Program Management Professional (PgMP) Question and Answers

Program Management Professional (PgMP)

Last Update Apr 25, 2024
Total Questions : 452

We are offering FREE PgMP PMI exam questions. All you do is to just go and sign up. Give your details, prepare PgMP free exam questions and then go for complete pool of Program Management Professional (PgMP) test questions that will help you more.

PgMP pdf

PgMP PDF

$35  $99.99
PgMP Engine

PgMP Testing Engine

$42  $119.99
PgMP PDF + Engine

PgMP PDF + Testing Engine

$56  $159.99
Questions 1

You are the program manager for your organization. Your program will create a new condominium in your community. There are several concerns about the condos including the timing, the local economy, the environment, and the proposed schedule. You and your team are creating the program management plan to address these concerns along with identifying the constituent projects that will build the structures and deliverables. What group will need to review your program plan to approve the plan before you may proceed in the work?

Options:

A.  

The local government

B.  

The change control board

C.  

The stakeholders

D.  

The program board

Discussion 0
Questions 2

A program manager evaluates conflicting stakeholder demands associated with cost, schedule, and intended benefits. The implementation team has a strong interest in cost and schedule, and a limited interest in the benefits being produced. The client is only focused on benefits.

Which of the following actions should the program manager take?

Options:

A.  

Focus on the internal stakeholders to ensure cost and schedule objectives are achieved.

B.  

Balance stakeholder needs through the use of trade-offs among the stakeholder groups.

C.  

Focus on the external stakeholders to ensure the intended benefits are achieved.

D.  

Conduct a stakeholder meeting to allow everyone to state their priorities.

Discussion 0
Questions 3

You are the project manager for your organization and are working with the project stakeholders and the business analyst to define all of the deliverables the project is to create. The stakeholders would like the option of adding more deliverables later in the project and keeping the requirements somewhat open for changes. You explain to the business analyst that you need a set of requirements that define exactly what needs to be delivered for the project. What document are you trying to create in this early stage of the project?

Options:

A.  

Requirements technical documentation

B.  

Project scope statement

C.  

Project charter

D.  

Detail design document

Discussion 0
Questions 4

What percentage of communication is nonverbal?

Options:

A.  

55 percent

B.  

50 percent

C.  

90 percent

D.  

45 percent

Discussion 0
Questions 5

Ned is the program manager for his organization and he's considering some new materials for his program. He and his team have never worked with these materials before and he wants to ask the vendor for some additional information, a demon, and even some samples. What type of a document should Ned send to the vendor?

Options:

A.  

RFI

B.  

RFP

C.  

RFQ

D.  

IFB

Discussion 0
Questions 6

Over the life of your program you've received many change request forms. Some of the change requests have been approved and some have been declined. Where should you record all change requests and their status?

Options:

A.  

Change register

B.  

Integrated change control

C.  

Program Management Information System

D.  

Change log

Discussion 0
Questions 7

Donna is the project manager for her organization. She is preparing a plan to manage changes to the project

should changes be requested. Her change management plan defines the process for documenting, tracking, and determining if the changes should be approved or declined. What system is considered the parent of the change control system documented in Donna's plan?

Options:

A.  

Quality Management System

B.  

Change Control System

C.  

Project Management Information System

D.  

Integrated Change Control System

Discussion 0
Questions 8

The program manager plans to address a negative cost variance generating a red flag in the program management status report.

What should the program manager do?

Options:

A.  

Contact the project sponsors to present the details, impacts, and possible corrective actions regarding the negative cost variance.

B.  

Gather all the details, analyze impacts, determine corrective actions and present the findings to the governance board for direction.

C.  

Work with program sponsor to compile impact analysis data to obtain additional funding for the program.

D.  

Ask the program team to compile all details, analyze impacts, determine corrective actions and present to the governance board for direction.

Discussion 0
Questions 9

A hotel chain initiates a program to expand meeting offerings to include telecommunications technology and virtual meetings. The program has component projects, each of which requires team members to have different technical skills and expertise. The program manager assembles a team of project managers to lead each of the projects, and learns that the desired resources will not be available at the start of the program.

