Best practices recommend that the LEED AP confirm that minimum program requirements have been met
A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?
In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?
A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?
In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?
To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?
What is the maximum flow rate a public lavatory faucet may have if a project is pursuing prescriptive compliance for Water Efficiency Prerequisite?
A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?
A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.
Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?
A project team is pursuing certification for a performing arts center in an urban neighborhood. The project will earn one point from the Location and Transportation Credit, Surrounding Density and Diverse Uses. The project team is considering the Location and Transportation Credit for Reduced Parking Footprint. Which of the following needs to be included in the credit calculation?
A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?
A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)
The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following by-products on the documentation contribute toward the credit?
A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?
What primary role does the LEED AP have during the LEED certification process?
Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?
The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?
Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?
A project has access to two alternative water sources. How should they determine which source to use where?
A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?
For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?
What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?
A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be
completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most
appropriate one to use?
For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?
Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?