Waratah Hospital, located in Australia, plans to move many data center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital engaged an external consultant to help with the new data center network design.
Based on the data center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document’s contents.
Requirements and information:
Six racks in the data center room (a single row).
Redundant Top of Rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the racks (hot aisle).
OOB management for servers, storage, and network must be delivered through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building with links providing 400 Gbps.
Internet access is provided through an existing firewall cluster with two firewalls, with each firewall in one data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data center network must connect to these firewalls with links totaling 100 Gbps.
The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources are within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
In the past, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
Refer to the scenario. You have learned that the customer must extend two VRFs between the new data center network and the firewall. To meet the scenario requirements and general best practices, what should you recommend for connecting border leaf switches to the hospital core?
Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has hired an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the rack racks (hot aisle).
OOB management for servers, storage, and network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building using links that provide 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.
The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources reside within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
In the past, the hospital experienced a security breach that resulted in data loss, network downtime, and identity theft.
Given the scenario, which environmental requirements are stated? Choose two.
A customer is upgrading its data-center structured cabling to SMF. At the same time, the customer wants to upgrade the spine switches in its spine-and-leaf topology. A key objective of this upgrade is to eventually support 400GbE leaf-to-spine links. However, for some time, many leaf switches will continue to support 100GbE uplinks.
What is a valid recommendation for the spine switches?
You are implementing a spine-and-leaf architecture using 18 CX 8360-48Y6C v2 leaf switches and two CX 8325-32C spine switches. The leaf switches support servers with 10- and 25-GbE ports. You currently plan to use two 100-Gbps uplinks per leaf switch.
The customer now requires at least a 50% increase in uplink bandwidth per leaf switch. What is a valid modification to the plan?
What is one advantage of using a VSX pair rather than two discrete switches to connect servers, storage, firewalls, and other workloads?
You have designed an L3 spine-and-leaf topology for a customer’s highly virtualized VMware vSphere data center. The customer already uses HPE Aruba Networking mobility and switching solutions in the campus. You are recommending CX 8325 and CX 9300 switches and Fabric Composer. The customer asks you to justify the cost of the Fabric Composer licenses.
What should you explain?
A customer has deployed CX 10000 switches, Fabric Composer, and Pensando Policy and Services Manager (PSM). The switches are discovered in PSM, but no VRFs or networks have been added. The customer now wants to begin by applying micro-segmentation to one network. They state that they plan to add a policy containing rules that permit desired traffic from endpoints in this network. They will apply it to the network as an egress policy. At this time, they will not add any other networks to PSM or apply policies to them.
What warning should you raise to the customer about this plan?
Which statement correctly describes flow synchronization for HPE Aruba Networking CX 10000 Distributed Services Modules (DSMs) operating in VSX?
A customer is deploying a cluster of twelve servers for AI workloads. Each server has four NVIDIA GPUs connected through NVLink. Each server supports 400 GbE connectivity on as many as six ports; however, you may recommend fewer ports. You have been asked to design a network for the servers’ backend AI interconnect.
Based on HPE Networking recommendations for this workload, how many CX 9300-32D switches should you propose?
You have been asked to help design an HPE Aruba Networking CX network solution that connects AI servers to file storage. The solution must support NFS over RDMA and deliver 400 GbE links to the edge. The current design uses leaf and spine switches that carry all traffic in VXLAN tunnels. Every switch is a CX 9300-32D switch.
What is one correction you should make to the design?
You are engaged by a customer with 1,115 employees to update the network after the previous network manager has left the company. Which methods can validate the present network state when the available network documentation is out of date? Choose two.
You are designing a pair of CX switches to function as ToR switches. The switches use VSX in a data-center Layer 2 topology and connect to the core through VSX LAGs. To satisfy expansion requirements, you must keep as many ports available as possible.
Which option should you recommend for VSX keepalives?
You have designed a two-tier L2 data center network for a customer. While presenting the solution, the customer states that they have a mission-critical multicast application with sources and receivers in the data center.
Which CX feature, in addition to features supplied by the PIM-SM standard, should you explain to emphasize the value of your solution?
You are replacing the access layer in a customer data center network that uses VMware NSX. The customer has identified several subnets outside the VMware platform for which the customer wants to add overlay routing.
What high-level plan will work for this customer?
You are designing an L3 spine-and-leaf topology using CX switches. The switches implement EVPN VXLAN with a distributed gateway model. You are helping implementers compile a list of required loopback interface IDs and IP blocks.
What information is needed from the customer to complete this list?
An RFP states that the proposal must be TAA-compliant. What conclusion should you make?
A customer operates a highly virtualized data center for which you are designing a two-tier Layer 2 data center.
What are the characteristics of a design that extends VLANs only to the ToR switches and server ports that strictly require those VLANs? Choose two.
A long-time customer has just acquired a company and plans to bring the new data-center sites up to its standards. The customer has requested a bill of materials based only on the locations and port counts at the data-center sites.
Which valid assumptions should be documented in the proposal? Choose two.
You are completing a proposal for a data center network that includes 14 CX 8325 switches, 6 CX 6300M switches, and Fabric Composer licenses for these switches.
What is one assumption that could be included in the assumptions documentation?
A customer wants to turn as many upfront costs as possible into smaller recurring bills. For which components can HPE GreenLake for Networking offer recurring billing?