Pre-Winter Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: agile70

ExamsBrite Dumps

LEED AP Building Design + Construction (LEED v5 AP BD+C) Question and Answers

LEED AP Building Design + Construction (LEED v5 AP BD+C)

Last Update Oct 12, 2026
Total Questions : 454

We are offering FREE LEED-AP-BD+C USGBC exam questions. All you do is to just go and sign up. Give your details, prepare LEED-AP-BD+C free exam questions and then go for complete pool of LEED AP Building Design + Construction (LEED v5 AP BD+C) test questions that will help you more.

LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$31.5  $104.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$37.5  $124.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$49.5  $164.99
Questions 1

To ensure long-term energy efficiency and grid resilience, which strategy should the project team prioritise first?

Options:

A.  

Provide a high-performance building envelope

B.  

Enrol in a demand-response programme with the local utility

C.  

Purchase 100% Renewable Energy Certificates to offset projected electricity use

Discussion 0
Questions 2

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.  

Toilets, urinals, pre-rinse spray valves

B.  

Toilets, private lavatory faucets, dishwashers

C.  

Urinals, public lavatory faucets, kitchen sink faucets

D.  

Urinals, showerheads, commercial kitchen filling operations faucets

Discussion 0
Questions 3

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

Options:

A.  

Locate the project¼ mile (0.4 km) walking distancefrom two campus bus system lines (only accessible to campus students) with two stops each

B.  

Locate the project½ mile (0.8 km) walking distancefrom two bus lines with two stops each

C.  

Locate the project¼ mile (0.4 km) walking distancefrom a planned, funded, and partially complete subway station

D.  

Locate the project½ mile (0.8 km) walking distancefrom a planned, not funded commuter rail

Discussion 0
Questions 4

Minimizing light trespass is a key component of which of the following credits?

Options:

A.  

EQc2: Occupant Experience, Option 5: Lighting Environment

B.  

SSc6: Light Pollution Reduction

C.  

EAc3: Enhanced Energy Efficiency

Discussion 0
Questions 5

The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is

Options:

A.  

gate-to-gate

B.  

cradle-to-gate

C.  

cradle-to-grave

D.  

cradle-to-cradle

Discussion 0
Questions 6

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

Options:

A.  

LTc3: Compact and Connected Development

B.  

EAc1: Electrification

C.  

WEc2: Enhanced Water Efficiency

Discussion 0
Questions 7

The project team is working to reduce the building ' s total energy costs in a cold climate. Which is the best strategy for the project team to consider?

Options:

A.  

Additional envelope insulation

B.  

Window shades

C.  

Highly reflective roof

D.  

Increased cooling efficiency

Discussion 0
Questions 8

Which of the following workforce development training types contributes to earning points under LTc2: Equitable Development, Option 3: Equitable Construction?

Options:

A.  

Financial literacy courses provided on-site by a recognized organization or government entity

B.  

Safety training workshops conducted monthly for all construction personnel

C.  

Wellness programs offered by a recognized organization to workers on-site

Discussion 0
Questions 9

A contractor wants to use an adhesive that exceeds the allowed Volatile Organic Compound (VOC) content limit under Indoor Environmental Quality Credit, Low Emitting Materials. This credit can be earned if

Options:

A.  

the VOC budget method is applied for VOC content

B.  

the adhesive is not included in the LEED documentation

C.  

75% of the adhesives used comply with the VOC content limit and emissions requirements

D.  

95% of the adhesives used comply with the VOC content limit and emissions requirements

Discussion 0
Questions 10

According to the Integrative Process Credit, Integrative Process, the goal-setting workshop should identify

Options:

A.  

potential project sites

B.  

targeted LEED credits

C.  

expected water demand

D.  

expected energy demand

Discussion 0
Questions 11

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

Options:

A.  

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.  

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.  

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.  

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Discussion 0
Questions 12

A contractor is building a retirement community project. 30% of the building ' s product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

Options:

A.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.  

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Discussion 0
Questions 13

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?

Options:

A.  

20%

B.  

25%

C.  

30%

Discussion 0
Questions 14

Which strategy can maximize the efficiency of water use in an irrigation system?

Options:

A.  

Determine a set rate of irrigation and avoid adjustments

B.  

