Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Question and Answers

Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert

Last Update Oct 1, 2025
Total Questions : 195

We are offering FREE MB-335 Microsoft exam questions. All you do is to just go and sign up. Give your details, prepare MB-335 free exam questions and then go for complete pool of Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert test questions that will help you more.

MB-335 pdf

MB-335 PDF

$46  $114.99
MB-335 Engine

MB-335 Testing Engine

$54  $134.99
MB-335 PDF + Engine

MB-335 PDF + Testing Engine

$70  $174.99
Questions 1

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 2

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 3

You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.

The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.

You need to post a picking list that accounts for the material required to produce 105 finished goods.

What should you do?

Options:

A.  

Report as finished five additional units in the error quantity field.

B.  

When creating the lines for a picking list, set the value of the quantity option to 105.

C.  

Post a picking list for 100 to account for the originally estimated amount. Post an additional picking list to account for the equivalent amount of material to produce 5 finished goods.

D.  

In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.

Discussion 0
Questions 4

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 5

You need to determine the batch values on the combined mix batches for OperatorA.

Which values should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 6

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Best before period in days

B.  

Best advice period in days

C.  

Backward tracing

D.  

Forward tracing

E.  

Shelf life period in days

Discussion 0
Questions 7

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set up configuration and weight for partial visibility.

B.  

Create a product master with predefined variants for ounces and boxes.

C.  

Set up configuration and weight for full visibility.

D.  

Create a catch weight item.

Discussion 0
Questions 8

You need to create the production orders for standard model bicycles.

Which method should you use?

Options:

A.  

Sales order line

B.  

Master planning execution

C.  

Supply schedule form

D.  

Released item

E.  

All production orders form

Discussion 0
Questions 9

You need to create production orders for the new summer limited-edition bicycles.

How should they be created? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 10

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 11

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 12

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Route card journal

B.  

Standard production order update

C.  

Handheld warehouse device

D.  

Job card journal

E.  

Report as finished journal

Discussion 0
Questions 13

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.  

Exclusive capacity set to yes and enter a Batch capacity.

B.  

Exclusive capacity set to no and infinite capacity.

C.  

Exclusive capacity set to yes and infinite capacity.

D.  

Exclusive capacity set to no and enter a Batch capacity.

Discussion 0
Questions 14

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

Options:

A.  

Commerce channels

B.  

Operating units

C.  

Teams

D.  

Legal entities

E.  

Departments

Discussion 0
Questions 15

You need to configure the system to track the cost and delivery performance of VendorZ.

Which two actions should you perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Add an activity to the production route for deliveries.

B.  

Create a service product and set Stocked product - Yes.

C.  

Add an activity to the production flow for deliveries.

D.  

Create a service product and set Stocked product = No.

Discussion 0
Questions 16

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.  

Release the engineering product version and then assign the route.

B.  

Connect the BOM to an engineering product version before release.

C.  

Connect a route to an engineering version before release.

D.  

Release the engineering product version and then assign BOM.

Discussion 0
Questions 17

You need to resolve the issue for UserF.

What should you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 18

You need to meet the requirements for User2.

What should you configure?

Options:

A.  

Process over/under transactions.

B.  

Create a transfer journal.

C.  

Cancel the product receipt.

D.  

Correct the product receipt.

E.  

Create a movement journal.

Discussion 0
Questions 19

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 20

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 21

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set product readiness to manual,

B.  

Copy link and products.

C.  

Define business impact.

D.  

Change product lifecycle state.

E.  

Set product readiness to automatic.

Discussion 0
Questions 22

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 23

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.  

Run inventory close for the BOM items for the limited-edition bicycle.

B.  

Create the production order for the limited-edition bicycle and click estimate.

C.  

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.  

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Discussion 0
Questions 24

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Discussion 0
Questions 25

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Ignore scheduled execution

B.  

Asset

C.  

Tool

D.  

Worker

E.  

Ignore schedule

Discussion 0
Questions 26

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Assign new engineering version for parent BOM.

B.  

