Pre-Summer Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

ExamsBrite Dumps

Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Question and Answers

Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert

Last Update May 31, 2026
Total Questions : 232

We are offering FREE MB-335 Microsoft exam questions. All you do is to just go and sign up. Give your details, prepare MB-335 free exam questions and then go for complete pool of Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert test questions that will help you more.

MB-335 pdf

MB-335 PDF

$40.25  $114.99
MB-335 Engine

MB-335 Testing Engine

$47.25  $134.99
MB-335 PDF + Engine

MB-335 PDF + Testing Engine

$61.25  $174.99
Questions 1

You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.

The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.

You need to post a picking list that accounts for the material required to produce 105 finished goods.

What should you do?

Options:

A.  

Report as finished five additional units in the error quantity field.

B.  

When creating the lines for a picking list, set the value of the quantity option to 105.

C.  

Post a picking list for 100 to account for the originally estimated amount. Post an additional picking list to account for the equivalent amount of material to produce 5 finished goods.

D.  

In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.

Discussion 0
Questions 2

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 3

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 4

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Service subscription

B.  

Counter-based maintenance plan lines

C.  

Maintenance plan lines for the location

D.  

Service type item

E.  

Time-based maintenance plan lines

Discussion 0
Questions 5

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 6

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 7

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set the operation route type as Standard.

B.  

Set the input warehouse on the resource to the vendor warehouse.

C.  

Set the operation route type as Vendor.

D.  

Set all BOM lines warehouse to the production warehouse.

E.  

Set all the BOM lines to resource consumption.

Discussion 0
Questions 8

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 9

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Discussion 0
Questions 10

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

Options:

A.  

Implies[Trim==Legend,Seat==ML]

B.  

Seat!=ML

C.  

[Trim==Legend|Seat==ML]

D.  

Implies[Seat==ML,Trim==Legend]

Discussion 0
Questions 11

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set up configuration and weight for partial visibility.

B.  

Create a product master with predefined variants for ounces and boxes.

C.  

Set up configuration and weight for full visibility.

D.  

Create a catch weight item.

Discussion 0
Questions 12

You need to configure the system to track the cost and delivery performance of VendorZ.

Which two actions should you perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Add an activity to the production route for deliveries.

B.  

Create a service product and set Stocked product - Yes.

C.  

Add an activity to the production flow for deliveries.

D.  

Create a service product and set Stocked product = No.

Discussion 0
Questions 13

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 14

You need to set up the state control for sales of motorcycles.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE : Each correct selection is worth one point.

Options:

A.  

Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

B.  

Create an inclusive restricted product list for United States and add the motorcycle part to the list.

C.  

Create an exclusive restricted product list for California and add the motorcycle part to the list.

D.  

Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Discussion 0
Questions 15

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 16

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 17

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

unmachined plastic pieces

B.  

mold tooling

C.  

machined plastic pieces

D.  

excess plastic

Discussion 0
Questions 18

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Best before period in days

B.  

Best advice period in days

C.  

Backward tracing

D.  

Forward tracing

E.  

Shelf life period in days

Discussion 0
Questions 19

You need to resolve the issue for UserF.

What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 20

You need to determine the batch values on the combined mix batches for OperatorA.

Which values should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 21

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 22

A company produces homeopathic lotions (or pain relief and uses Dynamics 365 Supply Chain Management.

Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.

You need to ensure the company can provide the appropriate reporting and tracking for these components.

Which parameters should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 23

A client uses Dynamics 365 Supply Chain Management. The client is implementing production control.

You need to verity production quantities and costs at the end of each month.

Which production order status values should you search for? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 24

A company is implementing Dynamics 365 Supply Chain Management in then manufacturing environment. The manufacturing process uses formulas to direct material consumption on the batch orders.

During production some items in the formula must be consumed automatically from the production area, while some must be picked with their actual consumption reported on a pick list.

You need to determine which setup method is used for formula lines to allow for the desired mixed method picking processes.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Leave the flushing principle blank on formula lines and set the default start value to Always for Automatic Bill of Material Consumption.

B.  

Set the flushing principle on each formula line based on consumption method for the line.

C.  

Leave the flushing principle blank on formula lines and set default flushing principle on the items based on consumption method for the item.

D.  

Leave the flushing principle blank on formula lines and set resource consumption to direct flushing principle of materials based on consumption method for the line.

Discussion 0
Questions 25

A manufacturer is implementing Dynamics 365 Supply Chain Management with warehouse management processes (WMS).

Warehouse workers use hand-held devices to pick and stage batch-tracked products for production. The warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production.

You need to remove the products from on-hand inventory.

What should you configure?

Options:

A.  

mobile device menu item, start production order

B.  

flushing principle, available at location

C.  

flushing principle, start

D.  

manufacturing execution, job card device

Discussion 0
Questions 26

A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.

The company requires that employees register time against each machine on the shop floor.

You need to configure the system so that employees can register time.

Which two configurations must be set up? Each answer represents a partial solution

NOTE Each correct selection is worth one point.

Options:

A.  

machines as a resource

B.  

time registration workers

C.  

electronic timecard parameter

D.  

registration workflow

Discussion 0
Questions 27

A company manufactures high-end speaker systems. You have different configurations available for customers to customize features, including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.