Set the irrigation controllers on a timer

C.  

Incorporate precipitation sensors with smart irrigation controllers

D.  

Space irrigation sprinkler heads for overlapping coverage

Discussion 0
Questions 15

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

Options:

A.  

included in the calculation

B.  

excluded from the calculation

C.  

excluded if the total volume is less than 25% of the building being reused

D.  

excluded if the total volume is more than 25% of the building being reused

Discussion 0
Questions 16

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.  

Owner

B.  

Contractor

C.  

Occupants

D.  

Facility manager

Discussion 0
Questions 17

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Options:

A.  

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.  

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.  

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.  

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Discussion 0
Questions 18

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Options:

A.  

A project may not use two alternative water sources

B.  

Target the uses that require the least treatment first

C.  

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.  

All alternative water sources should be treated to potable water standards

Discussion 0
Questions 19

Within the Indoor Environmental Quality credit category, which of the following design strategies can be used to enhance building resilience to extreme temperatures?

Options:

A.  

External shading devices

B.  

Tinted skylights

C.  

High-performance glazing

Discussion 0
Questions 20

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

Options:

A.  

Material reuse

B.  

Bio-based elements

C.  

Extended producer responsibility

D.  

Forest Stewardship Council (FSC) wood products

Discussion 0
Questions 21

Which of the following are all considered regular building occupants?

Options:

A.  

Staff, primary/secondary students, volunteers, and residents

B.  

Staff, primary/secondary students, higher education students, and residents

C.  

Higher education students, retail customers, periodic volunteers, and visitors

D.  

Residents, volunteers, retail customers, and staff

Discussion 0
Questions 22

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Options:

A.  

Discounted rail pass availability

B.  

Rail line station construction completion date

C.  

Connections to transfer routes

D.  

Passenger capacity

Discussion 0
Questions 23

The Chartered Institute of Building Services Engineers (CIBSE) Applications Manual 10 - 2005 provides guidance for which of the following?

Options:

A.  

Replacing inefficient lighting fixtures

B.  

Adopting natural ventilation as the sole servicing strategy

C.  

Phasing out of equipment that uses CFC-based refrigerants

D.  

Renovating with materials low in volatile organic compounds

Discussion 0
Questions 24

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

Options:

A.  

Neighbors can plan for future construction

B.  

It will help streamline the permitting process

C.  

Potential partnerships with the community can be revealed

D.  

The owner can determine financial strategies based on the public ' s input

Discussion 0
Questions 25

Which of the following is an example of nonpotable water that can be effectively used for landscape irrigation to improve water efficiency?

Options:

A.  

Well water from a private borehole

B.  

Dechlorinated swimming-pool water

C.  

Street runoff taken directly from storm drains

Discussion 0
Questions 26

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

Options:

A.  

Data closet

B.  

Conference room

C.  

Chemical storage

D.  

Open office

Discussion 0
Questions 27

How can a facility manager promote both energy efficiency and thermal comfort in a building?

Options:

A.  

Survey occupants about their comfort on a regular basis

B.  

Avoid overcooling during warmer seasons

C.  

Provide a constant temperature setpoint for the year

D.  

Ask the cleaning contractor to turn off all of the lights after cleaning

Discussion 0
Questions 28

In order to achieve the requirements of LEED, the Electrical Vehicle Supply Equipment (EVSE) must comply with:

Options:

A.  

State, but not regional standards established for electrical vehicles operated within the state of vehicle operation

B.  

Regional, state, or local standards for the electrical connectors to be used

C.  

Level 1 charging capacity (110 volts AC)

D.  

Manufacturer ' s standards established for electrical vehicles operated within the state of vehicle primary operation

Discussion 0
Questions 29

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.  

Develop the building energy model

B.  

Optimize the green strategies across all aspects

C.  

Calculate the life cycle cost of the building

D.  

Choose an appropriate Commissioning Authority (CxA)

Discussion 0
Questions 30

Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

Options:

A.  

Burning fossil fuels

B.  

Smoking tobacco products

C.  

Preparing non-organic foods

D.  

Manufacturing toxic chemicals

Discussion 0
Questions 31

In the context of Core and Shell projects, which of the following strategies effectively aligns tenant spaces with LEED goals for sustainability?

