Spring Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

ExamsBrite Dumps

Advanced HPE Storage Architect Written Exam Question and Answers

Advanced HPE Storage Architect Written Exam

Last Update Feb 28, 2026
Total Questions : 60

We are offering FREE HPE7-J01 HP exam questions. All you do is to just go and sign up. Give your details, prepare HPE7-J01 free exam questions and then go for complete pool of Advanced HPE Storage Architect Written Exam test questions that will help you more.

HPE7-J01 pdf

HPE7-J01 PDF

$36.75  $104.99
HPE7-J01 Engine

HPE7-J01 Testing Engine

$43.75  $124.99
HPE7-J01 PDF + Engine

HPE7-J01 PDF + Testing Engine

$57.75  $164.99
Questions 1

On which object is snapshot locking with Qumulo implemented?

Options:

A.  

File

B.  

Volume

C.  

Directory

D.  

Storage pool

Discussion 0
Questions 2

An HPE Partner is talking to a potential customer about the HPE Alletra MP B10000 storage array solution. What is an important feature the partner should share with the customer?

Options:

A.  

When writing data into volatile memory, SCM is persistent with batteries.

B.  

Stripe sizes vary from 16 (data) + 3 (parity) to 146 (data) + 3 (parity).

C.  

If locally decodable EC is implemented by the customer, this will increase rebuild time.

D.  

The behavior of common applications can be predicted with Workload Simulator.

Discussion 0
Questions 3

An HPE Partner is sizing an Alletra MP B10000 array for a customer using the HPE Ninja Sizer online tool. When tuning the solution, the partner is not getting the best read and write performance from the array.

Use your cursor to place a + where the partner can click in the web GUI to begin to determine how to correct this Issue and appropriately size the solution for the customer.

Options:

Discussion 0
Questions 4

An administrator needs to create a backup policy for an Oracle database using the RMAN tool.

Use your cursor to place a + where the administrator can click to configure this option in StoreOnce.

Options:

Discussion 0
Questions 5

A customer intentionally removes all three drives from a JBOF from an HPE Alletra MP X10000 used in an HPE GreenLake for File Storage solution. What is the correct description of the result of this action?

Options:

A.  

This results in the start of a rebuild on an integrated spare drive. After the rebuild/resync of the spare is complete, data services will be available and I/O will continue.

B.  

This results in a catastrophic failure with an I/O outage, as no data service is available and the system is not in RO mode. To recover, the customer should reinsert the same three drives, which will recover the system.

C.  

This results in a catastrophic failure, with an I/O outage as no data service is available and the system is not in RO mode. To recover, HPE support/engineering needs to be involved and try the recovery steps.

D.  

This results in the start of a rebuild on an integrated spare drive. After the rebuild/resync of the spare is complete, the customer must contact HPE support/engineering to complete the process.

Discussion 0
Questions 6

A customer wants to implement HPE Cloud Bank Storage with the detach option LTU feature. Which statement is correct regarding the implementation of this feature?

Options:

A.  

HPE Cloud Bank Store must be connected using the connect (read-write) option.

B.  

A detached Cloud Bank datastore can only be reconnected to the HPE StoreOnce system from which it was detached.

C.  

HPE Services is always required when reconnecting a detached datastore.

D.  

Support for reading and writing to the detached datastore is supported with the detach license installed.

Discussion 0
Questions 7

Match the fibre channel topology to its use case. Each answer will be used once.

Options:

Discussion 0
Questions 8

What is a prerequisite for a successful Fibre Channel storage array Peer Motion migration?

Options:

A.  

An N-Port ID Virtualization (NPIV) capable FC fabric between the source and destination.

B.  

IP connectivity to initiate and control the data migration.

C.  

A direct connection between storage arrays via their FC ports.

D.  

The configuration of a maximum of eight peer link pairs.

Discussion 0
Questions 9

An administrator needs to create an FCIP trunk connection between two data centers to interconnect their Brocade fibre data fabrics. Refer to the exhibit.

Based on this configuration, which statement is correct?

Options:

A.  

This is an invalid configuration. FOP trunks must be configured with an even number of circuits.

B.  

This is an invalid configuration. FCIP trunks must be configured using fibre channel ports.

C.  

This is a valid configuration. The trunk will have one active connection and two standby connections.

D.  

This is a valid configuration. The trunk will have two active connections and one standby connection.

