A 50 mm (2 in) conduit is designed from the TR to a pull box located 36.6 m (120 ft) away from the TR. A 1 1/2 inch conduit is designed from the pull box to the zone box located 35.1 m (115 ft) beyond the pull box. Assuming no conduit bends, and excluding the TR and zone box, what is the total number of pull boxes/pull points required in this horizontal conduit system between the telecommunications room (TR) and zone box?

Options:

A.  

2

B.  

3

C.  

4

D.  

5

Discussion 0
Questions 15

Data representation including code translations, compressions, and encryptions is performed by what layer of the OSI model?

Options:

A.  

Layer 2

B.  

Layer 3

C.  

Layer 4

D.  

Layer 5

E.  

Layer 6

Discussion 0
Questions 16

IPv-4 addresses are ________ bits in length.

Options:

A.  

16

B.  

24

C.  

32

D.  

48

E.  

64

Discussion 0
Questions 17

You have been selected to recommend a solution to increase response time and add fault tolerance to a bank of servers. Your budget is limited and the client needs a solution as soon as possible (ASAP). Which of the following options should be considered with the short time frame and limited budget?

Options:

A.  

Link aggregation

B.  

Device clustering

C.  

Backup network switching devices

D.  

Off site mass storage

E.  

Installation of RAID devices

Discussion 0
Questions 18

You are designing a telecommunications grounding system for a telecommunications room (TR). The TMGB is located 15 m (50 ft) from the telecommunications rack. What is the MINIMUM AWG of the ground conductor required?

Options:

A.  

Two

B.  

Three

C.  

Four

D.  

Six

E.  

Eight

Discussion 0
Questions 19

As a guide, the MAXIMUM recommended DC current value on any bonded conductor should be less than:

Options:

A.  

250 milliamps

B.  

500 milliamps

C.  

750 milliamps

D.  

1 amp

E.  

1.25 amps

Discussion 0
Questions 20

Certain systems must exist relative to bonding and grounding at every site. Which of the following is NOT one such system?

Options:

A.  

AC grounding electrode system (e.g., in some countries it may also be known as the earthing system)

B.  

Telecommunications bonding infrastructure

C.  

Lightning protection system

D.  

Equipment grounding system (e.g., in some countries it may also be known as the equipment bonding system)

Discussion 0
Questions 21

Phase difference is the relationship in time between two waveforms of the same:

Options:

A.  

Power

B.  

Voltage

C.  

Frequency

D.  

Current

Discussion 0
Questions 22

A large telecommunications facility, by most codes, must be designed with an EPO switch located at:

Options:

A.  

The facility entrance or exit

B.  

The main power panel

C.  

Between the main power panel and the transformer

D.  

Near each bank of equipment in the telecommunications space

Discussion 0
Questions 23

Which of the following refers to the increase in the nominal voltage for a duration of 3600 cycles?

Options:

A.  

Swell

B.  

Overvoltage

C.  

Transient

D.  

Sag

Discussion 0
Questions 24

Exhibit:

The diagram below is a typical configuration for:

Options:

A.  

Work area 3-connector permanent link

B.  

Work area 3-connector channel

C.  

Data center 4-connector channel

D.  

Data center 4-connector permanent link

E.  

Work area 4-connector permanent link

Discussion 0
Questions 25

Where backbone cabling exceeds cabling lengths for the same performance or design (for product used in horizontal cabling), there are three fundamental tests which should be considered when testing. They are:

Options:

A.  

Insertion loss (attenuation), return loss, and wiremap/strand identification

B.  

Insertion loss (attenuation), return loss, and continuity

C.  

Insertion loss (attenuation), return loss, and length

D.  

Insertion loss (attenuation), continuity, and wiremap/strand identification

E.  

Continuity, wiremap/strand identification, and propagation delay/delay skew

Discussion 0
Questions 26

Premises optical fiber links should be tested:

Options:

A.  

In one direction at one corresponding wavelength

B.  

In one direction at both corresponding wavelengths

C.  

Bidirectionally at one corresponding wavelength

D.  

Bidirectionally at both corresponding wavelengths

Discussion 0
Questions 27

You are placing Category 6 unshielded twisted-pair (UTP) in cable tray down a hallway past the elevator mechanical room. What action should you take to avoid effects of electromagnetic interference (EMI)?

Options:

A.  

Provide a minimum separation of 1194 mm (47 in)

B.  

Provide a minimum separation of 2060 mm (81 in)

C.  

Require the architect to install metallic foil shielding on the mechanical room walls

D.  

