LEED AP Building Design + Construction (LEED AP BD+C) Question and Answers

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update Nov 30, 2025
Total Questions : 337

We are offering FREE LEED-AP-BD+C USGBC exam questions. All you do is to just go and sign up. Give your details, prepare LEED-AP-BD+C free exam questions and then go for complete pool of LEED AP Building Design + Construction (LEED AP BD+C) test questions that will help you more.

LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$36.75  $104.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$43.75  $124.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$57.75  $164.99
Questions 1

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

Options:

A.  

gate-to-gate assessment

B.  

cradle-to-gate assessment

C.  

cradle-to-grave assessment

D.  

cradle-to-cradle assessment

Discussion 0
Questions 2

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.  

Split Review

B.  

Appeal Review

C.  

Expedited Review

D.  

Credit Interpretation Ruling

Discussion 0
Questions 3

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

Options:

A.  

HVAC air system for air conditioning

B.  

Electrical lighting system during peak use hours

C.  

Water flow system used for public faucets and toilets

D.  

Condenser water system with a cooling tower and condenser water pumps

Discussion 0
Questions 4

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:

A.  

At least 75% of qualifying land areas within ¾ mile (1.20 km) are previously developed

B.  

At least 75% of qualifying land areas within ½ mile (0.80 km) are previously developed

C.  

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.  

The project is a Federal Renewal Community site

Discussion 0
Questions 5

What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.  

One in which the budget and timeline would benefit from simplified decision making and analysis during the project design

B.  

One in which the project team wants to explore the energy performance and load reduction effects of several envelope and lighting designs and mechanical systems

C.  

One in which the project team wants to achieve efficiency trade-offs between systems, offsetting the lower efficiency of one system by the improved efficiency of another

One in which the owner wants an estimate of the carbon reductions or lower operating costs (energy savings, demand charge savings) from energy strategies, beyond a simple calculation for individual energy conservation measures

Discussion 0
Questions 6

During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

Options:

A.  

Energy meter location

B.  

Equipment Maintenance Plan

C.  

Owner's Project Requirements

D.  

Coordination of other contractors

Discussion 0
Questions 7

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.  

Develop the building energy model

B.  

Optimize the green strategies across all aspects

C.  

Calculate the life cycle cost of the building

D.  

Choose an appropriate Commissioning Authority (CxA)

Discussion 0
Questions 8

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

Options:

A.  

Install an on-site photovoltaic array

B.  

Purchase Green-e certified carbon offsets

C.  

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.  

Install a ground-source heat pump

Discussion 0
Questions 9

A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?

Options:

A.  

Location and Transportation Credit, Access to Quality Transit

B.  

Energy and Atmosphere Credit, Optimize Energy Performance

C.  

Indoor Environmental Quality Credit, Low Emitting Materials

D.  

Indoor Environmental Quality Credit, Daylight

Discussion 0
Questions 10

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

Options:

A.  

A mall with an indoor atrium, featuring a reflective roof

B.  

A parking lot that serves as the location for a monthly flea market

C.  

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.  

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Discussion 0
Questions 11

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

Options:

A.  

3,500,000 ft3 (99 108 m3)

B.  

10,000,000 ft3 (283 168 m3)

C.  

14,000,000 ft3 (396 435 m3)

D.  

35,000,000 ft3 (991 089 m3)

Discussion 0
Questions 12

What is the system boundary that a building life cycle analysis must be defined to account for?

Options:

A.  

Cradle-to-gate

B.  

Cradle-to-grave

C.  

Cradle-to-cradle

D.  

Cradle-to-building

Discussion 0
Questions 13

Which of the following is required when documenting a LEED Pilot credit?

Options:

A.  

Compliance letter

B.  

LEED AP approval

C.  

Innovation narrative

D.  

Pilot Credit registration

Discussion 0
Questions 14

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:

A.  

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.  

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.  

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.  

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Discussion 0
Questions 15

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum percentage requirement for metering any individual energy end uses?

Options:

A.  

Those that represent 10% or more of the total annual consumption of the building

B.  

Those that represent 25% or more of the total annual consumption of the building

C.  

Those that represent 20% or more of the total annual consumption of the building

D.  

Those that represent 15% or more of the total annual consumption of the building

Discussion 0
Questions 16

Which of the following contributes to the value of the commissioning process?

Options:

A.  

