Labour Day Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Question and Answers

LEED AP Interior Design + Construction (LEED AP ID+C) V4

Last Update May 8, 2024
Total Questions : 100

We are offering FREE LEED-AP-ID+C USGBC exam questions. All you do is to just go and sign up. Give your details, prepare LEED-AP-ID+C free exam questions and then go for complete pool of LEED AP Interior Design + Construction (LEED AP ID+C) V4 test questions that will help you more.

LEED-AP-ID+C pdf

LEED-AP-ID+C PDF

$35  $99.99
LEED-AP-ID+C Engine

LEED-AP-ID+C Testing Engine

$42  $119.99
LEED-AP-ID+C PDF + Engine

LEED-AP-ID+C PDF + Testing Engine

$56  $159.99
Questions 1

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.  

as part of the discovery phase

B.  

as part of the final certification submittal

C.  

after the design phase but before construction

D.  

after the Commissioning (Cx) review but before design phase submittal

Discussion 0
Questions 2

A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

Options:

A.  

Composting toilet

B.  

Low-flow irrigation system

C.  

Commercial clothes washer

D.  

Roof runoff for chiller make-up water

Discussion 0
Questions 3

In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?

Options:

A.  

Switching from municipally supplied potable water to potable well water on-site

B.  

Reducing irrigation needs by planting native species and drought-tolerant species

C.  

Reducing potable water supply by limiting occupant access to drinking fountains and public restrooms

D.  

Reducing process water demand by assessing kitchen and laundry equipment selection and operational. schedules

Discussion 0
Questions 4

A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?

Options:

A.  

A bicycle maintenance program for employees

B.  

At least one on-site shower and changing facility for employees

C.  

Seven short-term bicycle storage spaces within 50 ft. (15 m) of the project's main entrance

D.  

Six long-term bicycle parking spaces within 50 ft. (15 m) of the project's main entrance

Discussion 0
Questions 5

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

Options:

A.  

Waste stream, total waste, diverted waste, waste to landfill

B.  

Waste volume, commingled waste, wood for energy, reused items

C.  

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.  

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

Discussion 0
Questions 6

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.  

Up to three layers of a floor assembly

B.  

Items that are demolished and not replaced

C.  

The interior side of exterior windows and doors

D.  

Hazardous materials that are remediated as part of the project

Discussion 0
Questions 7

What is the maximum flow rate a public lavatory faucet may have if a project is pursuing prescriptive compliance for Water Efficiency Prerequisite?

Options:

A.  

0.25 gpm (0.9 lpm)

B.  

0.4 gpm (1.5 lpm)

C.  

0.8 gpm (3.0 lpm)

D.  

1.0 gpm (3.8 lpm)

Discussion 0
Questions 8

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

Options:

A.  

10%

B.  

15%

C.  

20%

D.  

25%

Discussion 0
Questions 9

Which standard reference can be used to find minimum ventilation rates?

Options:

A.  

ASHRAE 55-2010

B.  

ASHRAE 90.1-2010

C.  

SCAQMD Rule 1168

D.  

ASHRAE 62.1-2010

Discussion 0
Questions 10

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

Options:

A.  

Water-Related Systems

B.  

Energy-Related Systems

C.  

Indoor Air Quality Systems

D.  

Waste Management Systems

Discussion 0
Questions 11

A project team is pursuing certification for a performing arts center in an urban neighborhood. The project will earn one point from the Location and Transportation Credit, Surrounding Density and Diverse Uses. The project team is considering the Location and Transportation Credit for Reduced Parking Footprint. Which of the following needs to be included in the credit calculation?

Options:

A.  

The project is located in an area without a code minimum and cannot meet this credit

B.  

A 20% reduction in the number of parking spaces from the calculated base ratio of the performing arts center

C.  

Existing on-street parking spaces in the public right-of-way along the street in front of the project's main entrance

D.  

Existing parking spaces in a privately-owned parking deck being leased to the project staff that are 1/8 mi.

(0.40 km) away

Discussion 0
Questions 12

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.  

Compliance Path 1: Prescriptive Achievement; product cutsheets

B.  

Compliance Path 2: Usage-Based Calculation; indoor water use calculations

C.  

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.  

Compliance Path 2. Usage-Based Calculation; prescriptive compliance confirmation

Discussion 0
Questions 13

A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)

Options:

A.  

