HPE Edge-to-Cloud Solutions
Last Update Dec 2, 2024
Total Questions : 74
We are offering FREE HPE0-V27 HP exam questions. All you do is to just go and sign up. Give your details, prepare HPE0-V27 free exam questions and then go for complete pool of HPE Edge-to-Cloud Solutions test questions that will help you more.
Your customer needs a storage solution for their geographical information system (GIS) video storage. The software they use requires an SMB file share and writes video files of various sizes based on the bitrate of the cameras. They keep all video for a minimum of 10 years. They expect the size of their archive to grow over as cameras charge.
Which solution meets the customer’s requirements?
You are proposing a storage expansion solution to a customer Fibre Channel Array, to avoid capacity and performance issues.
Which additional points should you consider in your proposed solution? (Choose two.)
A customer is interested in a HPE SAP HANA solution based on HPE SuperDome Flex and HPE Alletra 9000.
Which additional product should you offer them?
Your customer needs assistance updating their database infrastructure with a modern solution that will grow with their needs and free up their IT staff to focus on value added activities.
Which of the following benefits would the customer receive by choosing HPE GreenLake for database?
A Customer wants to expand their existing HPE SimpliVity cluster. You propose adding a similar size host with newer generation Intel CPUs.
What needs to be done to facilitate adding the new hosts to the cluster?
Your customer has asked for various UEFI BIOS settings to be preconfigured at the Factory in their new servers.
How do you submit the request for these changes to HPE?
Your client needs a departmental Storage array to host a VDI workload at a remote office. The networking infrastructure is limited and the client has decided to connect the ESXi host servers with 12Gbps SAS.
Which HPE Storage product will meet their requirements?
You need to include non GreenLake enabled ISVs in a customer solution.
With whom should you engage if you need help with this solution?
Which tool is available to help you to engage with the customer to present the economic impact of an HPE GreenLake solutions?
Your customer has the following concerns about your dHCI proposal:
The extended lead times for some parts of the solution do not meet their Project timelines.
They do not have sufficient IT resources to deploy a new solution.
They are struggling with the initial cost outlay.
Which solution addresses all three of their concerns?
Your customer would like to add a backup component to the HPE GreenLake solution that you are preparing for them. Their main requirements are cost-optimized backups, long term data retention, and operational simplicity.
What component should you add to their solution?
Your customer is concerned about accessing business KPIs such as costs and usage rates for their new HPE aaS solution.
Where can a customer Access these KPIs?
Compared to OCA, which additional datacenter characteristic is required to configure a solution in SSET?
Your customer needs the BTU rating for the complete rack level solution you have proposed to ensure it fits their thermal requirements.
Which tools can provide you with this data? (Choose two.)
You have designed an HPE Synergy solution for a customer site. The customer wants to use this solution design as a blueprint to implement the same solution in 200 locations. They want to minimize cost for installation and configuration and therefore plan to order everything Factory pre-installed and pre-configured.
Which HPE tool can you use to document the customer requirements and attach them to the order?
Your customer has asked for a new storage platform for their mission critical Microsoft SQL environment. The environment has outgrown its current platform and is expected to see additional growth as new applications are brought online. You recommend HPE Alletra 9000.
What HPE Alletra 9000 business values should you discuss as part of your recommendation? (Choose two.)