Provide RMC/IMC (rigid metallic conduit/intermediate metal conduit) through all areas within 4.6 m (15 ft) of the mechanical room

Discussion 0
Questions 28

The ability of a device to withstand electromagnetic disturbances from another device is:

Options:

A.  

Electromagnetic interference (EMI)

B.  

Radio Frequency Interference (RFI)

C.  

(EMC)

D.  

Fast transients

E.  

Electrostatic Discharge (ESD)

Discussion 0
Questions 29

A common mode (CM) signal can be converted to a differential mode (DM) signal as a result of a(n):

Options:

A.  

Unbalanced circuit

B.  

Grounded circuit

C.  

Poorly timed signal

D.  

Improper dielectric material

Discussion 0
Questions 30

If a telecommunications grounding busbar is installed in the telecommunications room (TR) with the identifier of 310, located on the third floor, then the telecommunications grounding busbar should be labeled as:

Options:

A.  

TGB-310

B.  

TGB

C.  

TGB in TR 310

D.  

TGB in room 310

E.  

No need to identify as there is only one per TR

Discussion 0
Questions 31

In an industry where a high level of humidity is measured, which type of label should be used?

Options:

A.  

Moisture-induced decay and degradation resistant

B.  

Ultraviolet (UV) light protected

C.  

Heat and cold resistant

D.  

Smudge resistant

E.  

Chemical resistant

Discussion 0
Questions 32

Assume the following:

- An equipment room (ER) consists of 16 racks arranged in 4 equal rows

- The first 4 racks are numbered R1-1 though R1-4

- The second 4 racks are numbered R2-1 through R2-4

- A new equipment shelf with 12 slots is to be installed in the bottom of the third rack in the second row

- Each slot has 2 ports

What would be the identifier of the two ports on the eighth slot of the new equipment shelf?

Options:

A.  

R2-3-1-8-1 and R2-3-1-8-2

B.  

R3-2-1-8-1 and R3-2-1-8-2

C.  

R2-3-1-12-1 and R2-3-1-12-2

D.  

R3-2-1-12-1 and R3-2-1-12-2

E.  

R2-3-12-8-1 and R2-3-12-8-2

Discussion 0
Questions 33

What is the expected life cycle, in years, of building automation system within a building structure with a life cycle of 40+ years?

Options:

A.  

1 to 2

B.  

2 to 4

C.  

5 to 7

D.  

8 to 12

E.  

12 to 15

Discussion 0
Questions 34

If you are using a building automation system (BAS) protocol operating on RF media at 19,200 b/s in the 868 MHz band, which protocol are you using?

Options:

A.  

European installation bus

B.  

Lon Talk

C.  

MODBUS

D.  

LonMark

E.  

Modicon

Discussion 0
Questions 35

Within building automation hardware systems, there is a hierarchical system of micro processor based controllers. Which type of controller is used to provide limited port capacity for connection of sensors, support, and execution of DDC programs, and usually operates in stand alone mode?

Options:

A.  

System level controller

B.  

Field level controller

C.  

Management level processor

D.  

Protocol management system

E.  

DDC manager

Discussion 0
Questions 36

A fire ________ is a contained area that is completely enclosed by fire resistant walls, floors, and ceilings.

Options:

A.  

Rated system

B.  

Stop system

C.  

Wall

D.  

Zone

Discussion 0
Questions 37

What is the PERT estimate (in hours) for project design where:

- Optimistic time is 40 hours

- Most likely time is 50 hours

- Pessimistic time is 60 hours

Options:

A.  

40 hours

B.  

45 hours

C.  

50 hours

D.  

55 hours

E.  

60 hours

Discussion 0
Questions 38

Most types of firestop putty have ________ properties.

Options:

A.  

Water based

B.  

Cementitious

C.  

Intumescent

D.  

Silicone based

Discussion 0
Questions 39

A(n) ________ system is considered a mechanical firestop.

Options:

A.  

Cementitious

B.  

Cable transit

C.  

Firestop block

D.  

Intumescent sheet

Discussion 0
Questions 40

When reviewing a backbone distribution system within a building provided to you for standards compliance, you see that there are several cables with bridge taps built in. Which one of the following options is correct?

Options:

A.  

Ensure all cables meet maximum lengths to ensure standards compliance

B.  

Ensure all cables exceed minimum cable lengths to avoid NEXT(near-end crosstalk)

C.  

Provide recommendations to remove all bridge taps

D.  

Provide recommendations to remove one bridge tap per cable

E.  

Do nothing as the design will pass all design parameters

Discussion 0
Questions 41

In reviewing your client's network needs for today and 5 years into the future, you note their current specs call for a 1Gb/s network within a campus environment, with little or no possibility of any increased bandwidth demands until they move to their planned future site. The building is not large, and the cable lengths will not exceed 550 m (1804 ft). Your recommendation for the fiber to be installed in the backbone is:

Options:

A.  

