Easter Sale Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

Nutanix Certified Services Core Infrastructure Professional Question and Answers

Nutanix Certified Services Core Infrastructure Professional

Last Update May 18, 2024
Total Questions : 302

We are offering FREE NCS-Core Nutanix exam questions. All you do is to just go and sign up. Give your details, prepare NCS-Core free exam questions and then go for complete pool of Nutanix Certified Services Core Infrastructure Professional test questions that will help you more.

NCS-Core pdf

NCS-Core PDF

$35  $99.99
NCS-Core Engine

NCS-Core Testing Engine

$42  $119.99
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$56  $159.99
Questions 1

Where in the Support Portal is the Best Practices guide for vSphere Networking located?

Options:

A.  

Product Notices

B.  

Solutions Documentation

C.  

Software Documentation

D.  

Knowledge Base

Discussion 0
Questions 2

What is the minimum number of nodes required for a Nutanix Cluster to support Replication Factor 3 (RF3) on a storage container?

Options:

A.  

3

B.  

4

C.  

5

D.  

6

Discussion 0
Questions 3

An administrator is deploying an application that requires maximum I/O throughput for scratch data. The administrator is concerned that the throughput requirement is greater than what can be provided by asingle cluster node.

What should the administrator do to meet this requirement?

Options:

A.  

Create a volume group with several virtual disks and attach to the VM

B.  

Create a volume group with one virtual disk attached to the VM

C.  

Create a virtual disk attached tothe VM's PCI interface

D.  

Create several virtual disks attached to the VM's virtual SCSI controller

Discussion 0
Questions 4

An administrator receives reports about a Nutanix environment. The investigation finds the following;

• VMs are experiencing very high latency

• Each node is equipped with a single SSD, utilized at 95%

• Each node is equipped with three HDDs, utilized at 40%

Why are the guest VMs experiencing high latency?

Options:

A.  

CVMs are overwhelmed by disk balancing operations.

B.  

All VM write operations are going to HDD.

C.  

All VM read operations are coming from HDD.

D.  

VMs are unable to perform write operations.

Discussion 0
Questions 5

An administrator is performing a set of routine checks and notes that Prism Central is running with 4 vCPUs and 21 GB RAM. The organizations environment is based on two Nutanix clusters with 170 VMs plus a Legacy vSphere infrastructure. No manual changes have been done on Prism Central VM.

Which configuration justifies the current Prism Central configuration?

Options:

A.  

Nutanix Move is running on Prism Central to import VMs from the Legacy Cluster.

B.  

Prism Central was installed for Large Deployment environments.

C.  

Prism Central is running on the legacy duster and requires more RAM.

D.  

Nutanix Leapand Nutanix Flow have been enabled on Prism Central

Discussion 0
Questions 6

During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.

Which log should the consultant review to determine the cause?

Options:

A.  

service.log

B.  

foundation.out

C.  

first_boot.log

D.  

genesis.out

Discussion 0
Questions 7

A customer buys ultimate licensing and wants to use the built-in Nutanix software encryption on their new AHV cluster. The customer needs to create three storage containers and asks the consultant to complete the process as fast as possible.

In which order should the cluster be deployed?

Options:

A.  

Create Cluster -> Install License Key -> Encrypt Cluster -> Create Storage Containers

B.  

Create Cluster -> Install License Key -> Create Storage Containers -> Encrypt Cluster

C.  

Create Cluster -> Encrypt Cluster -> Install License Key -> Create Storage Containers

D.  

Create Cluster -> Create Storage Containers -> Encrypt Cluster -> Install License Key

Discussion 0
Questions 8

After a consultant runs Foundation, the imaging process fails.

In which two locations can the consultant find the logs? (Choose two.)

Options:

A.  

On the Hypervisor - /home/nutanix/foundation/logs

B.  

Logs link on the Foundation Imaging Screen

C.  

On the Foundation VM - /home/nutanix/foundation/logs

D.  

On the CVM - /home/Nutanix/foundation/logs

Discussion 0
Questions 9

An administrator needs to maximize storage potential in a six-node cluster. The container is configured with the following:

  • Post-process compression
  • Capacity deduplication

What should the administrator configure to increase space savings?

Options:

A.  

