Pre-Summer Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

ExamsBrite Dumps

Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5 Question and Answers

Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5

Last Update May 30, 2026
Total Questions : 109

We are offering FREE NCP-BC-7.5 Nutanix exam questions. All you do is to just go and sign up. Give your details, prepare NCP-BC-7.5 free exam questions and then go for complete pool of Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5 test questions that will help you more.

NCP-BC-7.5 pdf

NCP-BC-7.5 PDF

$36.75  $104.99
NCP-BC-7.5 Engine

NCP-BC-7.5 Testing Engine

$43.75  $124.99
NCP-BC-7.5 PDF + Engine

NCP-BC-7.5 PDF + Testing Engine

$57.75  $164.99
Questions 1

Which ports must remain open to support replication between two Prism Element clusters?

Options:

A.  

UDP 500 and UDP 4500

B.  

TCP 2009 and TCP 2020

C.  

TCP 22 and TCP 3389

D.  

TCP 80 and TCP 443

Discussion 0
Questions 2

An administrator is tasked with ensuring the VMs do not experience downtime during an upcoming network maintenance on the primary cluster. The VMs are protected by a Protection Policy and are configured under a Recovery Plan. What failover mechanism should the administrator use to ensure the VMs are available on the target cluster before the maintenance window?

Options:

A.  

Unplanned Failover

B.  

Planned Failover

C.  

Validate the Recovery Plan

D.  

Test Failover

Discussion 0
Questions 3

A company ' s two clusters are part of the same availability zone. Prism Central, which holds the protection policy configuration and recovery plans, is located on Cluster A and protected by the Prism Central Backup and Restore mechanism. What is the first step to take to execute a disaster recovery plan on the datacenter hosting Cluster A?

Options:

A.  

Restore the Prism Central instance from Prism Element on the surviving cluster.

B.  

Deploy a new Prism Central instance on the surviving cluster and register the cluster to it to access the replicated VM snapshots.

C.  

Log into Prism Element on the surviving cluster and execute the Recovery Plan.

D.  

Access the Prism Central web interface via its Floating IP to trigger the " Unplanned Failover " workflow for the affected VMs.

Discussion 0
Questions 4

An administrator migrates a guest VM from a legacy Protection Domain–based DR configuration to a Prism Central (PC)–based Protection Policy. Immediately after migration, the administrator considers deleting the legacy Protection Domain snapshots to reclaim storage. According to Nutanix guidance, when is it safe to delete the legacy Protection Domain snapshots?

Options:

A.  

Immediately after assigning the VM to a Protection Policy

B.  

After performing a planned failover

C.  

After validating the recovery plan

D.  

After the first recovery point for the VM is available in PC

Discussion 0
Questions 5

A Nutanix protection policy is configured with:

    RPO: 1 hour,

    Retention period: 5 days,

    Retention type: Roll-up.

After six days of continuous operation, approximately how many hourly recovery points will still be available for restores for the most recent 24-hour period?

Options:

A.  

0 hourly recovery points — only daily roll-ups are kept

B.  

1 hourly recovery point — the latest only

C.  

24 hourly recovery points — the last day only

D.  

120 hourly recovery points — all hourly snapshots from 5 days

Discussion 0
Questions 6

An organization is implementing a Disaster Recovery solution to protect critical workloads by failing them over to a NC2-on-Azure cluster. The administrator needs to ensure that when VMs failover to Azure, their IP addresses are predictable and consistent with the application requirements. Which configuration strategy should the administrator use in the Recovery Plan to achieve predictable IP assignment?

Options:

A.  

Rely on the IPAM networks of the NC2 cluster to maintain the IP assignments.

B.  

Configure custom IP mapping to assign specific IP addresses to the VMs.

C.  

Rely on the default behavior where the last octet of the source IP is preserved.

D.  

Configure In-Guest scripts for NGT to maintain the static IP assignments.

Discussion 0
Questions 7

A Protection Domain exists with a VM, but no new snapshots are being created and replication never starts. Which is the most likely DR setup issue?

Options:

A.  

The Protection Domain has no entities that are protected

B.  

The Protection Domain has no schedule configured

C.  

The remote site has no vStore mapping

D.  

Bandwidth throttling is set too low

Discussion 0
Questions 8

Two AHV clusters are 4 ms RTT apart. The business requires:

    0 RPO

    Automatic failover

    No application performance degradation

    Hybrid HCI nodes with 100 TB capacity

What storage configuration must be validated before enabling synchronous replication?