OM1 fiber

B.  

OM2 fiber

C.  

OM3 fiber

D.  

OM1, OM2, or OM3 will work

E.  

OS1 equipped with attenuators

Discussion 0
Questions 42

When designing a fiber backbone using cable with an armored sheath, a major consideration that you must address is:

Options:

A.  

Type of metal used in the sheath

B.  

Strength of the armored sheath

C.  

Amount of aluminum contained in the armored sheath

D.  

Amount of steel in the sheath as rust is an issue

E.  

Bonding and grounding of the armored sheath

Discussion 0
Questions 43

You are designing a restaurant located within a retail mall. The ambient noise level of the restaurant is 70 dB. The ambient noise level of the mall common space is 75 dB. What is the MINIMUM sound pressure level (SPL) that should be used when designing the paging system within the restaurant?

Options:

A.  

70 dB

B.  

75 dB

C.  

80 dB

D.  

85 dB

Discussion 0
Questions 44

A space has all hard surfaces including architecture and furnishings. The audio programming produced from the distributed sound system has become unintelligible. Which of the following will NOT mitigate the problem?

Options:

A.  

Add tapestries to the walls.

B.  

Provide additional speakers at lower output.

C.  

Increase the volume to the existing speakers.

D.  

Reduce the distance of the existing speakers to the listener.

Discussion 0
Questions 45

What are the three typical voltages used in centrally amplified paging systems?

Options:

A.  

24, 48, and 90

B.  

25, 70, and 100

C.  

25, 90, and 120

D.  

48, 90, and 120

Discussion 0
Questions 46

You have been asked to design a public safety microwave radio system for the city of Fairbanks, Alaska. The requirement for reliability, maximum throughput, and minimum interference by fog, rain, or heavy snow is critical. Which frequency will best suit the system's needs?

Options:

A.  

2.4 GHz

B.  

4.9 GHz

C.  

6.0 GHz

D.  

11.0 GHz

E.  

19.0 GHz

Discussion 0
Questions 47

As a wireless designer, you have been tasked with designing a DAS which supports UHF public safety radios. You have determined that if you increase the power of the base station antenna, you can solve coverage problems in the basement. One of the restrictive items that you should consider is:

Options:

A.  

A single antenna may not provide the total power multiple antennas may provide

B.  

The proper launch amplifier has to be chosen to provide the proper power

C.  

The building's wall types may still affect the coverage

D.  

The legal limits of the transmitter

Discussion 0
Questions 48

What is at the "root" of a DAS (distributive antenna system)?

Options:

A.  

Antenna

B.  

Receiver

C.  

Transmitter

D.  

Transceiver

Discussion 0
Questions 49

You are designing a system requiring the transmission of data. Your system must perform higher than ________ kHz in order to do so.

Options:

A.  

4

B.  

8

C.  

10

D.  

16

E.  

32

Discussion 0
Questions 50

To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.

Options:

A.  

Two

B.  

Four

C.  

Five

D.  

Six

E.  

Eight

Discussion 0
Questions 51

You are designing a multi-story dwelling and need to place the CTR's. Every floor is not available. What is the alternate spacing for the CTRs?

Options:

A.  

Every 2 floors

B.  

Every 3 floors

C.  

Every 4 floors

D.  

Every 5 floors

E.  

1st floor and midway up through the height of the building

Discussion 0
Questions 52

At a minimum, convenience receptacles in an ER or TR are to be located ________ AFF.

Options:

A.  

150 mm (6 in)

B.  

300 mm (12 in)

C.  

375 mm (15 in)

D.  

450 mm (18 in)

Discussion 0
Questions 53

On a survey of one of your client's buildings, you discover that one of the TRs, housing a considerable quantity of switching equipment, is at 25 degrees C (77 degrees F) with a relative humidity of 59 percent. This is considered to be:

Options:

A.  

Within the normal range of temperature and humidity

B.  

High temperature and normal humidity

C.  

Normal temperature and high humidity

D.  

High temperature and high humidity

Discussion 0
Questions 54

You have determined that the equipment room (ER) you are designing will be the minimum size of 15 sq m (160 sq ft) and is servicing 80 but architectural changes will add 175 , which will require you to add a horizontal cross-connect (HC). What size should the equipment room (ER) be?

Options:

A.  

18 sq m (193 sq ft)

B.  

23 sq m (250 sq ft)

C.  

31 sq m (330 sq ft)

D.  

37 sq m (400 sq ft)

E.  

47 sq m (500 sq ft)

Discussion 0