Options:

A.  

Mandating quarterly indoor air quality assessments for tenant areas

B.  

Implementing a shared lighting control system throughout the entire building

C.  

Developing comprehensive tenant guidelines outlining sustainable practices

Discussion 0
Questions 32

Which of the following strategies enhances energy resilience by ensuring that critical loads are powered during a grid outage?

Options:

A.  

Increase insulation in the building envelope

B.  

Install a battery energy-storage system

C.  

Implement energy-efficient lighting

Discussion 0
Questions 33

Minimizing light trespass is a key component of which of the following credits?

Options:

A.  

Energy and Atmosphere Credit, Optimize Energy Performance

B.  

Energy and Atmosphere Prerequisite, Minimum Energy Performance

C.  

Sustainable Sites Credit, Light Pollution Reduction

D.  

Indoor Environmental Quality Credit, Interior Lighting

Discussion 0
Questions 34

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

Options:

A.  

Identify all end uses within the project scope, including fixtures and fittings

B.  

Prioritise alternative water sources to offset overall water demand

C.  

Require equipment specifications to align with the contract documents

Discussion 0
Questions 35

A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?

Options:

A.  

Large maple trees for shading

B.  

Xeriscaping landscape beds

C.  

Turf grass area for picnic benches

D.  

Tropical flowers next to park benches

Discussion 0
Questions 36

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

Options:

A.  

all luminaires have full cutoff fixtures

B.  

all luminaires have a minimum color temperature of 3500 K

C.  

all luminaires meet acceptable fixture ratings for the project ' s Model Lighting Ordnance (MLO) lighting zone

D.  

all luminaires are mounted at least three mounting heights from the lighting boundary

Discussion 0
Questions 37

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

Options:

A.  

Document commissioning authority experience for at least one building project

B.  

Review the owner ' s project requirements (OPR) for project goals and expectations

C.  

Be a part of the project ' s design and construction management team

D.  

Report results, findings, and recommendations directly to the architect

Discussion 0
Questions 38

Every location in the U.S. identifies how many regional credits?

Options:

A.  

Four

B.  

Five

C.  

Six

D.  

Seven

Discussion 0
Questions 39

What is the average flush rate for a dual flush toilet with a high flush rate of 1.6 gpf (6 lpf) and a low flush rate of 1.05 gpf (4 lpf)?

Options:

A.  

1.05 gpf (4 lpf)

B.  

1.19 gpf (4.5 lpf)

C.  

1.23 gpf (4.66 lpf)

D.  

1.32 gpf (5 lpf)

Discussion 0
Questions 40

A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

Options:

A.  

The selection of energy-efficient LED fixtures for all of the building ' s lighting

B.  

The installation of an air-purifying facade material on the front entrance of the building

C.  

The integration of rainwater management strategies to achieve a Regional Priority Credit

D.  

The implementation of a comprehensive metering strategy to measure three individual energy end uses

Discussion 0
Questions 41

Which of the following strategies supports energy resilience by enhancing the grid interactivity of a building?

Options:

A.  

Install smart meters to provide real-time data on energy consumption

B.  

Install energy-storage systems that can deploy energy during peak-demand periods

C.  

Use occupancy sensors to turn lights on and off automatically

Discussion 0
Questions 42

Short-term bicycle storage in Location and Transportation Credit, Bicycle Facilities must be within 100 ft. (30 m) walking distance of any:

Options:

A.  

Bicycle network

B.  

Emergency access

C.  

Main entrance

D.  

Shower room

Discussion 0
Questions 43

A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?

Options:

A.  

A description of each use

B.  

The location of parking lots near each use

C.  

Walking routes from the project to each use

D.  

A calculation of the expected number of project occupants who will visit each use

Discussion 0
Questions 44

A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project ' s location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

Options:

A.  

Exemplary Performance is not available for Option 2

B.  

15 uses, including two uses in each of the five categories

C.  

15 uses, including at least one Food Retail and one Community Anchor use

D.  

18 uses, including uses in at least four of the five use type categories

Discussion 0
Questions 45

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

Options:

A.  

Building Design and Construction: Schools

B.  

Building Design and Construction: Healthcare

C.  

Building Design and Construction: Hospitality

D.  

