Summer Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

ExamsBrite Dumps

LEED AP Building Design + Construction (LEED AP BD+C) Question and Answers

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update Jul 26, 2026
Total Questions : 404

We are offering FREE LEED-AP-BD+C USGBC exam questions. All you do is to just go and sign up. Give your details, prepare LEED-AP-BD+C free exam questions and then go for complete pool of LEED AP Building Design + Construction (LEED AP BD+C) test questions that will help you more.

LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$36.75  $104.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$43.75  $124.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99
Questions 1

The Solar Reflectance Index (SRI) includes the measure of a material's

Options:

A.  

color (shade of gray)

B.  

ability to reflect solar radiation

C.  

ability to absorb solar radiation

D.  

ability to reflect thermal radiation

Discussion 0
Questions 2

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.  

Ground-source heat pumps

B.  

Tidal-based electrical production

C.  

Municipal solid waste combustion

D.  

Passive solar and daylighting strategies

Discussion 0
Questions 3

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

Options:

A.  

Building-level energy metering

B.  

Fundamental commissioning and verification

C.  

Minimum energy performance

D.  

Fundamental refrigerant management

Discussion 0
Questions 4

The project team is working to reduce the building's total energy costs in a cold climate. Which is the best strategy for the project team to consider?

Options:

A.  

Additional envelope insulation

B.  

Window shades

C.  

Highly reflective roof

D.  

Increased cooling efficiency

Discussion 0
Questions 5

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

Options:

A.  

6 months

B.  

12 months

C.  

24 months

D.  

36 months

Discussion 0
Questions 6

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.  

Survey occupants about their comfort on a regular basis

B.  

Provide occupants with individual space heaters in the winter

C.  

Ask the cleaning contractor to turn off all of the lights after cleaning

D.  

Institute a flexible dress code that permits seasonally appropriate clothing

Discussion 0
Questions 7

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

Options:

A.  

Preferred parking for green vehicles

B.  

A minimum of 75% of parking spaces under cover

C.  

Access to public transportation stops

D.  

A roof with artificial turf grass

Discussion 0
Questions 8

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

Options:

A.  

site conditions

B.  

massing and orientation

C.  

plug and process load needs

D.  

building envelope performance

Discussion 0
Questions 9

The owner of a 40,000 ft² (3,716 m²) site containing a one-story museum with a 10,000 ft² (929 m²) building footprint and 5,000 ft² (465 m²) of native vegetated landscaping purchases an adjacent 30,000 ft² (2,787 m²) concrete surface parking lot.

The owner plans to construct a 10,000 ft² (929 m²) museum addition and an adjacent exterior sculpture garden.

What is the minimum area of the sculpture garden that must be covered with native or adapted vegetated ground cover to achieve SSc1: Biodiverse Habitat?

Options:

A.  

3,000 ft² (278 m²)

B.  

14,000 ft² (1,300 m²)

C.  

12,000 ft² (1,115 m²)

D.  

10,000 ft² (929 m²)

Discussion 0
Questions 10

When planning a water-efficient landscape design, the designer should consider including

Options:

A.  

potable water

B.  

sprinkler system

C.  

native vegetation

D.  

permeable pavement

Discussion 0
Questions 11

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.  

Municipally supplied tap water

B.  

Ground surface stormwater runoff

C.  

Rainwater collected from the building roof

D.  

Graywater from the building's hand-washing sinks

Discussion 0
Questions 12

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

Options:

A.  

$10,000

B.  

$12,500

C.  

$22,500

D.  

$25,000

Discussion 0
Questions 13

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

Options:

A.  

Document commissioning authority experience for at least one building project

B.  

Review the owner's project requirements (OPR) for project goals and expectations

C.  

Be a part of the project's design and construction management team

D.  

Report results, findings, and recommendations directly to the architect

Discussion 0
Questions 14

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.  

Verify installation and performance of the commissioned systems

B.  

Review the building 10 months after substantial completion

C.  

Verify that training requirements are completed

D.  

Develop a systems manual for the commissioned systems

Discussion 0
Questions 15

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

Options:

A.  

Wall

B.  

Steel

C.  

Glass

D.  