Options:

A.  

Minimum one SSD per node

B.  

No SSD requirement for synchronous replication

C.  

Minimum two SSDs at 10% capacity per node

D.  

Only HDD capacity matters

Discussion 0
Questions 9

An administrator has received the following alert:

Replication was skipped for protection domain < Protection Domain Name > of the latest snapshot < Snapshot ID > to remote site < Remote Cluster Name > . Replication was skipped as a newer Recovery Point was available snapshots that may have been skipped.

The administrator begins gathering troubleshooting information and determines the following:

    The VM has been replicating to this cluster successfully for at least 6 months

    The bandwidth has been sufficient to this point and hasn ' t caused an issue before

    Network connectivity is good and all necessary ports remain open and reachable

    There aren ' t hardware issues, and software is up to date

What else could have caused this alert?

Options:

A.  

Protection Policy schedule was temporarily paused.

B.  

This was a first seed replication without a reference snapshot.

C.  

A new Availability Zone was paired to Prism Central.

D.  

The VM had a significant one-time surge in change rate.

Discussion 0
Questions 10

An organization uses a Recovery Plan to protect a SQL Cluster that relies on Volume Groups (VGs). The VGs are configured with hypervisor attachments. The administrator executes a Planned Failover to migrate the SQL Cluster to the Recovery Site. The Failover task completes successfully, but the database administrators report that the database is offline. What is the possible cause of this issue?

Options:

A.  

An administrator failed to configure Protection Domains replication.

B.  

VGs configured with hypervisor attachments do not reattach automatically after recovery.

C.  

VGs cannot be protected by Recovery Plans.

D.  

An administrator failed to configure mapping for the Storage Network in the Recovery Plan.

Discussion 0
Questions 11

An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ to a Nutanix Cloud Cluster (NC2) on AWS. The Recovery Plan completes, and the VMs are running. However, external users cannot access the websites hosted on these VMs. The administrator verifies that the firewall rules are set correctly. What specific configuration is required for these VMs to be reachable from the external network after failover to NC2?

Options:

A.  

The administrator must enable Promiscuous Mode on the NC2 virtual switch.

B.  

Floating IP addresses must be configured for the guest VMs.

C.  

A VPN connection must be established between the NC2 cluster and the external users.

D.  

The VMs must be migrated to a stretched L2 subnet.

Discussion 0
Questions 12

A security team has detected a ransomware attack that began encrypting files on the primary site at 2:00 AM. By 2:45 AM, the primary site is still accessible but workloads are compromised. The administrator needs to recover to a known-good state from before the attack.

Which statement shows the action and reasoning that the administrator should consider?

Options:

A.  

Test Failover, to validate the recovery point in isolation before committing to a full failover.

B.  

Planned Failover, as the primary site is still accessible and a clean final snapshot can be created before failing over.

C.  

Planned Failover, as it guarantees zero data loss by capturing the most current state of all VMs.

D.  

Unplanned Failover, as it allows the administrator to select a specific recovery point in time.

Discussion 0
Questions 13

An administrator is testing the failover scenarios from a source availability zone (AZ1) to a destination availability zone (AZ2). The administrator successfully performs an unplanned failover from AZ1 to AZ2. The administrator then immediately tries to use the unplanned failover option to fail the VM back to AZ1, but does not see the VM listed under Recovery Plan. What could be the cause?

Options:

A.  

Recovery Plan is not bi-directional.

B.  

Replication is not yet successful from AZ2 to AZ1.

C.  

Clean up of Entities is needed to perform failback.

D.  

Unplanned failover cannot be used to failback VMs.

Discussion 0
Questions 14

What snapshot recovery point interval does Self-Service Restore support in a Nearsync setup?

Options:

A.  

15 minutes

B.  

30 minutes

C.  

1 hour

D.  

4 hours

Discussion 0
Questions 15

A solution architect designs a protection policy in Prism Central to protect a specific set of VMs. The design calls for synchronous replication to two separate availability zones (AZs) simultaneously to ensure zero data loss at multiple physical locations. Which configuration limitation prevents the implementation of this specific design?

Options:

A.  

Synchronous replication requires a minimum RPO of 1 hour when targeting multiple sites.

B.  

Prism Central prevents pairing with more than one AZ at a time.

C.  

A protection policy supports only one synchronous replication schedule.

D.  

Synchronous replication is restricted to Protection Domains and cannot be used in Protection Policies.