Building Design and Construction: Data Centers

Discussion 0
Questions 46

What is the best strategy for a LEED AP to suggest in order to quantify the impact of increasing the window-to-wall ratio on a Building Design and Construction project?

Options:

A.  

Compare the current project to other similar projects

B.  

Monitor the HVAC loads throughout the life of the project

C.  

Perform a simple box energy model before the completion of the schematic phase

D.  

Review Green Business Certification Inc. (GBCI) ' s comments on the energy model submission

Discussion 0
Questions 47

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which option should the LEED AP recommend to best address these concerns?

Options:

A.  

Install a vegetative roofing system

B.  

Change the design to reduce the amount of roofing area

C.  

Change the roofing material to a dark material to eliminate the issue

D.  

Increase the parapet height

Discussion 0
Questions 48

EAp1: Operational Carbon Projection and Decarbonization Plan requires a 25-year forecast. What is the primary purpose of this forecast?

Options:

A.  

Prove that the building will be net-zero energy

B.  

Estimate utility-cost savings to secure project financing

C.  

Map future carbon emissions as the local electrical grid is projected to become cleaner

Discussion 0
Questions 49

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type could have limited exceptions from this requirement?

Options:

A.  

Warehouse projects

B.  

Residential projects

C.  

Healthcare projects

D.  

Office projects

Discussion 0
Questions 50

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

Options:

A.  

Select air-conditioner condensate for cooling

B.  

Calculate cycles of concentration

C.  

Identify the maximum number of cycles for the cooling tower or evaporative condenser

D.  

Engage a water treatment professional to perform a chemical analysis

Discussion 0
Questions 51

Which is a benefit of earning Regional Priority credits?

Options:

A.  

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project ' s location

B.  

The context of the project ' s location is not addressed, allowing the project team to focus on the building ' s priority issues

C.  

The project ' s operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.  

The LEED project is able to skip a review phase by considering the issues that are a priority in the project ' s location

Discussion 0
Questions 52

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

Options:

A.  

Historic district

B.  

Priority designation

C.  

Brownfield remediation

D.  

Diverse uses

Discussion 0
Questions 53

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

Options:

A.  

Heat gain will reduce the air conditioning load

B.  

Having the lights off reduces the electricity use

C.  

Reduction in lighting fixture use reduces re-lamping

D.  

There would be passive solar heating benefits to all of the classrooms

Discussion 0
Questions 54

Which of the following products are eligible for a WaterSense label?

Options:

A.  

Tankless toilets

B.  

Waterless urinals

C.  

Public lavatory faucets

D.  

Private lavatory faucets

Discussion 0
Questions 55

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

Options:

A.  

Excavated soil

B.  

Wood derived fuel

C.  

Items sent to the local incinerator

D.  

Alternate Daily Cover

Discussion 0
Questions 56

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

Options:

A.  

A mall with an indoor atrium, featuring a reflective roof

B.  

A parking lot that serves as the location for a monthly flea market

C.  

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.  

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Discussion 0
Questions 57

Qualifying spaces for the Sustainable Sites Credit, Places of Respite must

Options:

A.  

be located outdoors near a water feature

B.  

be located at least 20 ft. (6 m) from a smoking area

C.  

have provisions for direct medical care to be delivered in the area

D.  

have options for shade or indirect sun for a portion of seating spaces

Discussion 0
Questions 58

What requirements are needed to earn Regional Priority credits?

Options:

A.  

Full name and specialty credential of LEED AP

B.  

Points are awarded automatically

C.  

Exemplary performance

D.  

Related credits registration

Discussion 0
Questions 59

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.  

In each occupied space

B.  

In each densely occupied space

C.  

In each occupied space and outdoors

D.  

In each occupied space over 500 ft2 (46 m2)

Discussion 0
Questions 60

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.  

Site Assessment

B.  

Site Development - Protect or Restore Habitat

C.  

Heat Island Reduction

D.  

Light Pollution Reduction

Discussion 0
Questions 61

Which of the following cannot be classified as graywater?

Options:

A.  

Water from toilets

B.  

Water from showers

C.  

Water from kitchen sinks

D.  

Water from lavatory faucets

Discussion 0
Questions 62

What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location

and Transportation Credit, Access to Quality Transit?