Concrete

Discussion 0
Questions 16

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

Options:

A.  

A project may not use two alternative water sources

B.  

Target the uses that require the least treatment first

C.  

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.  

All alternative water sources should be treated to potable water standards

Discussion 0
Questions 17

For minimum acoustic performance, peak-hour is defined as M

Options:

A.  

lowest noise level over a specified sample time

B.  

highest noise level over various periods of time

C.  

an energy-average of the noise level over a specified sample time

D.  

an energy-average of noise level divided by total sample time and area of the space

Discussion 0
Questions 18

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

Options:

A.  

Training requirements

B.  

Allowable tolerance for facility operations

C.  

Facility, system and assembly performance assumptions

D.  

Environmental, energy efficiency and sustainability goals

Discussion 0
Questions 19

Which of the following management measures is used to minimize the spread of infection in indoor environments?

Options:

A.  

Promote natural ventilation in maintenance areas

B.  

Monitor and adjust indoor humidity levels only for occupant comfort

C.  

Implement regular air-filtration system inspections and maintenance

Discussion 0
Questions 20

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.  

Custom design

B.  

Design-build

C.  

Material science

D.  

Prefabrication

Discussion 0
Questions 21

The design team is attempting to achieve the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality in a conference room. The associated ASHRAE standard requires 400 CFM (11.3 CMM) of ventilation air, but the local code requires 500 CFM (14.1 CMM) of ventilation air. What is the required minimum amount of ventilation air to achieve this credit?

Options:

A.  

650 CFM (18.4 CMM)

B.  

500 CFM (14.1 CMM)

C.  

400 CFM (11.3 CMM)

D.  

520 CFM (14.7 CMM)

Discussion 0
Questions 22

IPp1: Climate Resilience Assessment identifies a high risk of extreme heat caused by the urban heat-island effect and flooding caused by an impervious site. Which combination identifies an appropriate strategy for heat and sea-level or flooding risks?

Options:

A.  

Heat: High-albedo white roof

Sea level: Emergency backup generators

B.  

Heat: High-efficiency variable refrigerant flow system

Sea level: Green roof

C.  

Heat: Exterior window shading and operable windows

Sea level: Sump pumps with backup power

Discussion 0
Questions 23

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

Options:

A.  

3%

B.  

1%

C.  

2%

D.  

4%

Discussion 0
Questions 24

A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Relocate the laundry facility to the basement

B.  

Naturally ventilate the laundry space per ASHRAE 62.1-2010

C.  

Install particle filters, with a MERV of 13 or higher or F7

D.  

Provide a ventilation system specifically for the laundry facility that has no recirculating air

Discussion 0
Questions 25

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.  

Innovation Credit, Innovation

B.  

Integrative Process Credit

C.  

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.  

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Discussion 0
Questions 26

When a project team sustainably develops a project site, the design should

Options:

A.  

increase water runoff

B.  

maximize construction pollution

C.  

remediate sites already in decline

D.  

replace natural water flow patterns

Discussion 0
Questions 27

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.  

A garden space dedicated to industrial food production for use by local communities

B.  

A garden space with only one vegetation type and species during the summer for visual interest

C.  

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.  

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Discussion 0
Questions 28

Which of the following mandatory recyclable materials is required by MRp1: Planning for Zero Waste Operations for storage and collection?

Options:

A.  

Textiles

B.  

Ceramics

C.  

Corrugated cardboard

Discussion 0
Questions 29

Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.

A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

Options:

A.  

LTc3: Compact and Connected Development

B.  

EAc1: Electrification

C.  

WEc2: Enhanced Water Efficiency

Discussion 0
Questions 30

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

Options:

A.  

Excavated soil

B.  

Wood derived fuel

C.  

Items sent to the local incinerator

D.  

Alternate Daily Cover

Discussion 0
Questions 31

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.  

ASHRAE 55-2010

B.  

ASHRAE 90.1-2007

C.  

ASHRAE 90.1-2010

D.  

ASHRAE 62.1-2010

Discussion 0
Questions 32

Which of the following is an example of nonpotable water that can be effectively used for landscape irrigation to improve water efficiency?

Options:

A.  

