Labour Day Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

Nutanix Certified Systems Engineer (NCSE): Level 1 Question and Answers

Nutanix Certified Systems Engineer (NCSE): Level 1

Last Update May 2, 2024
Total Questions : 83

We are offering FREE NCSE-Level-1 Nutanix exam questions. All you do is to just go and sign up. Give your details, prepare NCSE-Level-1 free exam questions and then go for complete pool of Nutanix Certified Systems Engineer (NCSE): Level 1 test questions that will help you more.

NCSE-Level-1 pdf

NCSE-Level-1 PDF

$35  $99.99
NCSE-Level-1 Engine

NCSE-Level-1 Testing Engine

$42  $119.99
NCSE-Level-1 PDF + Engine

NCSE-Level-1 PDF + Testing Engine

$56  $159.99
Questions 1

A prospect is evaluating Nutanix for a large number of Oracle RAC deployments. Time to deployment is a top priority, and the prospect has developed a self-service tool in-house to expedite these deployments.

Which Nutanix feature should be discussed?

Options:

A.  

Calm

B.  

Xtract for Databases

C.  

ABS

D.  

REST API

Discussion 0
Questions 2

A prospects need to refresh their environment but has a very small budget for the project. Four years after their last infrastructure refresh, the prospect’s datacenter is only running at 40% utilization. In addition, they have 25 satellite offices. Each office has a requirement to run 4 to 6 VM’s locally.

Which two Nutanix platform capabilities should the SE highlight to address the prospect’s concerns? (Choose two)

Options:

A.  

Multi-Site Management.

B.  

Pay as you grow.

C.  

Automated data storage tiering.

D.  

Software only.

E.  

Single node backup.

Discussion 0
Questions 3

An SE is in the discovery phase with a new customer. The customer is frustrated with the lack of transparency into their environment with the current monitoring tools. The customer has difficulty correlating the degradation of the end user experience with point-in-time events.

Which Prism feature should the SE demonstrate to show relevant value?

Options:

A.  

Analysis page with custom charts and event reporting

B.  

A specific virtual machine's Performance Summary

C.  

Event tab on the Alerts page

D.  

A specific virtual machine's virtual disk Additional Stats

Discussion 0
Questions 4

An SE determines a POC is necessary for a prospect that has struggled with application downtime due to hypervisor and firmware upgrades that have exceeded planned maintenance windows. The prospect has also struggled with infrastructure resource planning for their growing development environment.

Which two success criteria should the SE include? (Choose two)

Options:

A.  

The solution provides integrated reporting on resource utilization trends.

B.  

The solution provides automated upgrades without downtime or performance impact.

C.  

The solution can accelerate VM provisioning through REST APIs.

D.  

The solution supports provisioning new storage in less than 15 minutes.

Discussion 0
Questions 5

ABC Corp currently has 50 VMs currently running in production and is interested in sizing a DR cluster. The RTO is 4 hours and the RPO is 2 hours .

Each VM has 100GB of data, with a 5% daily change rate .for retention the customer wants to keep 2 weeks of snaps on the DR cluster.

What is the minimum amount of storage capacity for the remote cluster to meet the customer's data retention

Options:

A.  

6TB to 7TB

B.  

8TB to 9TB

C.  

10TB to 11TB

D.  

14TB to 15T

Discussion 0
Questions 6

From Which page on portal.nutanix.com can an open case be directly escalated?

Options:

A.  

Home

B.  

View Cases

C.  

360 View

D.  

Case Detail

Discussion 0
Questions 7

An SE is building a solution for Federal government prospect that requires FIPS 140-2 Level 2 encryption for data at rest.

Which two items are required to deliver a solution that meets the encryption standard? (Choose two)

Options:

A.  

Nutanix Acropolis Pro License.

B.  

Self-Encrypting Drives.

C.  

A supported Key Management Server.

D.  

Nutanix Prism Pro Licensing.

E.  

Nutanix Software encryption.

Discussion 0
Questions 8

A prospect indicates a requirement to replicate data offsite for a production workload.

Which three questions the SE ask about the prospect's requirement?

(Choose three.)

Options:

A.  

What are the retention requirements?

B.  

How much data needs to be replicated?

C.  

What OS will be deployed on the server VMs?

D.  

What is the WAN speed and latency between source and target sites?

E.  

Will Prism Pro be licensed for each cluster?

Discussion 0
Questions 9

Which two items represent measurable POC success criteria? (Choose two.)

Options:

A.  

Tested VDI Broker

B.  

Deployed 100 desktops on AHV using Citrix MCS plugin

C.  

Restored VMs from Protection Domain

D.  

Compare Nutanix to existing infrastructure

E.  

Demonstrated Prism

Discussion 0
Questions 10

During a meeting with a fortune 100 prospect, an SE achieves technical buy-in from the architecture team. The prospect shares that their management recently attended an executive briefing with Cisco and was impressed by the vision presented.

Management is pushing the arching the architecture tea to adopt Cisco as their HCI standard based on a beief that Nutanix is not a major player.

Which resource should an SE highlight?

Options:

A.  

Garther magic Quadrant

B.  

ESG Performance Analysis

C.  

Net Promoter Score

D.  

Reference architectures

Discussion 0
Questions 11

A prospect is planning to refresh hundreds of remote locations. Each location has the following configuration:

• 2x HPE DL360 servers running vSphere, each using its own local storage

• 3-4 Windows VMs with no plans to expand

Scheduling the initial meeting to discuss the opportunity has been challenging as the prospect believes a Nutanix solution would be overpriced for their remote site needs.

What are two Nutanix capabilities the SE should highlight to address solution cost concerns? (Choose two.)

Options:

A.  

1 -Node and 2-Node Clusters

B.  

Xi DRaaS

C.  

Foundation

D.  

AHV

Discussion 0
Questions 12

In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow.

Which two test plan items should the SE map to POC success criteria?

(Choose two)

Options:

A.  

Deploy HCIbench to determine maximum IOPS.

B.  

Deploy Calm to automate application deployment.

C.  

Expand the cluster by adding an additional node.

D.  

Use a single interface to manage and monitor the full stack.

E.  

Enable all data efficiency settings.

Discussion 0