What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?
What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?
An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended
Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?
Which system can significantly reduce or completely eliminate the amount of potable water used for irrigation?
Instituting a policy to prevent erosion and sedimentation and restore any eroding soils is a requirement of which credit or prerequisite?
When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?
A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be
submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning -
Analysis, Option 1. Existing Building Commissioning. At a minimum, what should be included in the Cx Plan?
What requirement must be met when creating a demand response program that satisfies Energy and
Atmosphere Credit, Demand Response?
Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?
Which of the following people are required to be listed on the LEED project registration page?
The compliant value of green cleaning products and materials is calculated using what factor?
Rainwater harvesting can be used for which of the following credits or prerequisites?
A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance: Existing Buildings.
What program requirements apply?
Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement
Plan?
A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?
The maximum number of points in the Innovation Category that can be achieved by exemplary performance is
How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water
Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?
What information is required when adding a new space within a facility to the ENERGY STAR® Portfolio Manager?
Which of the following prerequisites or credits has a minimum occupancy requirement?
What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?
Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the
Which of the following best meets requirements of Sustainable Sites Credit, Site Development - Protect or Restore Habitat?
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?
What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?
What credit rewards customers who change their normal consumption patterns in response to the varying price of
energy over time?
A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?
What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
Which of the following environmental concerns is exacerbated by impervious surfaces?
Which of the following is an allowable method to increase cooling tower cycles of concentration?
Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite Indoor Water Use Reduction?
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction
ensures that eligible newly installed plumbing fixtures will
The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of
Which of the following is a result of a low impact development rainwater management program?
What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?
The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?
A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?
A project is ineligible for an ENERGY STAR® Rating and will document Energy and Atmosphere Prerequisite,
Minimum Energy Performance by benchmarking against historical data. If the performance period calendar year is
2022, which of the following is an acceptable historical baseline?
In which of the following ways can a campus project using a Group Approach comply with Water Efficiency
Prerequisite, Building-Level Water Metering?
The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to
equal or be greater than 5%. Which strategy can the team implement to achieve this goal?
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
Which of the following is the most appropriate use of untreated stormwater?
Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?
A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?
A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they