Well water from a private borehole

B.  

Dechlorinated swimming-pool water

C.  

Street runoff taken directly from storm drains

Discussion 0
Questions 33

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

Options:

A.  

Roadway distance

B.  

Straight line distance

C.  

Rail freight distance

D.  

Air freight distance

Discussion 0
Questions 34

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.  

Develop the building energy model

B.  

Optimize the green strategies across all aspects

C.  

Calculate the life cycle cost of the building

D.  

Choose an appropriate Commissioning Authority (CxA)

Discussion 0
Questions 35

Which of the following types of water should a project team focus on utilizing to achieve water savings and acquire points under WEc2: Enhanced Water Efficiency, Option 6. Water Reuse, Path 1. Reuse-Ready System, while reducing reliance on potable water?

Options:

A.  

Desalinated ocean water provided by a utility company

B.  

Graywater collected and treated on-site

C.  

Harvested and stored rainwater

Discussion 0
Questions 36

A project pursuing LEED BD+C certification is designed with an electric air-source heat pump as the primary heating system to meet EAp1: Operational Carbon Projection and Decarbonization Plan. However, the client is considering adding a small natural-gas boiler for backup heating during extreme weather.

To earn maximum points under EAp1 while maintaining heating-system reliability, what should the LEED AP recommend regarding supplemental heating?

Options:

A.  

Design an all-electric supplemental heating system using electric-resistance elements or auxiliary heat-pump capacity to eliminate on-site fossil-fuel combustion

B.  

Install a natural-gas boiler with automated controls that limit operation to extreme conditions and include provisions for future conversion to an all-electric system

C.  

Implement a wood-pellet biomass boiler as secondary heating because it qualifies as carbon-neutral without penalizing on-site combustion

Discussion 0
Questions 37

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.  

A sink in an office restroom

B.  

A sink in a school classroom

C.  

A sink in a hotel room bathroom

D.  

A sink in a shared office restroom

Discussion 0
Questions 38

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

Options:

A.  

Flooring

B.  

Furniture

C.  

Composite wood

D.  

Wet applied products

Discussion 0
Questions 39

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Options:

A.  

Light Pollution Reduction, Places of Respite, Open Space

B.  

Heat Island Reduction, Places of Respite, Site Master Plan

C.  

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.  

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Discussion 0
Questions 40

A real estate development company plans to build a mixed-use facility in an urban area. Which of the following strategies should the developer implement to support the local economy?

Options:

A.  

Provide location-efficient affordable housing

B.  

Provide workforce training

C.  

Employ individuals from the local community

Discussion 0
Questions 41

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:

A.  

At least 75% of qualifying land areas within ¾ mile (1.20 km) are previously developed

B.  

At least 75% of qualifying land areas within ½ mile (0.80 km) are previously developed

C.  

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.  

The project is a Federal Renewal Community site

Discussion 0
Questions 42

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

Options:

A.  

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.  

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.  

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.  

The project team need not do anything as GBCI already marked it as an "anticipated" credit

Discussion 0
Questions 43

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.  

Supply air velocity

B.  

Number of occupants

C.  

System ventilation efficiency

D.  

Supply air temperature set point

Discussion 0
Questions 44

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.  

The ESC plan cannot be modified during the design phase of the LEED certification

B.  

The ESC plan can be developed or modified during the design phase of LEED certification

C.  

A compliant ESC plan may be developed during construction

D.  

A compliant ESC plan must be in place when the commissioning authority is appointed

Discussion 0
Questions 45

Which of the following could be considered diverted construction waste?

Options:

A.  

Excavated soil

B.  

Land-clearing debris

C.  

Alternative daily cover

D.  

Asphalt with aggregate

Discussion 0
Questions 46

A facility manager cleaning highly reflective paving material is

Options:

A.  

unnecessarily wasting water

B.  

reducing the heat island effect

C.  

increasing the heat island effect

D.  

lowering the Solar Reflectance Index (SRI)

Discussion 0
Questions 47

When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

Options:

A.  

Height and width of room

B.  

Noise reduction coefficient of the ceiling surface

C.  

Sound absorption coefficient of the floor surface

D.  