Options:

A.  

Two points

B.  

Three points

C.  

Four points

D.  

Five points

Discussion 0
Questions 63

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

Options:

A.  

$10,000

B.  

$12,500

C.  

$22,500

D.  

$25,000

Discussion 0
Questions 64

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.  

Two Level (on, off)

B.  

Three Level (on, 25%, off)

C.  

Three Level (on, 50%, off)

D.  

Three Level (on, 75%, off)

Discussion 0
Questions 65

Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.  

A standard garbage disposal

B.  

Electronic submeter at the domestic water supply pipe to the building

C.  

An open-loop HVAC system that discharges potable cooling water to a nearby lake

D.  

Commercial dishwasher that is ENERGY STAR® labeled or performance equivalent

Discussion 0
Questions 66

For IPp2: Human Impact Assessment, the team wants to use the ground-floor spaces to achieve both social equity and occupant experience. Which design features would achieve this dual objective?

Options:

A.  

Designing public retail space as a café with seating in an adjacent plaza

B.  

Locating the building 0.25 mi. (0.40 km) from a subway stop and providing secure bicycle storage

C.  

Installing MERV-13 filters in all residential units and using low-VOC paint in the retail spaces

Discussion 0
Questions 67

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

Options:

A.  

Electrical, Mechanical, Plumbing, and Renewable Energy

B.  

Electrical, Structural, Mechanical, and Lighting

C.  

Electrical, Structural, Audio Visual, and Envelope

D.  

Electrical, Plumbing, Telecommunications, and Fire Suppression

Discussion 0
Questions 68

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.  

A reduction in at least two categories

B.  

A reduction below the industry average in at least three categories

C.  

A 5% reduction in all categories

D.  

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Discussion 0
Questions 69

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.  

Waste Management Plan

B.  

Building orientation on the site

C.  

Installation plan for perimeter control

D.  

Minimum standards for equipment exhaust

Discussion 0
Questions 70

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.  

Office

B.  

Hospital

C.  

Warehouse

D.  

Data Center

Discussion 0
Questions 71

What percentage of a building ' s surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

Options:

A.  

5%

B.  

10%

C.  

25%

D.  

50%

Discussion 0
Questions 72

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.  

Total fixture power

B.  

Site area of the project

C.  

Quantity of installed luminaires

D.  

Total fixture lumens below 90 degrees

Discussion 0
Questions 73

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

Options:

A.  

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.  

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.  

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.  

0.30 CFM/ft2 (1.5 (L/s)/m2)

Discussion 0
Questions 74

What nonroof measure contributes to the achievement of Sustainable Sites Credit, Heat Island Reduction, Option 1. Nonroof and Roof?

Options:

A.  

Use a high reflectance roof finish

B.  

Install artificial turf

C.  

Locate a minimum of 75% of parking spaces under cover

D.  

Provide shade with structures covered by energy generation systems

Discussion 0
Questions 75

Large commercial buildings are most often dominated by

Options:

A.  

internal loads

B.  

lighting loads

C.  

external loads

D.  

envelope loads

Discussion 0
Questions 76

Which of the following factors should be considered when selecting the most appropriate LEED rating system for a project using the LEED 40/60 rule?

Options:

A.  

Site location

B.  

Building type

C.  

Available materials and resources

Discussion 0
Questions 77

Which of the following is true regarding LEED Pilot Credits?

Options:

A.  

Pilot Credits are not specific to the rating systems

B.  

Pilot Credits can be attempted in the design review stage only

C.  

A registered Pilot Credit must be replaced on the LEED project ' s scorecard if that pilot credit is removed from the Pilot Credit Library

D.  

Pilot Credit feedback surveys must be completed

Discussion 0
Questions 78

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.  

site conditions

B.  

massing and orientation

C.  

plug and process load needs

D.  

building envelope performance

Discussion 0
Questions 79

Which of the following LEED credit data should be used for a comprehensive 25-year carbon-emissions projection for a new building project?

Options:

A.  

EAp5: Fundamental Refrigerant Management

B.  

WEp1: Water Metering and Reporting

C.  

MRc4: Building Product Selection and Procurement

Discussion 0
Questions 80

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team ' s top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.  

Take appropriate measures for the safe collection, storage and disposal of batteries

B.  