Discussion 0
Questions 16

A VM is configured with a 5-minute Nearsync RPO. After several hours, replication transitions back to hourly RPO. Alerts indicate the minute schedule cannot be maintained. What is the most likely root cause?

Options:

A.  

RTT is greater than 5 ms.

B.  

Only one recovery plan exists.

C.  

Reverse synchronization is disabled.

D.  

Bandwidth is insufficient.

Discussion 0
Questions 17

A financial institution is designing a disaster recovery solution for a business-critical application that requires a zero recovery point objective (RPO). The infrastructure team decides to implement Nutanix Metro Availability between two physical data centers (DC-Alpha and DC-Beta) interconnected by a dedicated dark fiber. What is the maximum possible network latency on this link for this configuration to function correctly?

Options:

A.  

5 ms

B.  

10 ms

C.  

20 ms

D.  

100 ms

Discussion 0
Questions 18

What must be installed on a guest VM prior to enabling Self-Service Restore?

Options:

A.  

Post_Thaw Scripts

B.  

NGT

C.  

Pre_Freeze Scripts

D.  

VirtIO

Discussion 0
Questions 19

An organization requires strict control over data destruction. An administrator configures an Approval Policy for DR snapshots to prevent accidental deletion. A user attempts to delete a recovery point protected by this policy. What is the immediate outcome of this deletion attempt within the Prism Central interface?

Options:

A.  

The operation is blocked, and an email notification is sent to the super-admin for review.

B.  

The operation triggers an approval request, which changes the action status to " Pending Approval " .

C.  

The snapshot is marked for deletion but remains recoverable for 24 hours in the recycle bin.

D.  

The operation fails immediately with an " Access Denied " error message.

Discussion 0
Questions 20

What must the maximum Round Trip Latency be less than between a Witness VM and Metro Availability PDs?

Options:

A.  

5ms

B.  

100ms

C.  

200ms

D.  

500ms

Discussion 0
Questions 21

An administrator at a retail company is preparing to apply a critical OS security patch to a production SQL Server VM. Before starting, the administrator ensures the VM is part of a Protection Domain and manually creates a local snapshot (Recovery Point). Ten minutes after the patch is applied, the SQL service fails to start, and the database logs indicate corruption in the system registry. The administrator needs to return the VM to its functional state from ten minutes ago as quickly as possible. The administrator decides to perform a Restore from the local snapshot. Under which condition would an In-place Restore (Revert) fail, forcing the administrator to use the Clone (Out-of-place) option instead?

Options:

A.  

NGT (Nutanix Guest Tools) version was updated immediately after the snapshot.

B.  

The VM ' s memory was increased from 16GB to 32GB to accommodate the patch installation.

C.  

The VM is currently powered on and cannot be shut down.

D.  

A new 50GB data disk was added to the VM configuration after the snapshot was taken.

Discussion 0
Questions 22

An administrator managing critical VMs has been tasked with designing a Disaster Recovery solution where the VMs are brought up on the target cluster if the source cluster experience any issues. The failover needs to be triggered without any user intervention and with minimal downtime. What automatic failure execution solution is best suited?

Options:

A.  

Nearsync Protection policy and no witness VM

B.  

Synchronous Protection policy with witness VM

C.  

Synchronous Protection policy and no witness VM

D.  

Asynchronous Protection policy with witness VM

Discussion 0
Questions 23

An administrator has set up asynchronous replication between the Marseille and Paris clusters for the VMs in the FIN-PROD storage container. After a planned production failover from Paris to Marseille, the administrator noticed that the VMs were scattered across all the storage containers in the Marseille cluster. Which statement is true regarding this scenario?

Options:

A.  

The recovery plan did not contain a valid network mapping.

B.  

The recovery plan did not contain a valid storage mapping.

C.  

The FIN-PROD storage container does not exist on Marseille cluster.

D.  

A storage policy is setup on the Paris cluster and missing on the Marseille cluster.

Discussion 0
Questions 24

After a storage failover in a synchronous replication environment, users report higher I/O latency and degraded performance compared to pre-failover levels. Cluster health is normal, and replication is functioning correctly. Which post-failover cleanup action could the administrator perform to correct the performance issue?

Options:

A.  

Increase the snapshot retention period of the affected VMs.

B.  

Manually realign the compute and storage locations of the affected VMs.

C.  

Reconfigure the replication schedule of the affected VMs.

D.  

Wait for Acropolis Dynamic Scheduler to rebalance the workloads of the affected VMs.