Operating sound level of nearest HVAC equipment

Discussion 0
Questions 48

LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?

Options:

A.  

Batch project

B.  

Group project

C.  

Master Site project

D.  

Neighborhood project

Discussion 0
Questions 49

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.  

Mercury containing lamps

B.  

Contaminated soil or groundwater

C.  

Asphalt construction waste

D.  

Asbestos tile and glue

Discussion 0
Questions 50

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.  

At least two years prior to the date of project registration

B.  

Within the past five years

C.  

Within two years of the substantial completion of the project

D.  

At least five years prior to the certification of the project

Discussion 0
Questions 51

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Options:

A.  

Office

B.  

Hospital

C.  

Warehouse

D.  

Data Center

Discussion 0
Questions 52

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Options:

Discussion 0
Questions 53

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

Options:

A.  

Install a preferred drop-off lane for buses meeting the emission requirements

B.  

Provide calculations showing that the average fleet bus meets the emission requirements

C.  

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.  

Document that all buses serving the project achieve a minimum green score of 30 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

Discussion 0
Questions 54

A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.

Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?

Options:

A.  

Install a new natural-gas generator as the primary source of backup power

B.  

Implement solar photovoltaic panels with a battery energy-storage system

C.  

Increase the capacity of the existing diesel generator

Discussion 0
Questions 55

Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

Options:

A.  

Providing an educational program on the environmental and human health benefits of green building practices

B.  

Including locked, indoor bicycle storage for 100% of project occupants

C.  

Being located next to a 20 mi. (32 km) award-winning bicycle trail

D.  

Distributing leaflets to project occupants about available public transit services nearby

Discussion 0
Questions 56

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.  

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.  

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.  

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.  

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Discussion 0
Questions 57

During the early design phase of a new commercial office building, what action should the project team take to reduce the Global Warming Potential (GWP) of refrigerants?

Options:

A.  

Select an HVAC system that uses refrigerants with a GWP of 700 or less

B.  

Delay addressing refrigerant concerns until the commissioning phase, when system performance can be evaluated

C.  

Specify any HVAC system and offset refrigerant emissions through carbon credits later, if needed

Discussion 0
Questions 58

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.  

$75

B.  

$150

C.  

$750

D.  

$1,500

Discussion 0
Questions 59

Which of the following strategies can be used to decrease the envelope load of a building?

Options:

A.  

Provide summer solar shading

B.  

Maximize daylighting

C.  

Decrease opaque wall area

D.  

Use economizers for free cooling

Discussion 0
Questions 60

Which of the following should be analyzed when pursuing an Integrative Design Process focusing on Energy-Related

Systems?

Options:

A.  

Site conditions

B.  

Potable water availability

C.  

Acoustic performance of the project

D.  

Applicability of Green Vehicles to the project

Discussion 0
Questions 61

A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?

Options:

A.  

A description of each use

B.  

The location of parking lots near each use

C.  

Walking routes from the project to each use

D.  

A calculation of the expected number of project occupants who will visit each use

Discussion 0
Questions 62

What role does the LEED AP have when creating the Owner's Project Requirements (OPR) document?

Options:

A.  

Oversees the design team writing the OPR

B.  

Authors the OPR with the design team

C.  

Publishes the completed OPR

D.  

Helps the owner develop the OPR

Discussion 0
Questions 63

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

Options:

A.  

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Discussion 0
Questions 64

Which practice is recommended for protecting HVAC systems during construction to maintain indoor environmental quality and enhance occupant quality of life?

Options:

A.  

Maintain extreme-heat protection

B.  

Use low-emitting materials

C.  

Install temporary air filters

Discussion 0
Questions 65

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

Options:

A.  

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.  

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.  

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.  

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Discussion 0
Questions 66

What is the minimum percentage of gross floor area that must be complete for a project to use LEED BD+C: New Construction and Major Renovations?

Options:

A.  

40%

B.  

100%

C.  

60%

Discussion 0
Questions 67

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

Options:

A.  

A, B, C

B.  

B, C, D

C.  

C, D, E

D.  

A, B, D

Discussion 0
Questions 68

What requirements are needed to earn Regional Priority credits?

Options:

A.  