Location and Transportation Credit, Access to Quality Transit

B.  

Energy and Atmosphere Credit, Green Power and Carbon Offsets

C.  

Indoor Environmental Quality Credit, Indoor Air Quality Assessment

D.  

Energy and Atmosphere Credit, Advance Energy Metering

Discussion 0
Questions 14

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following by-products on the documentation contribute toward the credit?

Options:

A.  

Excavated soil

B.  

Wood derived fuel

C.  

Items sent to the local incinerator

D.  

Fine waste used as Alternate Daily Cover

Discussion 0
Questions 15

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.  

Include only the newly installed fixtures and exclude the existing fixtures

B.  

Include only the existing fixtures and exclude the newly installed fixtures

C.  

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.  

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Discussion 0
Questions 16

What primary role does the LEED AP have during the LEED certification process?

Options:

A.  

Runs weekly construction meetings

B.  

Authors the Owner's Project Requirements (OPR) document

C.  

Determines the LEED certification status of the project

D.  

Helps project team members understand the rating system

Discussion 0
Questions 17

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

Options:

A.  

Taxes and delivery costs

B.  

Taxes and installation costs

C.  

Installation equipment and labor

D.  

Transportation costs and installation labor

Discussion 0
Questions 18

The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?

Options:

A.  

Increase the rainwater infiltration capacity

B.  

Decrease the amount of bicycle parking that must be provided

C.  

Increase the overall SR (solar reflectance) of the hardscape area

D.  

Decrease the required amount of on-street parking that must be provided

Discussion 0
Questions 19

Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?

Options:

A.  

Only the design team members

B.  

Owner, designer, and contractor

C.  

All principal project team members

D.  

Project team members with LEED® Credentials

Discussion 0
Questions 20

A project has access to two alternative water sources. How should they determine which source to use where?

Options:

A.  

A project may not use two alternative water sources

B.  

Target the uses that require the least treatment first, such as toilet flushing or irrigation

C.  

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.  

All sources should be treated to potable water standards and used to supplement the municipal supply

Discussion 0
Questions 21

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.  

Indoor Environmental Quality Credit, Daylight

B.  

Energy and Atmosphere Credit, Renewable Energy Production

C.  

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.  

Materials and Resources Credit, Interiors life-cycle impact reduction

Discussion 0
Questions 22

Which of the following can be considered pre-consumer recycled content?

Options:

A.  

Aluminum cans used to make sheet metal

B.  

Plastic bottles that are used to create upholstery fabric

C.  

Sawdust from a lumber mill used to make composite board

D.  

Glass manufacturing scraps (culls) that are used to create new glass

Discussion 0
Questions 23

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.  

documenting LEED credits

B.  

creating the Basis of Design

C.  

developing the LEED Scorecard

D.  

implementing the Commissioning Plan

Discussion 0
Questions 24

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

Options:

A.  

Health club, Laundromat, Post office, Restaurant

B.  

Hair salon, Movie Theater, Pharmacy, Restaurant

C.  

Clothing store, Commercial office, Eye doctor, Supermarket

D.  

Convenience store, Furniture store, Hardware store, Pharmacy

Discussion 0
Questions 25

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

Options:

A.  

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Discussion 0
Questions 26

What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.  

Demolition waste

B.  

Plumbing fixtures

C.  

Salvaged furniture

D.  

Existing building conditions

Discussion 0
Questions 27

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

Options:

A.  

LEED Interior Design and Construction

B.  

LEED Building Design and Construction

C.  

LEED for Homes

D.  

No rating system

Discussion 0
Questions 28

For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?

Options:

A.  

Copy rooms

B.  

Break rooms

C.  

Conference rooms

D.  

Office building lobbies

Discussion 0
Questions 29

Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.  

75% Rainforest Alliance Certified flooring with a total cost of $3,000 USD

B.  

10% Rainforest Alliance Certified furniture with a total cost of $30,000 USD

C.  

50% Rainforest Alliance Certified wood veneer with a total cost of $5,000 USD

D.  

100% Rainforest Alliance Certified wheatboard with a total cost of $2,000 USD

Discussion 0
Questions 30

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

Options:

A.  

Thermal comfort ranges, plug and process load needs

B.  

Programmatic and operational parameters, and building schedule

C.  

Transportation, building features, lighting levels and building envelope attributes

D.  

Occupant's well-being, building site attributes, transportation and building features

Discussion 0