Ensuring that the project budgetary goal is met

B.  

Verifying that the building systems perform as intended

C.  

Verifying that the building water fixtures are installed properly

D.  

Ensuring that the project is delivered to meet the permitting requirements

Discussion 0
Questions 17

Which of the following actions should be taken to ensure that project teams understand and prioritize the selection of materials compliant with the Materials and Resources Credit, Building Product Disclosure and Optimization?

Options:

A.  

Include the material requirements in the project specifications

B.  

Select locally sourced and manufactured materials

C.  

Include all building materials in a whole-building life-cycle analysis

D.  

Procure materials directly from raw material suppliers

Discussion 0
Questions 18

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

Options:

A.  

$90

B.  

$225

C.  

$360

D.  

$405

Discussion 0
Questions 19

Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,

Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.  

Architectural floor plans, mechanical plans, lighting plans

B.  

Photometric plans, mechanical schedules, lamp specifications

C.  

Lighting plans, surveys of occupants, sequence of operations

D.  

Surveys of occupants, photometric plans, mechanical schedules

Discussion 0
Questions 20

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

Options:

A.  

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.  

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.  

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.  

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Discussion 0
Questions 21

Which of the following cannot be classified as graywater?

Options:

A.  

Water from toilets

B.  

Water from showers

C.  

Water from kitchen sinks

D.  

Water from lavatory faucets

Discussion 0
Questions 22

An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?

Options:

A.  

Single-zone system

B.  

Multiple-zone system

C.  

Mixed-mode system

D.  

100% outdoor air system

Discussion 0
Questions 23

Which of the following Building Product Disclosure and Optimization credits under the Materials and Resources category would a project team achieve by using insulation material that is cradle-to-cradle V3 Gold certified?

Options:

A.  

Material Ingredients, Option 2. Leadership Extraction Practices and Environmental Product Declarations, Option 1. Environmental Product Declarations (EPD)

B.  

Material Ingredients, Option 1. Material Ingredient Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

C.  

Sourcing of Raw Materials, Option 1. Raw Material Source and Extraction Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

D.  

Sourcing of Raw Materials, Option 2. Leadership Extraction Practices and Material Ingredients, Option 2. Material Ingredient Optimization

Discussion 0
Questions 24

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.  

Measure densities within a ¼ mile (0.40 km) radius of the project boundary

B.  

Measure densities within a ¾ mile (1.20 km) radius of the project boundary

C.  

Measure densities within a ⅓ mile (0.53 km) radius of the project boundary

D.  

Measure densities within a ½ mile (0.80 km) radius of the project boundary

Discussion 0
Questions 25

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.  

At least two years prior to the date of project registration

B.  

Within the past five years

C.  

Within two years of the substantial completion of the project

D.  

At least five years prior to the certification of the project

Discussion 0
Questions 26

Which of the following methods is the referenced standard for demonstrating compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.  

ASHRAE 62.2 - 2007

B.  

ASHRAE 90.1 - 2010

C.  

ASHRAE 55 - 2010

D.  

ASHRAE 62.1 - 2010

Discussion 0
Questions 27

A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

Options:

A.  

The selection of energy-efficient LED fixtures for all of the building's lighting

B.  

The installation of an air-purifying facade material on the front entrance of the building

C.  

The integration of rainwater management strategies to achieve a Regional Priority Credit

D.  

The implementation of a comprehensive metering strategy to measure three individual energy end uses

Discussion 0
Questions 28

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

Options:

A.  

10%

B.  

25%

C.  

50%

D.  

75%

Discussion 0
Questions 29

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

Options:

A.  

Exemplary Performance for a related credit

B.  

Special Circumstances within a related credit

C.  

Regional Priority Credit

D.  

Innovation Credit

Discussion 0
Questions 30

When the project occupancy is not known, which method is recommended?

Options:

A.  

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.  

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.  

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.  

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns

Discussion 0
Questions 31

A project design team for an elementary school project is attempting to achieve Innovation Credit, Innovation, Option 1. Innovation. Which of the following strategies would qualify?

Options:

A.  

Pilot Credit from LEED Pilot Credit Library

B.  

Exemplary Performance in Energy and Atmosphere Credit, Optimize Energy Performance

C.  

Create educational kiosks and posters around the school with picture of building systems' sustainable features

D.  