A customer can optionally add on protective covers, but only if a metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:

You need to create an expression-based constraint that will only allow Corner Protection if Metal is selected. How should you complete the expression? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 28

A company plans an implementation of Dynamics 365 Supply Chain Management.

The warehouse manager requires that if an item is picked for production from a bin location that has only a few items left, the picker must pick all remaining items from the location. You need to configure picking to meet the warehouse manager ' s requirement. Which prerequisite should you configure?

Options:

A.  

Warehouse-enabled products

B.  

Cycle counting threshold

C.  

Location directives

Discussion 0
Questions 29

You need to calculate estimated consumption of ingredients for liquid cleaning solution.

What is the consumption? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 30

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 31

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Require an electronic signature when the formula is approved.

B.  

Select Block editing and approve the formula.

C.  

Select the Block removal of approval option for the formula

D.  

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Discussion 0
Questions 32

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.  

Use a purchase agreement as a service agreement.

C.  

Allocate subcontracted work in its own cost breakdown block.

D.  

Configure a costing resource and requirement to point to a Vendor type resource.

E.  

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Discussion 0
Questions 33

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 34

A company uses Dynamics 365 Supply Chain Management to manage master planning and optimize production planning processes.

The company plans to enable Planning Optimization to improve master planning outcomes and automate planning calculations efficiently.

You need to configure the system to install and activate the Planning Optimization Add-in.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Options:

Discussion 0
Questions 35

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 36

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Schedule production based on the availability of raw material.

B.  

Split and plan operations in detail for each of the resources.

C.  

Schedule productions based on the capacity of the resources.

D.  

Run master planning with a specific time fence.

E.  

Plan scheduling of the production at the resource group level.

Discussion 0
Questions 37

You need to configure lot number control for inventory. Which option should you use?

Options:

A.  

Physical inventory

B.  

Blank receipt allowed

C.  

Blank issue allowed

D.  

Primary socking

Discussion 0
Questions 38

You need to configure costing for raw materials used to manufacture unscented cleaning solution.

Which form should you use?

Options:

A.  

Cost basis type

B.  

Quantity and margin template

C.  

Pricing calculation

D.  

Pricing template

Discussion 0
Questions 39

You need to configure the controller ' s ModelB asset requirements for the off-season.

What should you do?

Options:

A.  

Use the default functional location

B.  

Create a functional location.

C.  

Create a location profile.

D.  

Create a location type.

Discussion 0
Questions 40

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 41

You need to configure the production requirements of the controller.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 42

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Assign new engineering version for parent BOM.

B.  

Enable active for planning for lifecycle status.

C.  

Assign lifecycle state for parent BOM.

D.  

Disable active for planning for lifecycle status.

E.  

Assign lifecycle state for subassembly.

Discussion 0
Questions 43

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Ignore scheduled execution

B.  

Asset

C.  

Tool

D.  

Worker

E.  

Ignore schedule

Discussion 0
Questions 44

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 45

You need to configure the warehouse manager ' s ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 46

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 47

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 48

You need to create the production orders for standard model bicycles.

Which method should you use?

Options:

A.  

Sales order line

B.  

Master planning execution

C.  

Supply schedule form

D.  

Released item

E.  

All production orders form

Discussion 0
Questions 49

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Route card journal

B.  

Standard production order update

C.  

Handheld warehouse device

D.  

Job card journal

E.  

Report as finished journal

Discussion 0
Questions 50

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.  

Exclusive capacity set to yes and enter a Batch capacity.

B.  

Exclusive capacity set to no and infinite capacity.

C.  

Exclusive capacity set to yes and infinite capacity.

D.  

Exclusive capacity set to no and enter a Batch capacity.

Discussion 0
Questions 51

You need to create production orders for the new summer limited-edition bicycles.

How should they be created? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 52

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

Options:

A.  

Commerce channels

B.  

Operating units

C.  

Teams

D.  

Legal entities

E.  

Departments

Discussion 0
Questions 53

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Discussion 0
Questions 54

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.  

Run inventory close for the BOM items for the limited-edition bicycle.

B.  

Create the production order for the limited-edition bicycle and click estimate.

C.  

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.  

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Discussion 0
Questions 55

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 56

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 57

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.  

Release the engineering product version and then assign the route.

B.  

Connect the BOM to an engineering product version before release.

C.  

Connect a route to an engineering version before release.

D.  

Release the engineering product version and then assign BOM.

Discussion 0
Questions 58

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set product readiness to manual,

B.  

Copy link and products.

C.  

Define business impact.

D.  

Change product lifecycle state.

E.  

Set product readiness to automatic.

Discussion 0
Questions 59

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 60

You need to meet the requirements for User2.

What should you configure?

Options:

A.  

Process over/under transactions.

B.  

Create a transfer journal.

C.  

Cancel the product receipt.

D.  

Correct the product receipt.

E.  

Create a movement journal.

Discussion 0
Questions 61

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

Options:

A.  

Engineering attributes

B.  

Change management for process manufacturing

C.  

Engineering product variants

D.  

Engineering change management

E.  

Production floor execution management

Discussion 0