Full name and specialty credential of LEED AP

B.  

Points are awarded automatically

C.  

Exemplary performance

D.  

Related credits registration

Discussion 0
Questions 69

Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

Options:

A.  

5%

B.  

3%

C.  

2%

D.  

8%

Discussion 0
Questions 70

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

Options:

A.  

Prior to beginning design and are generally not updated

B.  

Once the project design is completed and edited throughout the project

C.  

During predesign and are edited throughout the project

D.  

After the design is completed and are generally not updated

Discussion 0
Questions 71

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.  

12,500 ft2 (1 160 m2)

B.  

15,000 ft2 (1 400 m2)

C.  

25,000 ft2 (2 300 m2)

D.  

35,000 ft2 (3 250 m2)

Discussion 0
Questions 72

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.  

A reduction in at least two categories

B.  

A reduction below the industry average in at least three categories

C.  

A 5% reduction in all categories

D.  

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Discussion 0
Questions 73

In new construction projects, EQc4: Resilient Spaces allows designs to earn points from which of the following management modes?

Options:

A.  

Seismic risks

B.  

Hurricane and tornado risks

C.  

Infection risks

Discussion 0
Questions 74

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

Options:

A.  

Heat gain will reduce the air conditioning load

B.  

Having the lights off reduces the electricity use

C.  

Reduction in lighting fixture use reduces re-lamping

D.  

There would be passive solar heating benefits to all of the classrooms

Discussion 0
Questions 75

Which of the following acoustical units are used in Indoor Environmental Quality Credit, Acoustic Performance to measure reverberation time?

Options:

A.  

T60

B.  

STC

C.  

Hz

D.  

dBA

Discussion 0
Questions 76

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Options:

A.  

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.  

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.  

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.  

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Discussion 0
Questions 77

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

Options:

A.  

Historic district

B.  

Priority designation

C.  

Brownfield remediation

D.  

Diverse uses

Discussion 0
Questions 78

Which of the following credit categories identifies environmental issues that are most relevant for a project's chapter area or country?

Options:

A.  

Location and Transportation

B.  

Energy and Atmosphere

C.  

Sustainable Sites

D.  

Regional Priority

Discussion 0
Questions 79

Which of the following cannot be classified as graywater?

Options:

A.  

Water from toilets

B.  

Water from showers

C.  

Water from kitchen sinks

D.  

Water from lavatory faucets

Discussion 0
Questions 80

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.  

the Phase II ESA uncovers suspected contamination

B.  

contamination was identified by the certified facility

C.  

the certified facility's Phase I ESA is older than 180 days

D.  

the local equivalent standard is more stringent than ASTM E1527-05

Discussion 0
Questions 81

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Options:

A.  

Must include the athletic field and playground

B.  

May include the playground but must exclude the athletic field

C.  

Must include the playground but exclude the athletic field

D.  

May include or exclude the athletic field and the playground

Discussion 0
Questions 82

According to the Integrative Process Credit, Integrative Process, the goal-setting workshop should identify

Options:

A.  

potential project sites

B.  

targeted LEED credits

C.  

expected water demand

D.  

expected energy demand

Discussion 0
Questions 83

A project design team for an elementary school project is attempting to achieve Innovation Credit, Innovation, Option 1. Innovation. Which of the following strategies would qualify?

Options:

A.  

Pilot Credit from LEED Pilot Credit Library

B.  

Exemplary Performance in Energy and Atmosphere Credit, Optimize Energy Performance

C.  

Create educational kiosks and posters around the school with picture of building systems' sustainable features

D.  

Implement a building as a learning lab curriculum that has been piloted in three other primary schools in the district

Discussion 0
Questions 84

Which of the following products must always be included in Materials and Resources credits?

Options:

A.  

Faucets

B.  

Furniture

C.  

Interior Paint

D.  

Fire suppression system

Discussion 0
Questions 85

Where must a building's no-smoking signage be posted?

Options:

A.  

Within 10 ft. (3 m) of all building entrances

B.  

Within 10 ft. (3 m) of the main building entrance(s)

C.  

Within 25 ft. (8 m) of all building entrances

D.  