As a result, the program manager must do which of the following?

Options:

A.  

Utilize team members that are currently available, even though they do not have the expertise needed.

B.  

Assign the tasks on the critical path to the resources available to adhere to the project schedule.

C.  

Delay the start of the program until the assigned resources are available.

D.  

Apply resource leveling considering the constraints of time, budget, and quality.

Discussion 0
Questions 10

You are the program manager for your organization. Part of your role as the program manager is to train John, a new program manager, on the program processes within a program. John is confused as to when the program team can be acquired in the program management lifecycle. When will the program team be acquired for a program?

Options:

A.  

Planning

B.  

Execution

C.  

Monitoring and controlling

D.  

Initiation

Discussion 0
Questions 11

You are the program manager for your organization. Your current program, which has just started, has eight projects and many of the projects share resources such as equipment and people. Management has asked that you identify when the project resources will be utilized on each project within your program. They are worried some resources may be idle or overscheduled. What approach can you use to consider the availability of resources when the project managers begin sequencing their project activities?

Options:

A.  

The project managers will use the critical path method for scheduling activities.

B.  

The project managers will use PERT to schedule all activities.

C.  

The project managers will use the critical chain method for scheduling activities.

D.  

The project managers will create Gantt charts to schedule all activities.

Discussion 0
Questions 12

Which of the following increases when one fast tracks the project?

Options:

A.  

Resource

B.  

Risk

C.  

Cost

D.  

Communication

Discussion 0
Questions 13

A new program is comprised of four component projects. The program manager must assign project managers to each of the four projects. There are eight potential project managers to consider.

What should the program manager do before assigning the project managers?

Options:

A.  

Determine budgetary constraints related to the project managers’ salaries

B.  

Request performance feedback from the project managers’ line managers

C.  

Evaluate the project managers’ skills and match them to the needs of the projects

D.  

Interview each project manager to determine their career aspirations

Discussion 0
Questions 14

You are the program manager for your company and are monitoring and controlling several aspects of your program. You want to make certain that you're including all areas that need to be monitored and controlled. Which one of the following is not something you'll have to monitor and control as a program manager?

Options:

A.  

Materials required by the program

B.  

Equipment your program uses

C.  

Susan the application developer in your program

D.  

Stakeholder identification

Discussion 0
Questions 15

A software deployment program for a multinational organization requires the engagement of subcontractors. During the program planning phase, the contracts manager informs the program manager that the primary subcontractor's agreement includes incentives that would potentially conflict with program objectives.

What should the program manager do first?

Options:

A.  

Review the contracts, and create a program budget contingency.

B.  

Draft a change request for approval by the program steering committee.

C.  

Ask the program management office (PMO) to conduct a risk assessment.

D.  

Review the program charter, and update program objectives accordingly.

Discussion 0
Questions 16

A biometrics firm has a facial recognition program with multiple components and project managers. The

project manager from the mobile device division escalates a vendor-related risk to the program manager. After assessing the risk, the program manager determines that this risk may impact other projects within the program. However, this risk has a low degree of impact and probability of occurring.

What should the program manager do first?

Options:

A.  

Obtain a risk reserve from the executive sponsor, and execute a contingency plan.

B.  

Communicate the risk to all project managers to manage at the component level.

C.  

Add the risk details and analysis to the program risk register.

D.  

Brainstorm with the project manager to develop an appropriate risk response.

Discussion 0
Questions 17

A large international manufacturing company is centralizing its IT which is currently spread over 16 countries. The transition means physically regrouping the infrastructure and aligning processes and organizations. The high-level scope of this transformation encompasses three main areas:

1.The technology area--assessing which technology/tooling should be retained for the target data center.

2.The policies and procedure area--aimed at establishing a common set of processes supporting the new way of delivering services.

3.The HR area--assuring the new organization best fits the diversity of the countries and functional domains, while offering equivalent compensations for comparable functions.

You have selected your team and you are preparing the business case to support 1) the team selections you made and 2) your recommendation to proceed to the program's next phase.

Which document should be present in your business case?

Options:

A.  

A detailed plan showing dependencies among the constituent projects

B.  