Discussion 0
Questions 10

A storage administrator is creating a disaster recovery solution for HPE Alletra 9000 storage arrays. Currently, the company has three storage arrays at three different primary sites. When implementing the N-to-1 Remote Copy (RC) feature, what is the minimum number of storage arrays the storage administrator needs to plan for at the disaster recovery site?

Options:

A.  

One

B.  

Two

C.  

Four

D.  

Six

Discussion 0
Questions 11

Which statement is correct concerning the hardware configuration of the HPE Alletra 5000 storage arrays?

Options:

A.  

The SSD drives are installed in slots 22-24.

B.  

The head shelf must have the maximum number of SSD drives installed.

C.  

A maximum of six SSD drives are supported across the entire system.

D.  

Dual Flash Carriers support both SAS and NVMe SSD drives.

Discussion 0
Questions 12

A customer has a variety of HPE Alletra arrays running various VM workloads managed by VMware vCenter. These arrays are managed with HPE GreenLake. The customer is concerned they are not getting the best efficiency from the HPE storage arrays. You access CloudPhysics in GreenLake to get an overall view of the hosts and VMs that have the biggest impact on the customer's current environment. Which card should you first examine to see this information?

Options:

A.  

Summary for VMware vCenters

B.  

Simulator for VM Rightsizing

C.  

Shared Storage Analysis

D.  

Host Analysis

Discussion 0
Questions 13

A customer needs to replace its HPE Alletra 6000 storage array with either an HPE Alletra 9000 managed with GreenLake or an IBM FlashSystem solution. Which two advantages should an HPE Partner share with the customer as to why the customer should opt for the HPE storage solution? (Choose two.)

Options:

A.  

Fractional scaling

B.  

Full stack automation with hybrid cloud

C.  

Ransomware detection

D.  

AIOps for infrastructure

E.  

Granular disaster recovery

Discussion 0
Questions 14

An administrator manages a group of HPE Alletra MP B10000 arrays through the DSCC console. They want to improve the available space for the storage arrays. What should the administrator change to increase the achievable space efficiency?

Options:

A.  

Change the High Availability option to Drive Level.

B.  

Change the Sparing Algorithm to Default.

C.  

Change the Sparing Algorithm to Minimal.

D.  

Change the High Availability option to Enclosure Level.

Discussion 0
Questions 15

A customer wants to implement an HPE Morpheus life-cycle management solution at a single site with 1004 VMs using a redundant architecture and distributed services. Which statement is correct regarding the setup and operation of this solution?

Options:

A.  

The solution requires a minimum of six VMs, but it is recommended to have a minimum of 10 VMs.

B.  

The RabbitMQ load balancer is a required component of the installation.

C.  

It is a simple installation and configuration, wherein Morpheus installs and configures all required services.

D.  

Upgrades require a minimal amount of downtime when updating to a newer version of Morpheus.

Discussion 0
Questions 16

A customer is concerned about the long distances between their data centers and significant latencies that might exist between the SAN fabrics at the two data centers. Since SCSI write operations can involve multiple handshake messages between the target and initiator, which Brocade feature should be used to double the recommended distance, but maintain the same latency as a shorter haul link?

Options:

A.  

FastWrite

B.  

FCIP trunking

C.  

Write Acceleration

D.  

Leave Fast

Discussion 0
Questions 17

What will occur when a new node is added to an existing HPE Alletra MP X10000 storage array?

Options:

A.  

An automatic cluster upgrade is supported across all releases of the operating systems and models.

B.  

The expanded capacity is immediately available in the shared pool.

C.  

Additional drives can be used to increase drive protection beyond the default limit of three drives.

D.  

An automatic rebalancing across JBOFs occurs as soon as a new drive or an additional JBOF is added.

Discussion 0
Questions 18

A storage administrator will be implementing the HPE Peer Persistence feature between many arrays at many different sites across the company. The administrator will be using the Quorum Witness (QW) solution to determine when automatic failover will occur between the primary and secondary arrays. Which statement is correct regarding the use of this feature?

Options:

A.  

The QW is active and will initiate a failover when a split-brain situation occurs between two HPE Peer Persistence storage arrays.

B.  

The QW can only be installed as a VM solution on Red Hat Enterprise Linux or SUSE Linux.

C.  

The QW should be installed at a site that is different from where the primary and secondary storage arrays are located.

D.  

The QW requires IP and fibre channel (FC) connectivity between the QW and the storage arrays.

Discussion 0