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.  

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.  

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Discussion 0
Questions 81

To achieve LEED points under MRc2 Reduce Embodied Carbon, Option 3: Track Carbon Emissions from Construction Activities, it requires:

Options:

A.  

On-site adherence to the AGC Playbook on Decarbonization and Carbon Reporting

B.  

Documenting type and amounts of all on-site usage of fuel and utilities

C.  

Creating a plan to achieve a reduction of on-site carbon emissions

Discussion 0
Questions 82

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

Options:

A.  

Three

B.  

Four

C.  

Five

D.  

Ten

Discussion 0
Questions 83

A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?

Options:

A.  

Building operating schedule and occupancy hours

B.  

Building operating schedule and total window area

C.  

Building envelope construction and occupancy hours

D.  

Total window area and building envelope construction

Discussion 0
Questions 84

A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?

Options:

A.  

The project cannot pursue LEED

B.  

The project may pursue Water Efficiency Credit, Indoor Water Use Reduction

C.  

The project does not meet Water Efficiency Prerequisite, Indoor Water Use Reduction, but can make up the points elsewhere in the rating system

D.  

The project can meet the Water Efficiency Prerequisite, Indoor Water Use Reduction, but cannot earn any points under Water Efficiency Credit, Indoor Water Use Reduction

Discussion 0
Questions 85

Which of the following could be considered diverted construction waste?

Options:

A.  

Excavated soil

B.  

Land-clearing debris

C.  

Alternative daily cover

D.  

Asphalt with aggregate

Discussion 0
Questions 86

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

Options:

A.  

Height and width of room

B.  

Noise reduction coefficient of the ceiling surface

C.  

Sound absorption coefficient of the floor surface

D.  

Operating sound level of nearest HVAC equipment

Discussion 0
Questions 87

A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

Options:

A.  

Change the orientation of the design case building

B.  

Optimize the slab depth of the design case building

C.  

Decrease the gross floor area of the baseline building

D.  

Increase the wall mass and types of windows in the baseline building

Discussion 0
Questions 88

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

Options:

A.  

Three years of free parking for green vehicles

B.  

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.  

A permanent discounted parking rate of at least 20% for all green vehicles

D.  

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Discussion 0
Questions 89

Which of the following products must always be included in Materials and Resources credits?

Options:

A.  

Faucets

B.  

Furniture

C.  

Interior Paint

D.  

Fire suppression system

Discussion 0
Questions 90

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Discussion 0
Questions 91

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction. New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

Options:

A.  

Historic Building Reuse

B.  

Building and Material Reuse

C.  

Whole-Building Life-Cycle Assessment

D.  

Renovation of Abandoned or Blighted Building

Discussion 0
Questions 92

What is the system boundary that a building life cycle analysis must be defined to account for?

Options:

A.  

Cradle-to-gate

B.  

Cradle-to-grave

C.  

Cradle-to-cradle

D.  

Cradle-to-building

Discussion 0
Questions 93

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.  

Custom design

B.  

Design-build

C.  

Material science

D.  

Prefabrication

Discussion 0
Questions 94

Which of the following documents detail the ideas, concepts, and criteria determined to be important to the success of a building?

Options:

A.  

Design review log

B.  

Basis of design

C.  

Integrated project delivery

D.  

Owner ' s project requirements

Discussion 0
Questions 95

A furniture manufacturer is designing a new line of office chairs and wants to ensure that the products align with circular-economy principles. Which of the following strategies should the manufacturer prioritize to align with the principles of material stewardship?

Options:

A.  

Use virgin materials for all chair components to ensure reliability

B.  

Implement a take-back program for end-of-life chairs

C.  

Source only locally available materials to reduce transportation impacts

Discussion 0
Questions 96

Location and Transportation Credit, Reduced Parking Footprint calculations must include

Options:

A.  

motorbike spaces

B.  

on-street parking in public rights-of-way

C.  

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.  

parking outside the project boundary but used by the project

Discussion 0
Questions 97

Which of the following documents contains the design team ' s interpretation of the Owner ' s Project Requirements?

Options:

A.  

Basis of Design (BOD)

B.  

Simple Box Energy Model Analysis

C.  

System ' s manual

D.  