A comprehensive analysis of the different compensation packages offered in the 16 countries

C.  

An inventory detailing all physical and logical components in place and the employees in scope

D.  

A cost/benefit analysis of the different scenarios, presenting their respective contributions

Discussion 0
Questions 18

Performing quality assurance in a program can result in which one of the following?

Options:

A.  

Quality control execution

B.  

Scope fulfillment

C.  

Quality management plan

D.  

Change requests

Discussion 0
Questions 19

A company initiates a program to reorganize its sales and production departments. Three production departments are located at the three production plants next to the company’s headquarters. Five regional sales departments are located at different locations around the world.

At this stage of the program, what is the first step?

Options:

A.  

Develop a program work breakdown structure

B.  

Identify and quantify business benefits of the program

C.  

Determine and prioritize the various components of the program

D.  

Prepare a program organization chart covering both sales and production

Discussion 0
Questions 20

An R&D group director approves a major program’s charter. Although the director has a high level of understanding of the program’s scope, they are unsure of how the program manager can be successful in delivering the program’s commitments.

What should the program manager do to align stakeholders with planning and monitoring the program’s progress?

Options:

A.  

Establish high-level program milestones

B.  

Develop an accountability matrix, and assign program roles and responsibilities

C.  

Generate a supplier management plan to identify external stakeholders

D.  

Create a communications management plan, and establish reporting formats

Discussion 0
Questions 21

Which of the following program process outputs includes causes of variances from the program management plan, corrective actions taken and their outcomes, risk mitigations, and other information of value to management and stakeholders of future programs?

Options:

A.  

Lessons learned

B.  

Supporting details

C.  

Program management plan updates

D.  

Assumptions

Discussion 0
Questions 22

You are the program manager for your organization. Your current program has fourteen projects and one project manager in your program is about to close her project. She will need all of the following inputs to the close project process except for which one?

Options:

A.  

Project management plan

B.  

Organizational process assets

C.  

Project deliverables

D.  

Quality control measurements

Discussion 0
Questions 23

You are the program manager of a new program in your organization. This program will last for one year and your program team will work full-time on the effort. The nature of the work requires that the program team work closely together for the next year, but many of the program team members have never met one another. You decide to take the team on an outing where they can work together through challenges, learn teamwork, and get to know one another. This is an example of what process?

Options:

A.  

Cost of quality

B.  

Storming

C.  

Forming

D.  

Team development

Discussion 0
Questions 24

A company wants to perform a preliminary stakeholder analysis to assess a new program's support.

What should the program manager develop?

Options:

A.  

Program communications management plan and the stakeholder charter

B.  

Responsible, accountable, consult, and inform (RACI) matrix, stakeholder list, and escalation process

C.  

Stakeholder strengths, weaknesses, opportunities and threats (SWOT) analysis

D.  

Stakeholder engagement plan, stakeholder register, and stakeholder map

Discussion 0
Questions 25

Your program has a budget at completion of $1,550,000 and is expected to last one year.

Currently your program is 45 percent complete and has spent $725,000. According to the program schedule you are actually to be fifty percent complete by this time, but due to some vendor delays your program is running just a bit late. Based on this information which is performing worse, the cost or schedule?

Options:

A.  

The schedule is performing worse because the SPI is .90

B.  

The cost is performing worse because the EAC is $1,611,111.

C.  

The schedule is performing worse because the SV is -$27,500.

D.  

The cost is performing worse because the CPI is .96.

Discussion 0
Questions 26

You are the program manager for your organization and you are trying to determine the possible outcomes of

a risk event. You're analyzing the risk event's worst case scenario, most likely scenario, and optimistic scenario to simulate the possible affects of the risk on the program's cost, time, and scope ramifications. What simulation technique are you using in this situation?

Options:

A.  

Monte Carlo simulation

B.  

Sensitivity analysis

C.  

Force field analysis

D.  

Decision tree analysis

Discussion 0
Questions 27

If a risk has a probability of 60 percent and an impact of -$57,000 what will the expected monetary value of the risk event be?

Options:

A.  

-$34,200 B. -$57,000 C. -9,500

B.  