Implement a building as a learning lab curriculum that has been piloted in three other primary schools in the district

Discussion 0
Questions 32

According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

Options:

A.  

ventilation rates

B.  

functional performance tests

C.  

thermal comfort ranges

D.  

transportation options

Discussion 0
Questions 33

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

Options:

A.  

Locate the project ¼ mile (0.4 km) walking distance from two campus bus system lines (only accessible to campus students) with two stops each

B.  

Locate the project ½ mile (0.8 km) walking distance from two bus lines with two stops each

C.  

Locate the project ¼ mile (0.4 km) walking distance from a planned, funded, and partially complete subway station

D.  

Locate the project ½ mile (0.8 km) walking distance from a planned, not funded commuter rail

Discussion 0
Questions 34

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

Options:

A.  

Local building code

B.  

ASHRAE 62.1-2010

C.  

International Mechanical Code 2012

D.  

The ventilation code requiring the greatest volume of outside air

Discussion 0
Questions 35

A project team wants to educate the facility manager on the installed building systems to improve Indoor Environmental Quality. They want the facility manager to maintain the systems so that they will continue to function as intended. Which of the following should be provided to the facility manager?

Options:

A.  

Vendor invoices for mechanical equipment

B.  

Preventive maintenance plan for the building

C.  

As-built drawings and copies of material submittals

D.  

A copy of the credit documentation for the credits that were approved by Green Business Certification Inc. (GBCI)

Discussion 0
Questions 36

What is the minimum gross floor area required for a Building Design and Construction project to be eligible for

certification?

Options:

A.  

250 ft2 (23 m2)

B.  

500 ft2 (46 m2)

C.  

750 ft2 (70 m2)

D.  

1000 ft2 (93 m2)

Discussion 0
Questions 37

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Discussion 0
Questions 38

A project's massing and site orientation can have a direct impact on which of the following prerequisites?

Options:

A.  

Minimum Energy Performance

B.  

Minimum Indoor Air Quality Performance

C.  

Construction Activity Pollution Prevention

D.  

Fundamental Commissioning and Verification

Discussion 0
Questions 39

Qualifying spaces for the Sustainable Sites Credit, Places of Respite must

Options:

A.  

be located outdoors near a water feature

B.  

be located at least 20 ft. (6 m) from a smoking area

C.  

have provisions for direct medical care to be delivered in the area

D.  

have options for shade or indirect sun for a portion of seating spaces

Discussion 0
Questions 40

For a whole building energy simulation approach, what should be identical for the base building and the proposed building?

Options:

Discussion 0
Questions 41

What percentage of all energy usage is attributable to buildings?

Options:

A.  

60%

B.  

30%

C.  

40%

D.  

50%

Discussion 0
Questions 42

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.  

Install glazing with a higher solar heat gain factor

B.  

Install photovoltaic panels on the sides of the building

C.  

Increase outdoor air intake quantities during summer months

D.  

Recover waste energy through exhaust air energy recovery systems

Discussion 0
Questions 43

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

Options:

A.  

Building Design and Construction: Schools

B.  

Building Design and Construction: Healthcare

C.  

Building Design and Construction: Hospitality

D.  

Building Design and Construction: Data Centers

Discussion 0
Questions 44

The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:

Options:

A.  

Utilizing a rain garden to manage the 98th percentile rainfall event

B.  

Managing 100% of rainfall that falls within the project boundary

C.  

Achievement of both Option 1. Percentile of Rainfall Events and Option 2. Natural Land Cover Conditions

D.  

Utilizing a combination of both structural and non-structural measures to manage the 98th percentile rainfall event

Discussion 0
Questions 45

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

Options:

A.  

Over the entire year

B.  

For the watering month

C.  

For the average watering month

D.  

Over the driest three-month portion of the year

Discussion 0
Questions 46

A facility manager cleaning highly reflective paving material is

Options:

A.  

unnecessarily wasting water

B.  

reducing the heat island effect

C.  

increasing the heat island effect

D.  

lowering the Solar Reflectance Index (SRI)

Discussion 0
Questions 47

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.  

50,000 ft2 (4 645 m2) office project

B.  

80,000 ft2 (7 432 m2) hospital project

C.  

110,000 ft2 (10 219 m2) school project

D.  

140,000 ft2 (13 006 m2) retail project

Discussion 0
Questions 48

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.  

Custom design

B.  

Design-build

C.  

