Match each network protocol to the correct server listening port. Not all answers will be used.
Refer to the exhibit.
The above command was applied to an Aruba AOS-CX 6300M 24-port switch with 4-port SFP56 uplinks. All ports are set as access switchports.
Which ports carry VLAN 1 traffic?
You have completed a successful VSF stack between two switches.
Without manually assigning a backup switch, what is the expected output when issuing a show vsf command?
What are two features in a 2-Tier design that are implemented at the Access layer? (Choose two.)
Refer to the exhibit.
The Aruba 8400 in the exhibit is member 2 of a VSX stack.
Which command will enter the interface sub configuration mode for the port, indicated by the orange square?
Refer to the exhibit.
Using the static IP address configured above, what is the converted binary value of the third octet assigned to the local interface?
Core(config)# user admin password
Core(config)# interface mgmt
Core(config-if-mgmt)# ip static 10.254.16.89/22
Core(config-if-mgmt)# default-gateway 10.254.19.129
Core(config)# ssh server vrf mgmt
Core(config)# https-server vrf mgmt
You are tasked with configuring the Core switch to be managed by NetEdit. Currently, the Core switch is at factory-default settings.
Which two steps are missing? (Choose two.)
What connectivity commands are available on AOS-CX switches? (Choose two.)
Click on the colored box that corresponds with the line that best represents Broadcast traffic flow.
Refer to the exhibit.
What change on Core-1 will result in a successful ping to 10.1.1.254 from the management interface?
Refer to the exhibit.
You are in the process of configuring VSF between Access-1 and Access-2. Access-1 has been configured as the VSF Master.
What is a valid configuration for Access-2 to join the VSF stack?