Integrated Project Delivery report

Discussion 0
Questions 98

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.  

Duration of use

B.  

Building floor area

C.  

Make and model of fixtures

D.  

Proposed design fixture flow rates

Discussion 0
Questions 99

Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project ' s landscape water requirement be reduced by what percentage from the calculated baseline for the project site ' s peak watering month?

Options:

A.  

20%

B.  

25%

C.  

30%

D.  

40%

Discussion 0
Questions 100

Radiant-floor heating is proposed in a sensory zone to improve thermal variability in a new school. Which option in EQc3: Occupant Experience Performance will this design decision contribute to?

Options:

A.  

Adaptable environment

B.  

Solar glare

C.  

Outdoor connections

D.  

Resilient spaces

Discussion 0
Questions 101

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.  

Installing bioretention area

B.  

Installing on-site renewable power generation facility

C.  

Substituting impervious surface area with high-albedo paving materials

D.  

Increase artificial turf on the roof

Discussion 0
Questions 102

A new office-building project has implemented several water-saving strategies, achieving a 25% reduction in potable-water consumption through low-flow fixtures, efficient irrigation systems, and related measures. The project has also integrated a rainwater-harvesting system that contributes an additional 10% reduction in potable-water use.

The project team seeks to maximize its points under WEc2: Enhanced Water Efficiency by adopting the Whole-Project Water Use approach. How many total points can the project potentially earn for potable-water reduction, considering its use of alternative water sources?

Options:

A.  

3

B.  

2

C.  

4

Discussion 0
Questions 103

What percentage of all energy usage is attributable to buildings?

Options:

A.  

60%

B.  

30%

C.  

40%

D.  

50%

Discussion 0
Questions 104

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.  

At the main entrance, 10 ft. (3 m) from the door

B.  

At the main entrance, 25 ft. (7.5 m) from the door

C.  

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.  

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Discussion 0
Questions 105

Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?

Options:

A.  

Donate salvaged wood to a local nonprofit organisation that repurposes materials

B.  

Reuse salvaged metal beams in the construction of the new project

C.  

Sell recovered bricks to a salvage retailer for off-site reuse

Discussion 0
Questions 106

Where must a building ' s no-smoking signage be posted?

Options:

A.  

Within 10 ft. (3 m) of all building entrances

B.  

Within 10 ft. (3 m) of the main building entrance(s)

C.  

Within 25 ft. (8 m) of all building entrances

D.  

Within 25 ft. (8 m) of the main building entrance(s)

Discussion 0
Questions 107

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Options:

A.  

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.  

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.  

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.  

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Discussion 0
Questions 108

In what way can synergies between LEED credits enhance sustainability outcomes on a project?

Options:

A.  

Use low-emitting materials to optimise energy performance, contributing to Materials and Resources and Energy and Atmosphere credits

B.  

Install a green roof to reduce the heat-island effect and improve energy efficiency, contributing to Sustainable Sites and Energy and Atmosphere credits

C.  

Choose materials with high recycled content to improve thermal comfort, contributing to Materials and Resources and Indoor Environmental Quality credits

Discussion 0
Questions 109

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.  

At least 6 ft. (2 m) above the floor

B.  

At least 3 ft. (1 m) away from windows

C.  

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.  

On the ceiling 3 ft. (1 m) away from adjacent walls

Discussion 0
Questions 110

For minimum acoustic performance, peak-hour is defined as M

Options:

A.  

lowest noise level over a specified sample time

B.  

highest noise level over various periods of time

C.  

an energy-average of the noise level over a specified sample time

D.  

an energy-average of noise level divided by total sample time and area of the space

Discussion 0
Questions 111

What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.  

One in which the budget and timeline would benefit from simplified decision making and analysis during the project design

B.  

One in which the project team wants to explore the energy performance and load reduction effects of several envelope and lighting designs and mechanical systems

C.  

One in which the project team wants to achieve efficiency trade-offs between systems, offsetting the lower efficiency of one system by the improved efficiency of anotherOne in which the owner wants an estimate of the carbon reductions or lower operating costs (energy savings, demand charge savings) from energy strategies, beyond a simple calculation for individual energy conservation measures

Discussion 0
Questions 112

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.  

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse & Innovation Credit, Innovation, Exemplary Performance

B.  