Within 25 ft. (8 m) of the main building entrance(s)

Discussion 0
Questions 86

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

Options:

A.  

Office projects

B.  

Healthcare projects

C.  

Warehouse projects

D.  

Residential projects

Discussion 0
Questions 87

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:

A.  

earn Water Efficiency Credit, Water Metering

B.  

earn Sustainable Sites Credit, Rainwater Management

C.  

estimate and optimize water use in landscape designs

D.  

estimate and optimize water use in outdoor fountains and pools

Discussion 0
Questions 88

A new mixed-use development includes residential units and commercial spaces. The project is in an urban area with existing pedestrian paths and public transportation infrastructure. How can the project team minimize exposure to emissions from vehicle traffic around the property while ensuring compliance with LEED strategies?

Options:

A.  

Establish mandatory carpooling arrangements for residents and employees

B.  

Integrate indoor plants to absorb carbon dioxide

C.  

Designate a no-idling zone around the building perimeter

Discussion 0
Questions 89

Under LTc3: Compact and Connected Development, Option 1. Surrounding Density, how far from the project site should project teams measure surrounding density?

Options:

A.  

0.5 mi. (0.80 km)

B.  

1 mi. (1.61 km)

C.  

0.25 mi. (0.40 km)

Discussion 0
Questions 90

In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

Options:

A.  

must be calculated using at least 20% from an alternative water source

B.  

must be calculated using 100% potable water

C.  

may be included or excluded from the calculations

D.  

may be calculated using a standard 20% reduction from baseline

Discussion 0
Questions 91

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Options:

A.  

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.  

it is specifically exempted by ASHRAE

C.  

it will be installed by the owner

D.  

the lamp wattage has not been determined

Discussion 0
Questions 92

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

Options:

A.  

Three years of free parking for green vehicles

B.  

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.  

A permanent discounted parking rate of at least 20% for all green vehicles

D.  

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Discussion 0
Questions 93

A project team is designing a new mixed-use development that aims to achieve LEED certification. To encourage electric-vehicle use, the team plans to install EV charging stations in the parking garage. The project site is in a region where 70% of electricity comes from renewable sources.

To align with LEED strategies for sustainable transportation, what consideration should the project team prioritize when installing the EV charging stations?

Options:

A.  

Availability of real-time energy-consumption monitoring at the charging stations

B.  

Provision of free parking for EV users near the charging stations

C.  

Number of charging stations in proportion to the total number of parking spaces

Discussion 0
Questions 94

A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

Options:

A.  

Change the orientation of the design case building

B.  

Optimize the slab depth of the design case building

C.  

Decrease the gross floor area of the baseline building

D.  

Increase the wall mass and types of windows in the baseline building

Discussion 0
Questions 95

During preliminary energy analysis, what energy reduction strategies can best help in reducing the energy load in the new building construction project?

Options:

A.  

Green roof

B.  

Site conditions

C.  

Massing and orientation

D.  

Programmatic and operational parameters

Discussion 0
Questions 96

Which of the following items must have safe collection, storage, and disposal for Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.  

Food waste

B.  

Medical waste

C.  

Electronic waste

D.  

Landscape waste

Discussion 0
Questions 97

A project team is designing an office building and wants to ensure thermal comfort for occupants, especially in naturally conditioned spaces. How should the design team enhance thermal comfort in the naturally conditioned areas?

Options:

A.  

Introduce radiant heating panels

B.  

Increase air speed

C.  

Use low-emissivity windows

Discussion 0
Questions 98

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.  

Measure densities within a ¼ mile (0.40 km) radius of the project boundary

B.  

Measure densities within a ¾ mile (1.20 km) radius of the project boundary

C.  

Measure densities within a ⅓ mile (0.53 km) radius of the project boundary

D.  

Measure densities within a ½ mile (0.80 km) radius of the project boundary

Discussion 0
Questions 99

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

Options:

A.  

Taxi stand

B.  

Ferry terminal

C.  

Local bus stop

D.  

Streetcar stop

Discussion 0
Questions 100

Which of these is a method to assess the regional context of a building's design for sustainability?

Options:

A.  

Conducting a site analysis

B.  