You will need to know the utility function of the organization to determine this.

Discussion 0
Questions 28

An ice cream company wants to introduce a new flavor to a new market. The executive sponsor requests a sampling for the test market and the sample group provides negative feedback. As this type of program had previously been conducted by the company, the program manager QUESTION NO:s whether similar results were experienced during testing.

What should the program manager do next?

Options:

A.  

Document the results to share with the program governance board.

B.  

Facilitate another test market sampling.

C.  

Contact the R&D department for product testing results.

D.  

Review the program management information system (PMIS) for lessons learned.

Discussion 0
Questions 29

A program manager is working with the sponsor, stakeholders, and steering committee to formulate a program’s benefits sustainment and transition plan. What should the program manager do to create this plan?

Options:

A.  

Identify key measures to compare expected benefits in the benefits management plan with actual performance once benefits sustainment and program transition starts.

B.  

Assign creation of the benefits sustainment plan to the organization responsible for monitoring and controlling the sustainment period.

C.  

Interview stakeholders, and revise the benefits management plan to provide new insight into the program’s execution and benefits sustainment period.

D.  

Update the benefits management plan, and provide a copy to the organization responsible for measuring the sustainment period.

Discussion 0
Questions 30

External resources are required for a program. The program manager receives bids from multiple vendors and

presents the top vendor to the program governance board. One program governance board member asks the program manager to select a vendor that was dismissed early in the selection process because they were not on the approved vendor list. The program manager learns that this program governance board member has a personal connection to this vendor.

What should the program manager do?

Options:

A.  

Add the vendor to the approved list

B.  

Report an ethics violation

C.  

Agree to engage the vendor due to the program governance board member's program influence

D.  

Initiate a new vendor selection bid process

Discussion 0
Questions 31

A company's marketing department fails an internal compliance audit. To comply with the auditor's remediation plan, the legal department mandates that a content management system (CMS) be implemented. After initiating the program for CMS implementation, the program manager discovers that the marketing department has already preselected which CMS technology will be implemented.

What should the program manager do to ensure the success of the program?

Options:

A.  

Meet with the vice president of purchasing to discuss the risks associated with preselecting a solution before the requirements have been gathered

B.  

Host a kick-off meeting; request preliminary requirements from the marketing department; conduct a design session; present the steering committee with a solution that meets the requirements; and meet with interested vendors

C.  

Ask a senior marketing executive to act as the program sponsor and participate on the steering committee; require steering committee representation from the IT, legal, and other key departments; validate that the chosen solution meets the requirements

D.  

Initiate the program and begin a formal request for proposal (RFP) to validate the chosen solution and gain the confidence of the legal department

Discussion 0
Questions 32

On which of the following documents you work throughout the risk management processes?

Options:

A.  

Risk management plan

B.  

Project management plan

C.  

Risk register

D.  

Project charter

Discussion 0
Questions 33

Which of the following statements are true regarding program scope changes? (Choose three.)

Options:

A.  

Scope changes may originate from the stake holders.

B.  

Change requests for a particular project have to be approved by the project manager irrespective of their potential impact on multiple projects.

C.  

The program has a change control board that analyzes changes at the program level.

D.  

The change control process on a program is often hierarchical.

Discussion 0
Questions 34

You are the program manager for the JQN Program in your organization. There have been some delays in your schedule and you're about to perform some schedule control activities. Which one of the following will not help you as you perform schedule control?

Options:

A.  

Change requests

B.  

Performance reports

C.  

Forecasts

D.  

Earned value management

Discussion 0
Questions 35

Which benefit measurement method considers the value of each time period's return for a project that will create deliverables over multiple time periods?

Options:

A.  

Net present value

B.  

Future value

C.  

Present value

D.  

Cost-Benefit ratio

Discussion 0
Questions 36

You are the program manager for your organization. Management has assigned you to a new program that has been chartered. Your team is in the process of the Manage Program Issues process. One of the two outputs of this process is change requests. Which one of the following is the other one?

Options:

A.  

Audit reports

B.  

Program management plan

C.  

Program performance reports

D.  