Discussion 0
Questions 25

An administrator is planning a scheduled maintenance window that will temporarily interrupt network connectivity between the primary and recovery sites. Several Tier 1 VMs are protected with a Synchronous replication Protection Policy. What must the administrator do before beginning the maintenance window to prevent these VMs from becoming unresponsive without making RPO changes?

Options:

A.  

Execute an Unplanned Failover to move the VMs to the recovery site before the maintenance window begins.

B.  

Manually pause Synchronous replication in Prism Central before the maintenance window begins.

C.  

Change the Protection Policy from Synchronous to Asynchronous replication prior to the maintenance window.

D.  

Update the Synchronous replication policy to enable manual failover handling.

Discussion 0
Questions 26

While attempting to execute a Commvault backup plan, an administrator received the following error for several VMs: " Virtual Machine not found " . After confirming the VMs exist, the administrator finds the following related error message: " Event Code 91:4 Virtual machine [Nutanix-Web-Server] was not found. Please verify that the virtual machine still exists and that the host is in the connected state. " Which action should the administrator take to enable successful backups?

Options:

A.  

Ensure primary and recovery clusters are not registered to the same KMS.

B.  

Ensure the VM is created with local Key Management Server (KMS).

C.  

Upgrade Nutanix Guest Tools (NGT) on the VM to the latest version.

D.  

Ensure Virtual Trusted Platform Module (vTPM) is disabled on the VMs.

Discussion 0
Questions 27

A Protection Policy is configured with a Nearsync replication schedule (15-minute RPO). An administrator observes that the system has temporarily transitioned to an hourly replication schedule. Which scenario would cause this automatic transition from Nearsync to Asynchronous (hourly) replication?

Options:

A.  

The Nutanix Cloud Infrastructure license expired.

B.  

The bandwidth is insufficient for the change rate.

C.  

A new VM was added to the protection category, triggering a full initial sync.

D.  

A Test Failover operation is currently running on the recovery site.

Discussion 0
Questions 28

An administrator is evaluating Nearsync for critical VMs in a Nutanix Disaster Recovery environment. What is the minimum RPO, in minutes, supported by Nearsync replication?

Options:

A.  

0

B.  

1

C.  

15

D.  

60

Discussion 0
Questions 29

A Veeam backup job is configured to use Nutanix application-consistent snapshots for several Windows VMs. Crash-consistent snapshots succeed, but Veeam reports that application-consistent snapshots fail with errors related to VSS processing. Upon investigation, the administrator confirms:

    The VMs are powered on.

    Network connectivity between the backup server and cluster is healthy.

Which configuration should the administrator verify to resolve the issue?

Options:

A.  

Enable incremental backups on the VMs.

B.  

Ensure NGT is installed on the VMs.

C.  

Increase the snapshot retention count.

D.  

Configure synchronous replication.

Discussion 0
Questions 30

During routine monitoring, an administrator notices that replication from the primary Nutanix cluster to the recovery cluster has stopped. New recovery points are not being created, and the DR dashboard shows replication errors. Investigation reveals:

    The primary and recovery clusters are both online and healthy.

    Network segmentation was recently enabled to isolate replication traffic from other workloads.

    No recent changes were made to firewall rules, protection policies or RPO settings.

Which action should the administrator take first to investigate the replication failure?

Options:

A.  

Delete and recreate the protection policy to reset replication.

B.  

Increase the RPO interval setting in order to reduce the replication load.

C.  

Verify required ports are open and reachable between clusters.

D.  

Perform a test failover at the recovery site.

Discussion 0
Questions 31

An administrator intends to configure a NearSync replication schedule with a 15-minute Recovery Point Objective (RPO) on a hybrid 3-node cluster. The current nodes in the cluster are configured with one SSD and four HDDs each. Which cost-effective modification is required to support this specific replication schedule?

Options:

A.  

Replace the HDDs with NVMe drives to support the IOPS requirement.

B.  

Configure the cluster with a minimum of four nodes.

C.  

Increase the Controller VM (CVM) memory to 64 GB.

D.  

Add a second SSD to each node to meet the minimum requirement.

Discussion 0
Questions 32

An administrator needs to provide leadership with a report showing the timeframe of each step during Recovery Plan failover testing. How should the administrator produce this report?

Options:

A.  

Filter the Events log in Prism Central for Recovery Plan activity.

B.  

Review the built-in execution report from the test failover results.

C.  

Generate a custom report within Prism Central Intelligent Operations.

D.  

Use ncli on a CVM to query Recovery Plan execution history.

Discussion 0