Consulting with neighbors

C.  

Improving a design threshold

D.  

Performing an energy analysis of the building

Discussion 0
Questions 101

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

Options:

A.  

Identify all end uses within the project scope, including fixtures and fittings

B.  

Prioritise alternative water sources to offset overall water demand

C.  

Require equipment specifications to align with the contract documents

Discussion 0
Questions 102

Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.

A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.  

Platinum

B.  

Gold

C.  

Silver

Discussion 0
Questions 103

Every location in the U.S. identifies how many regional credits?

Options:

A.  

Four

B.  

Five

C.  

Six

D.  

Seven

Discussion 0
Questions 104

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Use MERV 8 (F5), or higher, filters

B.  

Provide a hard-lid ceiling

C.  

Create positive pressure in the room

D.  

Provide a large opening to dilute air contaminates

Discussion 0
Questions 105

When should a preliminary water budget analysis be conducted?

Options:

A.  

At the time the design development is completed

B.  

At the time the plumbing contractor is selected

C.  

After completion of schematic design

D.  

Before completion of schematic design

Discussion 0
Questions 106

Which of the following is a strategy to reduce waste produced by a project?

Options:

A.  

Design-build

B.  

Material reuse

C.  

Alternative daily cover

D.  

Custom design

Discussion 0
Questions 107

In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of

Options:

A.  

Materials and Resources Prerequisite, Storage and Collection of Recyclables

B.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

C.  

Materials and Resources Credit, Construction and Demolition Waste Management

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Discussion 0
Questions 108

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.  

Duration of use

B.  

Building floor area

C.  

Make and model of fixtures

D.  

Proposed design fixture flow rates

Discussion 0
Questions 109

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.  

documenting LEED credits

B.  

creating the Basis of Design (BOD)

C.  

developing the LEED Scorecard

D.  

implementing the Commissioning (Cx) Plan

Discussion 0
Questions 110

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.  

Total fixture power

B.  

Site area of the project

C.  

Quantity of installed luminaires

D.  

Total fixture lumens below 90 degrees

Discussion 0
Questions 111

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

Options:

A.  

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.  

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.  

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.  

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Discussion 0
Questions 112

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

Options:

A.  

Real-time monitoring and alerts

B.  

Water-use prediction algorithms based on weather data

C.  

Monthly water-use analysis reports

Discussion 0
Questions 113

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:

A.  

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.  

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.  

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.  

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Discussion 0
Questions 114

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

Options:

A.  

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.  

Energy and Atmosphere Credit, Enhanced Commissioning

C.  

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Discussion 0
Questions 115

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.  

Massing and orientation

B.  

Thermal comfort ranges

C.  

Supply sources

D.  

Plug and process loads

Discussion 0
Questions 116

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

Options:

A.  

Sustainable Sites Credit, Rainwater Management

B.  

Sustainable Sites Prerequisite, Environmental Site Assessment

C.  

Location and Transportation Credit, Sensitive Land Protection

D.  

Location and Transportation Credit, High-Priority Site

Discussion 0
Questions 117

The project team achieved a strategy not addressed in the LEED Green Building Rating System, which proved to be a significant, measurable environmental benefit for the project. What can the project team do in order to get a benefit for this strategy?

Options:

A.  

Submit a regional priority credit

B.  

No benefit can be achieved since the strategy is not included in the rating system

C.  

Submit the manufacturer's product declaration

D.  

Submit an innovation credit

Discussion 0
Questions 118

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.  

Design guidelines for orientation of parking garages along street frontages

B.  

Minimum dimensions for on-street parking spaces required by the zoning code

C.  

Building code standards for structured parking garages

D.  

Minimum number of parking spaces required by the zoning code

Discussion 0
Questions 119

Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

Options:

A.  

A targeted Brownfield remedy plan

B.  

Historic preservation plan to include neighboring properties

C.  

Proximity of vulnerable populations to major sources of air pollution

D.  

The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary

Discussion 0
Questions 120

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Options:

A.  

environmental zone

B.  

longitude and latitude

C.  

ASHRAE 90.1 - 2010 climate zone

D.  

Environmental Protection Agency Phase I Assessment

Discussion 0