Program issues register updates

Discussion 0
Questions 37

Molly is the program manager for her organization. She is creating a document that defines the benefits the program will create for her organization once the program has been completed. What document is Molly writing?

Options:

A.  

Program charter

B.  

Program benefits realization plan

C.  

Program benefits statement

D.  

Program scope statement

Discussion 0
Questions 38

You are the program manager for your organization. Your current program has a budget at completion of

$3,450,000 and is expected to last two years. The program is currently 30 percent complete and has spent ten percent more than what it should have to arrive at this point in the program schedule. Based on this information, what is estimate at completion (EAC) for this program?

Options:

A.  

$2,656,500

B.  

There is not enough information to know. C. $3,795,000

C.  

$1,035,000

Discussion 0
Questions 39

A program manager at a pharmaceutical company plans a new drug development effort. The development is slated to yield three drug variants. The program manager articulates the program scope boundaries.

Which of the following deliverables captures these items?

Options:

A.  

Program scope management plan

B.  

Program governance plan

C.  

Program scope statement

D.  

Program work breakdown structure

Discussion 0
Questions 40

What schedule analysis simulation tool allows you, the project manager, to review possible combinations of events such as optimistic, most likely and pessimistic outcomes for your project?

Options:

Discussion 0
Questions 41

You are the program manager for your organization and working to create the program statement of work for approval by the program director. All of the following information is defined in the program statement of work except for which one?

Options:

A.  

Program requirements for resource competency levels

B.  

Structure of the program management team

C.  

Metrics and qualifications for program acceptance

D.  

Location of the program work

Discussion 0
Questions 42

A program manager has a multiple-project program that is scheduled to be completed by year’s end. During the program delivery phases of the projects, several mandatory changes are identified that would extend the program’s completion date.

What is the next step for the program manager?

Options:

A.  

Apply resource leveling to ensure the program is completed on schedule

B.  

Update the schedule to reflect the extended completion date

C.  

Adjust working hours to ensure the program is completed on schedule

D.  

Submit a change request to extend the program schedule

Discussion 0
Questions 43

A program manager joins a team during its preparation phase.

What should the program manager do to obtain formal sponsor approval to begin the benefits delivery phase?

Options:

A.  

Develop the program management plan based on the organization's strategic plan.

B.  

Write the program charter, including the program mission statement and stakeholder engagement plan.

C.  

Define a high-level program roadmap of milestones and schedules supported by a preliminary estimate.

D.  

Identify and document the anticipated program benefits in the benefits management plan.

Discussion 0
Questions 44

Martha is sharing her experience of her last project as the project manager. She tells that when she presented customer a formal acceptance and sign-off document, they refused to sign, claiming that the product does not meet their expectation. Taking which of the following steps could have been prevented the situation? Each correct answer represents a complete solution. Choose all that apply.

Options:

A.  

Performing quality inspections regularly

B.  

Archiving sign-off at important milestones

C.  

Documenting the requirements

D.  

Completing the project behind the schedule

Discussion 0
Questions 45

You are the program manager for your organization and are working with Tracy, one of the project managers in your program. Tracy is having some trouble understanding the concept of the critical path in her project's network diagram. Which one of the following is the best definition of the critical path?

Options:

A.  

It is the path that carries the most risk of project failure.

B.  

It is the path that reveals the earliest date the project can finish.

C.  

It is the path with the most important activities in the project.

D.  

It is the duration of all the project activities if the labor is summed.

Discussion 0
Questions 46

Which of the following can be an effective tool during quality control to help determine the how the problem occurred?

Options:

A.  

Rework

B.  

Flowcharting

C.  

Trend Analysis

D.  

Pareto Diagram

Discussion 0
Questions 47

Kelly's program is slipping on its schedule. Management is worried that the program will be late and this will cost the organization several thousand dollars in fines and penalties. They've asked Kelly to use a schedule duration compression technique that will help the program finish on time. The technique that Kelly can use, however, should not add costs to the program. What duration compression technique should Kelly use in this instance?

Options:

A.  

Crash the program

B.  

Add lead time to the program

C.  

Trim the program scope

D.  