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment ofProducts & Innovation Credit, Innovation, Exemplary Performance

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.  

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment ofProducts & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Discussion 0
Questions 113

Which of the following is a biofuel that is considered renewable energy under Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.  

Combustion of municipal solid waste

B.  

Non-mill residue forestry biomass waste

C.  

Wood coated with paints, plastics, or resins

D.  

Animal waste

Discussion 0
Questions 114

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.  

Planting density, soil conditions, irrigation efficiency and rainfall

B.  

Relative humidity, site exposure, plant species and planting density

C.  

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.  

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Discussion 0
Questions 115

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

Options:

A.  

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting

B.  

Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit, Site Assessment

C.  

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Minimum Indoor Environmental Quality Performance

D.  

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Discussion 0
Questions 116

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

Options:

A.  

Taxi stand

B.  

Ferry terminal

C.  

Local bus stop

D.  

Streetcar stop

Discussion 0
Questions 117

In order to achieve Indoor Environmental Quality Credit, Quality Views the project team increased the window-to-wall

ratio. Which prerequisite was impacted by this action?

Options:

A.  

Energy and Atmosphere Prerequisite, Minimum Energy Performance

B.  

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

C.  

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.  

Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification

Discussion 0
Questions 118

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

Options:

A.  

5%

B.  

3%

C.  

2%

D.  

8%

Discussion 0
Questions 119

What phase of the integrative process gives the team the greatest chance of success in meeting the project ' s environmental goals cost-effectively?

Options:

A.  

Design

B.  

Discovery

C.  

Operations

D.  

Construction

Discussion 0
Questions 120

Incorporating climate resilience in the integrative design process helps improve a project ' s sustainability outcomes by:

Options:

A.  

Reducing project construction costs

B.  

Integrating alternative energy systems more effectively

C.  

Identifying site-specific natural hazards early in the design phase

Discussion 0
Questions 121

Which item is included in the reuse calculation for MRc1: Building and Materials Reuse?

Options:

A.  

Roofing membranes

B.  

Asbestos insulation

C.  

Floor decking

D.  

Exterior glazing

Discussion 0
Questions 122

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Options:

A.  

PBT Source Reduction - Lead, Cadmium, and Copper

B.  

PBT Source Reduction - Mercury

C.  

Building Product Disclosure and Optimization - Environmental Product Declarations

D.  

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Discussion 0
Questions 123

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

Options:

A.  

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.  

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.  

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.  

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Discussion 0
Questions 124

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

Options:

A.  

10%

B.  

25%

C.  

50%

D.  

75%

Discussion 0
Questions 125

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.  

Innovation Credit, Innovation

B.  

Integrative Process Credit

C.  

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.  

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Discussion 0
Questions 126

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Use MERV 8 (F5), or higher, filters

B.  

Provide a hard-lid ceiling

C.  

Create positive pressure in the room

D.  

Provide a large opening to dilute air contaminates

Discussion 0
Questions 127

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

Options:

A.  

Install a preferred drop-off lane for buses meeting the emission requirements

B.  

Provide calculations showing that the average fleet bus meets the emission requirements

C.  

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.  

Document that all buses serving the project achieve a minimum green score of 30 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

Discussion 0
Questions 128

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

Options:

A.  

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.  

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.  

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.  

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Discussion 0
Questions 129

Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?

Options:

A.  

Double-glazed windows

B.  

Operable windows

C.  

High-performance insulation

Discussion 0
Questions 130

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

Options:

A.  

Preferred parking for green vehicles

B.  

A minimum of 75% of parking spaces under cover

C.  

Access to public transportation stops

D.  

A roof with artificial turf grass

Discussion 0
Questions 131

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Options:

A.  

Must include the athletic field and playground

B.  

May include the playground but must exclude the athletic field

C.  

Must include the playground but exclude the athletic field

D.  

May include or exclude the athletic field and the playground

Discussion 0
Questions 132

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

Options:

A.  

Airport flyover maps, mechanical plans, wall sections

B.  

Patient records, wall sections, ceiling panel cut sheets

C.  

Occupancy statistics, patient records, MRI machine specifications

D.  

MRI machine specifications, mechanical plans, occupancy statistics

Discussion 0