Erasure coding

B.  

Inline compression

C.  

Reserve capacity

D.  

Cache dedupe

Discussion 0
Questions 10

An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.

How should the administrator perform this task?

Options:

A.  

Check the Disregard Existing Workloads radio button in the Runway scenario.

B.  

Check the Disregard Existing Nodes radio button in the Runway scenario.

C.  

Add up the recovered workloads and manually remove from the Runway configuration.

D.  

Power down the workloads during a maintenance window and run the Capacity Runway.

Discussion 0
Questions 11

An organization subscribes to field advisories from the Nutanix support portal. An administrator receives an email about a rare problem that could cause cluster instability and affect the entire AOS cluster. The organization is running Vmware vsphere 6.x on Nutanix.

What action should be taken to resolve this issue?

Options:

A.  

Open Prism Element and select Upgrade Software to update AOS.

B.  

File a ticket to NutanixSupport and provide the Field Advisory ID.

C.  

Use VMware Update Manager to update the cluster.

D.  

In Prism Central, select Life Cycle Management and perform LCM update.

Discussion 0
Questions 12

A Nutanix cluster has 10TB usable storage. The customer wants to create a 100GB datastore for ISO images to eliminate too much storage being consumed by unnecessary images.

Which setting should be used to accomplish this goal?

Options:

A.  

From Container Advanced Settings, configure 100GB for advertised capacity.

B.  

From Container Advanced Settings, enable erasure coding.

C.  

From Container Advanced Settings, turn on compression and deduplication.

D.  

From Container Advanced Settings, configure 100GB for reserved capacity.

Discussion 0
Questions 13

In a 20-node ESXi deployment, the customer needs additional resiliency to survive the loss of two nodes concurrently.

Which configuration should the consultant use to ensure that the appropriate resources are available?

Options:

A.  

Storage reservation for 10%; HA admission control for 10%, cluster RF3

B.  

Storage reservation for 5%; HA admission control for 5%, cluster RF2

C.  

Storage reservation for 5%; HA admission control for 5%, cluster RF3

D.  

Storage reservation for 10%; HA admission control for 10%, cluster RF2

Discussion 0
Questions 14

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.

Which option should be used to resolve this issue?

Options:

A.  

If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.

B.  

Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.

C.  

Verify that IPv6 Link Local and DHCP is enabled on all switch ports.

D.  

If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.

Discussion 0
Questions 15

A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.

Which action should the consultant take to resolve this issue?

Options:

A.  

Confirm that IPv6 is enabled on the guest VM.

B.  

Confirm that the VM vNIC is tied to the correct VLAN in Prism Element.

C.  

Mount and install the Nutanix Guest Tools.

D.  

Set a Group Policy to make sure the Windows Firewall is disabled.

Discussion 0
Questions 16

Refer to the exhibit.

An administrator logs in to Prism and sees the status shown in the exhibit within the Hardware Diagram section.

What should the administrator do?

Options:

A.  

Resolve all alerts and re-import the disks to make sure there is no service disruption.

B.  

Restart all CVMs for the cluster to check, confirm health and repartition and add the disks.

C.  

Reseat all disks immediately. If this does not help, reseat the nodes.

D.  

Check status of applications running onthe cluster and call support

Discussion 0
Questions 17

A VM does not have enough resources for the demand,which leads to performance bottlenecks. The VM is exhibiting one or more of following baseline values, based on the past 30 days:

• CPU usage > 90% (moderate), 95% (high)

• CPU ready time > 5%, 10%

• Memory usage > 90%, 95%

• Memory swap rate > 0Kbps (no moderate value)

Which type of VM is being described?

Options:

A.  

Constrained VM

B.  

Bully VM

C.  

Inactive VM

D.  

Over-provisioned VM

Discussion 0
Questions 18

Refer to the exhibit.

An administrator is commissioning a Nutanix Enterprise Cloud. Once the user VMs have been deployed and are running, the administrator finds that VMs on the same host are able to communicate, but are unable to communicate between hosts.

What must be changed to enable full inter-VM communications?

Options:

A.  

Change the network the VMs are connected to

B.  

Change the spanning-tree port type on the switch

C.  

The VMs need to have static IPaddresses

D.  