Fast track the program

Discussion 0
Questions 48

When is the lessons learned document updated?

Options:

A.  

At closing phase

B.  

At planning phase

C.  

Throughout the project lifecycle

D.  

At execution phase

Discussion 0
Questions 49

You are the project manager for the JJY Project, which is similar to the HHG Project you managed last quarter. You would like to model the current project scope on the previous project to save time and effort. This is an example of what kind of scope definition?

Options:

A.  

Analogous estimating

B.  

Organizational process assets

C.  

Parametric scope definition

D.  

Template driven

Discussion 0
Questions 50

An organization is embarking on a new program aligned with its strategic objectives. The new program has a high level of risk due to the rapidly changing technical landscape in which the organization operates. The organization has mature program management capabilities, as measured by its resources, intellectual assets, and management processes.

Given the organization’s history of delivering successful programs, what should the program manager do as part of the planning process?

Options:

A.  

Interview the program managers and stakeholders of previous programs to learn from their experiences.

B.  

Review the organization’s strategic objectives, risk tolerance, and compliance processes, which may provide knowledge about past programs.

C.  

Consult the repository developed as part of the organization’s knowledge management initiative to capture best practices and lessons learned.

D.  

Hire independent industry specialists and subject matter experts (SMEs) to provide additional information about market trends and uncertainties in the external environment.

Discussion 0
Questions 51

The above performance report shows the earned value (EV) analysis for a program. The program director performs a high-level analysis and must present a summary narrative to the steering committee.

What do the current findings show?

Options:

A.  

Project C is running behind schedule and is over budget; projects A, B, and D are on schedule.

B.  

Project A is running ahead of schedule and is under budget; projects B, C, and D are behind schedule.

C.  

The overall program is performing within an acceptable level of variance.

D.  

Project A is running behind schedule and is over budget; projects B, C, and D are on schedule.

Discussion 0
Questions 52

You are the program manager for your company and evaluating the sellers to determine the seller to buy from. In your analysis you've created a histogram to display the pros and cons for each seller. You've created five categories of interest and assigned values to each category for each vendor. Your five categories are:

  • Cost
  • Schedule
  • Experience
  • Certification
  • Warranty

Each category has a different point value and the vendor that receives the maximum points in total will win the contract. What type of seller evaluation are you performing?

Options:

A.  

Monte Carlo simulation

B.  

Expert judgment

C.  

Weighted scoring model

D.  

Benchmarking

Discussion 0
Questions 53

All of the following are resources that you will need to monitor and control in a program environment except for which one?

Options:

A.  

Staff members

B.  

Contracts

C.  

Quality

D.  

Equipment

Discussion 0
Questions 54

You are the program manager for your organization and are working with your team to identify stakeholders in the program. Where should the identified stakeholders and their information be recorded?

Options:

A.  

Stakeholder matrix

B.  

Communications management plan

C.  

Requirements traceability matrix

D.  

Stakeholder registry

Discussion 0
Questions 55

A global financial system is being delivered by the program team to allow access from anywhere in the world. Following a new cross-border regulation applying to privacy of local banking data accessed from abroad, the CEO of the bank requests that an external audit be conducted to validate compliance with this new regulation. This event, which was not anticipated at this phase of the program, will generate additional work for the program team. This effort is not included in the current program roadmap and benefits delivery plan.

What immediate actions should the program manager take?

Options:

A.  

Negotiate with the CEO in an attempt to avoid the audit

B.  

De-scope the capabilities of the system to not allow access from abroad

C.  

Accept the risk of the audit and continue the program as planned

D.  

Assess the impact of the audit and potential remediation on the program

Discussion 0
Questions 56

A program manager building the world’s largest cruise ship is resolving the conflict between the two main sponsors who cannot agree on the number of food and beverage outlets to have onboard. What should the program manager do?

Options:

A.  

Finalize the business case and market analysis with the core program team and present the findings to the chief executive officer for approval.

B.  

Work with the core program team to conduct a market analysis and make the decision based on the best return on investment.

C.  

Arrange a meeting with both sponsors and the steering committee to present the market analysis and work through the conflict.

