HPE Compute Solutions
Last Update Oct 15, 2025
Total Questions : 104
We are offering FREE HPE0-S59 HP exam questions. All you do is to just go and sign up. Give your details, prepare HPE0-S59 free exam questions and then go for complete pool of HPE Compute Solutions test questions that will help you more.
Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer's requirements?
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?
The proposal consists of.
- 3 HPE Synergy 12000 frames
- 6 HPE Composer 2 modules
- 2 HPE Virtual Connect SE 100 GO F32 Module
- 4 HPE Synergy 50 GO interconnect Link Module
Which statements about this proposed design are true? (Select two.)
Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61
Which statement about this update process is true?
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?
Your customer uses HPE OneView to manage their HPE Synergy environment. They plan to use it to manage a new set equipment that includes.
- 20 HPE ProLiant DL365 Gen10 Plus servers
- 20 HPE ProLiant DL380 Gen10 Plus servers
- 5 HPE Primera 650
- 5 HPE MSA 2062 Storage Array
Which statements about now OneView will work with this new equipment are true? (Select two)
Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.
Which statement about these two systems is true?
After deploying an HPE Superdome Flex 280, you need to check the network protocol status and SSL certificate.
Click the appropriate section In the HPE Superdome Flex 280 management interface that will allow you to complete this task.
Your customer with an HPE Synergy environment needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Which parameter can the customer configure within an uplink set to meet their requirements?
Click the port on the Frame Link Module which is used to include an HPE Synergy frame in the management ring.
Your customer wants to update the firmware for 36 HPE Synergy 480 Gen 10 compute modules with a server profile assigned from a server profile template.
Put the steps required to achieve this goal on the left into their correct order on the right.
Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?
Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter.
The customer wants to use them to manage HPE Synergy Gen10 compute modules, HPE ProLiant Gen10 servers, and an MSA array.
Which statement about compatibility of the existing environment with the planned software components is true?
Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.
What must be done to enable dedicated FC connectivity for this HPE Synergy frame?
Your customer used to manage their HPE 3PAR arrays using HPE OneView Now they have replaced these arrays HPE Primera.
How does managing the new arrays compare to managing their old arrays?
One of the administrators added some connections within a server profile that was created using a template. This server profile did not report inconsistency.
What is the most likely reason for this behavior?
Click the area within the management interface that will allow you to check whether an HPE OneView SSO certificate is properly applied.
Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed
Which tool should you use to troubleshoot the problem?
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex 280 They plan to manage new components using HPE OneView
What must be done to achieve this goal?
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.
Refer to the exhibit.
Which statement about this logical interconnect group is true?
Your customer needs to move an application from an HPE Synergy 480 Gen10 Compute Module to an HPE Synergy 660 Gen 10 Compute Module. The 480 has a switch that has been manually zoned outside of HPE OneView.
What must the customer do before migrating the application?
Your customer has the following HPE Synergy setup:
- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port
- 2 HPE Composer 2 modules
- 15 HPE D3940 Storage Modules, one per frame
- 2 HPE 12Gb SAS switches per frame
Which statement about this setup is true?
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Your customer plans to deploy VMware vSAN using D3940 Storage Modules.
Which statement about this solution is true?