Update the switch to specifically allow VLAN 15

Discussion 0
Questions 19

An administrator iscurrently using both 10g uplink with LACP and balance-tcp. A single VM should not be allowed to use more than a single 10G uplink, and both uplinks should be utilized.

Which two command should be used to configure the bond? (choose two)

Options:

A.  

Ovs-vsctl set port br0-up bond_mode=balance-slb

B.  

Ovs-vsctl set port br0-up bond_mode=balance-tcp

C.  

Ovs-vsctl set port br0-up bond_mode=active-backup

D.  

Ovs-vsctl set port br0-up other_config: bond-rebalance-interval=30000

Discussion 0
Questions 20

An administrator deletes a large amount of data from a Volume Group presented to a Linux VM. The administrator notices that the deleted data has not been reclaimed as usable storage.

Whataction should be taken to reclaim the storage capacity?

Options:

A.  

Shrink the Volume Group that is associated with the Linux VM

B.  

Unmount the Volume Group and then Remount the Volume Group

C.  

Enable the unman operation on the Linux VM

D.  

Run Defrag on the Linux VM

Discussion 0
Questions 21

A customer wants to know the details of network validation testing.

Where can the consultant find this information?

Options:

A.  

Handover checklist

B.  

Test plan

C.  

Operations Guides

D.  

As-Built Guide

Discussion 0
Questions 22

After installation, network ports are properly configured with the default active-backup bonding.

One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.

What should the consultant enable to resolve this issue?

Options:

A.  

LACP on switch

B.  

PAgP

C.  

Portfast

D.  

Jumbo frames

Discussion 0
Questions 23

A consultant notices while assigning VLAN tags to hosts and CVMs in a running cluster, that Prism Element displays alerts indicating a node is down.

What should the consultant do to prevent these alerts?

Options:

A.  

Restart the Nutanix cluster.

B.  

Only change the Controller Virtual Machine VLANs.

C.  

Only change the hypervisor VLANs.

D.  

Stop the Nutanix cluster before changing VLANs.

Discussion 0
Questions 24

A customer wants to expand an existing cluster with three additional nodes. After running the Foundation process on the new nodes, the customer realizes that the wrong IPs where used and the nodes are configured on a different network. The customer decides to create a new cluster instead.

Which method should be used to recreate the cluster?

Options:

A.  

Log into IPMI and use cluster create command to create the cluster.

B.  

Log into CVM and use cluster create command to create the cluster.

C.  

Log into Hypervisor and use cluster create command to create the cluster.

D.  

Foundation all nodes again and create the cluster.

Discussion 0
Questions 25

An administrator deploys Exchange on a Nutanix cluster. The administrator creates two containers with RF2 configuration:

• One container for Exchange

• One container for the other VMs

The Exchange VM isexperiencing I/O performance issues.

Which changes to Storage Optimization should be used on the Exchange container to enhance I/O performance?

Options:

A.  

No data reduction

B.  

Post process Deduplication only

C.  

Inline compression and EC-X

D.  

Inline compression andDeduplication

Discussion 0
Questions 26

A consultant creates an AHV cluster and connects the Intel X550T NICs to the top of rack switch using Twinax cables. The activity and link lights are green. The cluster cannot communicate over the 10GbE link.

What is the first command the consultant should perform to troubleshoot the issue?

Options:

A.  

manage_ovs show_bridges

B.  

manage_ovs show_interfaces

C.  

manage_ovs update_uplinks

D.  

manage_ovs show_uplinks

Discussion 0
Questions 27

A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.

Which method can be used to successfully add the node?

Options:

A.  

Upgrade the cluster to 5.9 and add the node through Prism Element.

B.  

Use Prism Element to Expand the cluster and select the re-image option.

C.  

Use the CLI and enter cluster add-node node-serial=”node_serial”.

D.  

Use Prism Element, which will downgrade the node by default during the node add process.

Discussion 0
Questions 28

An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issues. The Windows VMs do not experience the same issue.

Which option should the administrator use to resolve this issue?

Options:

A.  

Utilize Jumbo Frames

B.  

Add additional disks to the Volume Group

C.  

Set the SCSI timeout value to 60

D.  

Utilize a separate subnet for the Linux VMs

Discussion 0