Material science

D.  

Prefabrication

Discussion 0
Questions 49

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

Options:

A.  

Optimize Energy Performance

B.  

Light Pollution Reduction

C.  

Low-Emitting Materials

D.  

Demand Response

Discussion 0
Questions 50

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.  

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.  

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.  

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Discussion 0
Questions 51

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.  

At least 6 ft. (2 m) above the floor

B.  

At least 3 ft. (1 m) away from windows

C.  

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.  

On the ceiling 3 ft. (1 m) away from adjacent walls

Discussion 0
Questions 52

When attempting Regional Priority Credit, what must be provided in LEED Online?

Options:

A.  

Latitude and longitude

B.  

Heating and cooling degree days

C.  

Climate zone

D.  

ENERGY STAR® score

Discussion 0
Questions 53

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

Options:

A.  

Track waste materials per occupant

B.  

Track waste materials used on site

C.  

Document total waste by project cost

D.  

Document total waste per building floor area

Discussion 0
Questions 54

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.  

Design guidelines for orientation of parking garages along street frontages

B.  

Minimum dimensions for on-street parking spaces required by the zoning code

C.  

Building code standards for structured parking garages

D.  

Minimum number of parking spaces required by the zoning code

Discussion 0
Questions 55

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

Options:

A.  

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.  

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.  

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.  

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Discussion 0
Questions 56

Which strategy can maximize the efficiency of water use in an irrigation system?

Options:

A.  

Determine a set rate of irrigation and avoid adjustments

B.  

Set the irrigation controllers on a timer

C.  

Incorporate precipitation sensors with smart irrigation controllers

D.  

Space irrigation sprinkler heads for overlapping coverage

Discussion 0
Questions 57

A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?

Options:

A.  

The project cannot pursue LEED

B.  

The project may pursue Water Efficiency Credit, Indoor Water Use Reduction

C.  

The project does not meet Water Efficiency Prerequisite, Indoor Water Use Reduction, but can make up the points elsewhere in the rating system

D.  

The project can meet the Water Efficiency Prerequisite, Indoor Water Use Reduction, but cannot earn any points under Water Efficiency Credit, Indoor Water Use Reduction

Discussion 0
Questions 58

A comprehensive rainwater management plan may include design elements such as

Options:

A.  

artificial turf, bioretention pond, cisterns and hay bales

B.  

cisterns, porous pavement, swales and vegetated roofs

C.  

soil compaction, swales, vegetated roofs and xeriscaping

D.  

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Discussion 0
Questions 59

Sustainable Sites Credit, Site Assessment requires evaluation of

Options:

A.  

soils, archeology, hydrology

B.  

topography, hydrology, human use

C.  

vegetation, topography, archaeology

D.  

human health effects, climate, land value

Discussion 0
Questions 60

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

Options:

A.  

Temporary wood products cannot be included in the calculations

B.  

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.  

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.  

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

Discussion 0
Questions 61

Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?

Options:

A.  

The square-footage-of-usable-space method

B.  

The space-by-space method

C.  

Glare rating index method

D.  

Seasonal usage peaks method

Discussion 0
Questions 62

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

Options:

A.  

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.  

Energy and Atmosphere Credit, Enhanced Commissioning

C.  

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Discussion 0
Questions 63

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

Options:

A.  

Material reuse

B.  

Bio-based elements

C.  

Extended producer responsibility

D.  

Forest Stewardship Council (FSC) wood products

Discussion 0
Questions 64

Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

Options:

A.  

A targeted Brownfield remedy plan

B.  

Historic preservation plan to include neighboring properties

C.  

Proximity of vulnerable populations to major sources of air pollution

D.  

The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary

Discussion 0
Questions 65

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.  

The general contractor

B.  

A LEED AP

C.  

The project's mechanical engineer

D.  

The owner or an owner's representative

Discussion 0
Questions 66

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.  

The ESC plan cannot be modified during the design phase of the LEED certification

B.  

The ESC plan can be developed or modified during the design phase of LEED certification

C.  

A compliant ESC plan may be developed during construction

D.  

A compliant ESC plan must be in place when the commissioning authority is appointed

Discussion 0
Questions 67

Which one of the following represents quality transit service as defined in Location and Transportation Credit, Access to Quality Transit?

Options:

A.  

A bus stop served by two bus lines Monday through Friday, located 1/8 mi. (0.20 km) from the project building

B.  