D.  

Engage the program stakeholders, present the market analysis and findings to facilitate the decision on the best option.

Discussion 0
Questions 57

Which project management meeting allows stakeholders to meet one another and to learn about the project?

Options:

A.  

Project scope review

B.  

Project authorization meeting

C.  

Project status meeting

D.  

Project kick-off meeting

Discussion 0
Questions 58

A program manager has four projects pending approval. Senior management asks the program manager to identify a project for potential elimination based on the return on investment. The program manager has the following information to guide and support the decision:

Which project should the program manager select to be cancelled?

Options:

A.  

Project A

B.  

Project B

C.  

Project C

D.  

Project D

Discussion 0
Questions 59

A program manager prepares the program for review to secure funding by senior management.

Which of the following must the program manager identify when creating the program charter?

Options:

A.  

Milestone dates, budget, and staff details that support it

B.  

Assumptions incorporated into the benefits management plan

C.  

Process within the organization that will be needed to deliver the product

D.  

Key decision makers or stakeholders in the program and their expectations and interests

Discussion 0
Questions 60

A program manager learns that their company’s organizational strategy has changed. This change impacts one component project of a program, misaligning it with both the program objectives and the new organizational strategy. This component project, however, is already 90 percent complete.

What should the program manager do next?

Options:

A.  

Immediately submit a component project closure request to the program sponsor so that resources can be reallocated to strategically aligned component projects.

B.  

Assess the impact of closure on other component projects, and generate a recommendation for submission to the program governance board.

C.  

Recommend that the component project manager complete work activity to deliver benefits to the organization.

D.  

Update the benefits management plan to reflect the impact of the change on the program and its intended benefits.

Discussion 0
Questions 61

Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?

Options:

A.  

Program performance report

B.  

Communications management plan

C.  

Communications log updates

D.  

Information gathering and retrieval system

Discussion 0
Questions 62

An infrastructure program has 20 projects. The first half of these projects incurred multiple change orders and failed to be completed on time. The program manager meets with the project managers to discuss lessons learned and to understand the challenges. During the meeting, the project managers complain that key risks and a lack of resources resulted in missing deadlines.

What should the program manager do to ensure that the remaining 10 component projects stay on track?

Options:

A.  

Rebaseline the remaining component projects.

B.  

Develop a change management strategy.

C.  

Update the program management plan.

D.  

Schedule weekly meetings with the project managers.

Discussion 0
Questions 63

Robert is the program manager of the NHQ Program. His team has never worked with one another before this program and he is worried about their abilities to become a team in very short order. He would like to create a team development exercise to facilitate this process. Robert will need all of the following information except for which one to facilitate team development?

Options:

A.  

Risk management plan

B.  

Program management plan

C.  

Personnel records

D.  

Training records

Discussion 0
Questions 64

You are the program manager for your organization. Your program is about to being initiated and management is asking you for a document that will define all of the required resources, skills, and competencies you'll need in your program. What document defines the skills and competencies for a program?

Options:

A.  

Staffing management plan

B.  

Staffing pool description

C.  

Program resources requirements plan

D.  

Human resources management plan

Discussion 0
Questions 65

You are the program manager for your organization. Management has asked you to create a document that will capture the stakeholders concerns, perceived threats, and specific objectives about the program and its

projects. What document is management asking you to create in this instance?

Options:

A.  

Requirements document

B.  

Project charter

C.  

Business case

D.  

Scope statement

Discussion 0
Questions 66

What is the primary purpose of a project kick-off meeting?

Options:

A.  

To establish why the project has been initiated.

B.  

To establish the direction and purpose of the project management plan.

C.  

To establish the roles and responsibilities of the stakeholders.

D.  

To establish who the project manager and project sponsor are for the project.

Discussion 0
Questions 67

You are the program manager for your program and are creating a communications management plan. Management wants you to address the type of communications based on the number of communication channels you'll have within the program. Currently there are 345 stakeholders in your program but next week you'll have 387 stakeholders. How many more communication channels will you have next week in your program?

Options:

A.  

59,340

B.  

15,351

C.  

861

D.  

74,691

Discussion 0