Enable active for planning for lifecycle status.

C.  

Assign lifecycle state for parent BOM.

D.  

Disable active for planning for lifecycle status.

E.  

Assign lifecycle state for subassembly.

Discussion 0
Questions 27

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 28

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

Options:

A.  

Use the default functional location

B.  

Create a functional location.

C.  

Create a location profile.

D.  

Create a location type.

Discussion 0
Questions 29

You need to configure the production requirements of the controller.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 30

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 31

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 32

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

unmachined plastic pieces

B.  

mold tooling

C.  

machined plastic pieces

D.  

excess plastic

Discussion 0
Questions 33

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 34

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.  

Set the operation route type as Standard.

B.  

Set the input warehouse on the resource to the vendor warehouse.

C.  

Set the operation route type as Vendor.

D.  

Set all BOM lines warehouse to the production warehouse.

E.  

Set all the BOM lines to resource consumption.

Discussion 0
Questions 35

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Discussion 0
Questions 36

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Options:

A.  

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.  

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.  

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.  

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Discussion 0
Questions 37

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

Options:

A.  

Implies[Trim==Legend,Seat==ML]

B.  

Seat!=ML

C.  

[Trim==Legend|Seat==ML]

D.  

Implies[Seat==ML,Trim==Legend]

Discussion 0
Questions 38

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 39

You need to configure the production requirements for the QA team. What should you configure?

Options:

A.  

product readiness policies

B.  

quality order

C.  

quarantine order

D.  

inventory status

Discussion 0
Questions 40

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 41

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 42

A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.

The production planner increases the lead time of an item. On the next master planning output the planner receives a cancel action message on existing purchase orders. The message includes a suggested earlier date for the planned purchase orders.

The demand for the item has not changed since the original purchase order was placed. Dynamic negative days is not used.

You need to resolve the issue.

What should you do?

Options:

A.  

Increase positive days.

B.  

Decrease positive flays.

C.  

Decrease negative days to be less than the item lead time.

D.  

Increase negative days to be greater than the item lead time.

Discussion 0
Questions 43

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.

A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.

For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.

You need to create and configure the product and pricing for the new speaker.

Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.

Docs the solution meet the goal?

Options:

A.  

Yes

B.  

No

Discussion 0
Questions 44

A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.

The company has recently seen an increase in demand and purchases another resource that costs more to run. The company uses the same costs per resource. The company must be able to track cost contributions for the new resource.

You need to create a cost category for the new resource.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NOTE: More than one order of answer choices is correct You will receive credit for any of the correct orders you select.

Options:

Discussion 0
Questions 45

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.

The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. Ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.

You need to ensure that the system is set up to support the manufacturing process.

Solution: Create a dimension-based product with configurations. Use a price model to calculate the different configurable option costs.

Does the solution meet the goal?

Options:

A.  

Yes

B.  

No

Discussion 0
Questions 46

You are a manufacturer using Druitt 365 Supply Cham Management

A new series of orders is authorized for production.

You need to identify which documents to use for the released production order.

Which document should you use tor each requirement? to answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Questions 47

An electronics manufacturing company is transitioning from infinite capacity planning to finite capacity planning to improve scheduling efficiency and manage resource constraints effectively.

The company observes that its manufacturing process typically requires a minimum lead time of five days.

The company requires finite capacity scheduling to create realistic production schedules that account for resource limitations over a defined minimum lead time of five days.

You need to implement finite capacity planning with a time fence that aligns with the five-day manufacturing lead time.

Solution: Disable finite capacity planning for all resources.

Does the solution meet the goal?

Options:

A.  

Yes

B.  

No

Discussion 0
Questions 48

A recreational vehicle (RV) manufacturing company is implement Dynamics 365 Supply Chain Management. All RVs are configured to order.

Quality checks show that there is an issue with the sealant used with the windows in some of the RVs.

You need to identify which RV models use the sealant and change the sealant item.

Which function should you use for each requirement? To answer, drag the appropriate functions to the correct requirements. Each function may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0