A rail station served by one train line Monday through Sunday, located 1/2 mi. (0.80 km) from the project building

C.  

A rail station served by two train lines Monday through Sunday, located 1 mi. (1.60 km) from the project building

D.  

A private shuttle bus stop providing hourly service Monday through Friday to a rail station two hours away, located across the street from the project building

Discussion 0
Questions 68

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

Options:

A.  

Prior to beginning design and are generally not updated

B.  

Once the project design is completed and edited throughout the project

C.  

During predesign and are edited throughout the project

D.  

After the design is completed and are generally not updated

Discussion 0
Questions 69

In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of

Options:

A.  

Materials and Resources Prerequisite, Storage and Collection of Recyclables

B.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

C.  

Materials and Resources Credit, Construction and Demolition Waste Management

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Discussion 0
Questions 70

The required minimum scope of analysis for a product-specific declaration that contributes toward Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1. Environmental Product Declaration is

Options:

A.  

gate-to-gate

B.  

cradle-to-gate

C.  

cradle-to-grave

D.  

cradle-to-cradle

Discussion 0
Questions 71

What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

    Energy and Atmosphere Credit, Demand Response

    Energy and Atmosphere Credit, Advanced Energy Metering

    Energy and Atmosphere Credit, Building Level Energy Metering

Options:

A.  

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Discussion 0
Questions 72

Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.  

ASHRAE 55-2010

B.  

ASHRAE 62.1-2010

C.  

ASHRAE 90.1-2010

D.  

ASHRAE 189.1-2010

Discussion 0
Questions 73

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

Options:

A.  

Preferred parking for green vehicles

B.  

A minimum of 75% of parking spaces under cover

C.  

Access to public transportation stops

D.  

A roof with artificial turf grass

Discussion 0
Questions 74

Where must a building's no-smoking signage be posted?

Options:

A.  

Within 10 ft. (3 m) of all building entrances

B.  

Within 10 ft. (3 m) of the main building entrance(s)

C.  

Within 25 ft. (8 m) of all building entrances

D.  

Within 25 ft. (8 m) of the main building entrance(s)

Discussion 0
Questions 75

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Options:

Discussion 0
Questions 76

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.  

U.S. Internal Revenue Service

B.  

U.S. Department of Agriculture

C.  

U.S. Environmental Protection Agency

D.  

U.S. Department of Housing and Urban Development

Discussion 0
Questions 77

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Options:

A.  

PBT Source Reduction - Lead, Cadmium, and Copper

B.  

PBT Source Reduction - Mercury

C.  

Building Product Disclosure and Optimization - Environmental Product Declarations

D.  

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Discussion 0
Questions 78

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

Options:

A.  

Materials and resources

B.  

Location and site selection

C.  

Regional priority and innovation

D.  

Energy and water related systems

Discussion 0
Questions 79

An accessible garden planted with native plants contributes to the achievement of which of the following credit pairs?

Options:

A.  

Sustainable Sites Credit, Sensitive Land Protection; Sustainable Sites Credit, Site Development - Protect or Restore Habitat

B.  

Sustainable Sites Credit, Open Space; Sustainable Sites Credit, Rainwater Management

C.  

Water Efficiency Credit, Water Metering; Sustainable Sites Credit, Tenant Design and Construction Guidelines

D.  

Location and Transportation Credit, Surrounding Density and Diverse Uses; Sustainable Sites Credit, Site Assessment

Discussion 0
Questions 80

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Options:

A.  

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.  

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.  

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.  

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Discussion 0
Questions 81

What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

Options:

A.  

Photographs of bicycle network signage and directional signposts

B.  

Photographs of the installed bicycle storage and shower facilities

C.  

Vicinity map showing bicycle network, route and distance along network to eligible destination(s)

D.  

Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Discussion 0
Questions 82

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.  

Build a two-story fitness facility

B.  

Change the grade to install a security fence

C.  

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.  

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height

Discussion 0
Questions 83

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

Options:

A.  

Energy and Enhanced Commissioning

B.  

Indoor Environmental Quality, Thermal Comfort

C.  

Energy and Atmosphere, Optimize Energy Performance

D.  

Indoor Environmental Quality, Interior Lighting

Discussion 0
Questions 84

What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?

Options:

A.  

98th percentile

B.  

