What project cost elements would NOT normally be reflected in the Activity 1000?
The amount of time that an activity can be delayed from its early start date without delaying project completion is called:
Of the following update procedures, which is the least important in achieving an accurate forecast for completion of a construction schedule?
By subtracting a measured unit productivity rate during an impacted period from the unit productivity rate during an unimpacted period, the resulting value represents:
In analyzing a logical chain of activities in a critical path method (CPM) schedule, what do differing total float values within that chain typically indicate?
In its simplest form, what is the main drawback of critical path method scheduling?
Using the "normal" schedule, what is the early finish date of activity 10002 and its total float?

If a detailed estimate is NOT available to assist in the formulation of activity durations but unit quantities have been identified, what information can be utilized to estimate work package/activity durations?
Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?
Under which circumstance should one perform resource-leveling calculations?
The sum of all budgets for work scheduled to be accomplished within a given time period is the ____________.
Schedule forecasts are periodically conducted to project the project schedule performance at completion Which of the following situations would probably result in an incorrect forecast?
During proofing of the product manual, a problem was discovered requiring 15 days additional time to affect a correction. How can the date of availability be maintained?
Determine the correct formula and date for the late finish for Activity 9004.
At the end of month one, did the delay to the parking structure foundation delay the project?
Determine the correct formula and date for the late finish for Activity 6002.
How many workdays occur from the start of the Product Testing to the Product Available milestone?
An earned value-based project control system can use either of which two budgets as the basis of its calculations?
When should the Project Plan have incorporated the relevant interfaces and requirements of the project contract documents?
If someone wanted to constrain a project's end date so that any project slippage would cause negative float, they would do so by using
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):
When should the project documents be reviewed to assess their impact on the organization and administration of a project?
Determine the correct formula and date for the late finish for Activity 9004.

Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?

Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

The congested site only has room for 3 cranes to operate concurrently. Only 1.75 cubic yard ICY] or1.34 cubic meter [CM] concrete buckets are available. Each crane can perform up to 35 lifts per day. Assuming a total of 30 lifts per crane pet day. what is the maximum volume of concrete that could be placed using 3 small tower cranes over a 5-day period?
The Organizational Breakdown Structure (OBS) is a hierarchical structure that does NOT include which of the following:
When a fragnet of activities represents a known schedule risk, which activity will most likely change the overall outcome?
What is the actual duration as of the status date or data date of Activity B?

What method offers the best chance of the schedule being used effectively to implement the project in the field?
Using the "normal" schedule, and assuming you are billing on the last day of the month for previous month and for appropriate partial months, how many invoices will you have for this project?
Which of the following options is NOT a feasible method to reduce the overall completion time of the toll road program?
If Activity E's duration changes to 4 months, what is the overall duration of the project.

Assuming activities 2001 through 2004 comprise the same WBS element, construct a WBS summary activity for activities 2001 through 2004. Use the normal schedule, what is the cost of the activity?
Using the "normal" schedule, if you start Activity 7001 on April 1, 2002, and using a 5-day workweek, what the finish date for Activity 7001?

SUBCO is a potential concrete bridge contractor based in a metropolitan area 300 miles away from your project. They have offered to supply manpower and equipment t BILCO at a per diem rate of $3,000 above their direct labor and equipment rates. In doing a cost benefit analysis, which of the following is NOT a consideration?
As a change to the network for the current update, activity 6002 is required to begin ten days after the beginning of activity 6001. Which is the simplest logic organization?

For the late finish for Activity 11001, select the most appropriate response for transitioning from the forward pass.

Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT
Considering the information provided for the project, what is the factor that most influences the successful crashing of the schedule?