85th percentile

C.  

95th percentile

D.  

100th percentile

Discussion 0
Questions 85

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn't have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

Options:

A.  

Contact another manufacturer that has a comparable product with an EPD

B.  

Exclude the flooring from the LEED credit as non-compliant

C.  

Request recycled content information, as the ISO 14040/44 LCA is not sufficient for compliance

D.  

Use the ISO 14040/44 LCA information just like an EPD to complete the documentation for the LEED credit

Discussion 0
Questions 86

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.  

Massing and orientation

B.  

Thermal comfort ranges

C.  

Supply sources

D.  

Plug and process loads

Discussion 0
Questions 87

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.  

At the main entrance, 10 ft. (3 m) from the door

B.  

At the main entrance, 25 ft. (7.5 m) from the door

C.  

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.  

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Discussion 0
Questions 88

Which of the following products are eligible for a WaterSense label?

Options:

A.  

Tankless toilets

B.  

Waterless urinals

C.  

Public lavatory faucets

D.  

Private lavatory faucets

Discussion 0
Questions 89

An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.  

The kitchen sink is included in fixture calculations, the dishwasher and coffee machine must be ENERGY STAR® or performance equivalent

B.  

The kitchen sink is included in fixture calculations, the dishwasher must be ENERGY STAR® or performance equivalent, and the coffee machine is not included in the prerequisite

C.  

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine is not included in the prerequisite

D.  

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine should be included in fixture calculations

Discussion 0
Questions 90

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Options:

A.  

environmental zone

B.  

longitude and latitude

C.  

ASHRAE 90.1 - 2010 climate zone

D.  

Environmental Protection Agency Phase I Assessment

Discussion 0
Questions 91

Which of the following credits advocates the values and benefits of green building design and construction as well as outdoor physical activity?

Options:

A.  

Sustainable Sites Credit, Light Pollution Reduction

B.  

Sustainable Sites Credit, Open Space

C.  

Environmental Quality Credit, Quality Views

D.  

Location and Transportation Credit, Reduced Parking Footprint

Discussion 0
Questions 92

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.  

Basis of Design (BOD)

B.  

Simple Box Energy Model Analysis

C.  

System's manual

D.  

Integrated Project Delivery report

Discussion 0
Questions 93

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.  

Compliance Path 2: Usage-Based Calculation; prescriptive compliance confirmation

B.  

Compliance Path 2: Usage-Based Calculation; appliance water calculations

C.  

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.  

Compliance Path 1: Prescriptive Achievement; product cutsheets

Discussion 0
Questions 94

For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan, which of the following

items is required for credit compliance?

Options:

A.  

MERV 13 (F7) filtration media

B.  

Indoor Environmental Quality test results

C.  

Photographic documentation

D.  

Separating construction waste

Discussion 0
Questions 95

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.  

The credit is not feasible for this project

B.  

The credit may be achieved by using nonroof measures only

C.  

The credit is applicable for projects that document this special condition

D.  

The credit can only be achieved by using an alternative compliance path

Discussion 0
Questions 96

U.S. Green Building Council (USGBC)'s vision for using LEED internationally includes

Options:

A.  

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED

B.  

creating multiple LEED rating systems for different countries

C.  

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.

D.  

providing opportunities for alternative compliance paths that meet the unique needs of a particular region

Discussion 0
Questions 97

A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?

Options:

A.  

Large maple trees for shading

B.  

Xeriscaping landscape beds

C.  

Turf grass area for picnic benches

D.  

Tropical flowers next to park benches

Discussion 0
Questions 98

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

Options:

A.  

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.  

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.  

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.  

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Discussion 0
Questions 99

Which site preparation and construction method contributes to earning the Materials and Resources Credit, Construction and Demolition Waste Management?

Options:

A.  

Reuse excavated soil and land-clearing debris

B.  

Implement in situ soil remediation and post removal of the existing concrete pavement

C.  

Salvage and recycle 50% of the existing materials (based on volume) generated during site demolition for three material streams

D.  

Ensure reduction of pollution from construction activities by using airborne dust generation capture systems

Discussion 0
Questions 100

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

Options:

A.  

A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site

B.  

A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site

C.  

A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock

D.  

A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Discussion 0
Questions 101

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

Options:

A.  

Wall

B.  

Steel

C.  

Glass

D.  

Concrete

Discussion 0