Big Black Friday Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

GAQM CLSSBB-001 Exam Overview :

Exam Name Certified Lean Six Sigma Black Belt (CLSSBB)
Exam Code CLSSBB-001
Actual Exam Duration 120 minutes
Expected no. of Questions in Actual Exam 100
Official Information https://gaqm.org/certifications/lean_six_sigma/clssbb
Take Self-Assessment Use GAQM CLSSBB-001 Practice Test to Assess your preparation - Save Time and Reduce Chances of Failure

GAQM CLSSBB-001 Exam Topics :

Section Weight Objectives
1.1 Section I – Organizational Roadblocks and Lean Management  
  • Organizational roadblocks
  • Resistance Analysis
  • Overview of all Continuous Improvement approaches
  • Overview of Lean
  • Overview of Six Sigma
  • Lean Management explained — TAKT Time, Cycle Time, PCE, Lead Time, SWIP, Setup time, Changeover time
  • Lean Tools explained — 5S, Kaizen, SMED, Heijunka
1.2 Section II – Pre-define DMAIC  
  • DMAIC versus DFSS
  • Pre-define Pre-requisites and Qualifications
  • Project Prioritization Matrix
  • Introduction to Enterprise Wide view versus LOB view
  • NPV and IRR
1.2.2 Define  
  • Champion’s transfer of project
  • Team dynamics and facilitation
  • Project Charter’s role
  • SIPOC/COPIS map
  • VOC/VOB/VOP
  • CTQ, CTC, CTS
  • VOC – CTQ Tree
  • Kano Model
  • Quality Function Deployment
  • Baseline performance of Y
  • Business Metrics for Y
  • Rolled Throughput Yield (RTY)
  • Statistical Definition of Six Sigma
1.3 Section III – Measure  
  • Objectives of Measure Phase
  • Types of Data and Data Distribution models (Normal, Binomial and Poisson Distribution discussed)
  • Scales of Data
  • Measures of Central Tendency
  • Measures of Dispersion
  • Measurement Systems Analysis
  • Variables GAGE RR
  • Attribute RR
  • Stability Check — Importance of Stability
  • Capability Check — Cp, Cpk, Cpkm explained, How to understand Attribute Capability
  • Variations, Variability and Capability
  • Graphical tools to understand Data distribution
  • Understanding Weibull (2 Parameter, 3 Parameter and Rayleigh) Distribution
  • Correlating Calculations to Business Measures
  • Checking Normality of Data (Anderson Darling, Ryan Joiner and Kolmogorov Smirnov)
1.4 Section IV – Analyze  
  • Objectives of Analyze
  • Simple Linear Regression
  • Multiple Linear Regression
  • Curvilinear Regression
  • Fishbone Diagram
  • Pareto Charts
  • Demarcating Common Causes and Special Causes
  • Hypothesis Tests (Parametric and Non-Parametric tests)
  • Statistical Validation
1.5 Section V – Improve  
  • Objectives of Improve
  • Cost Benefit Analysis
  • Solutions Prioritization Matrix
  • Pugh Matrix
  • Design of Experiments
  • Introduction to DOE
  • Basics of DOE
  • Replication, Randomization and Blocking
  • Main Effects and Interaction effects
  • Full factorial experiments
  • Fractional factorial experiments
  • Screened Designs
  • Response Surface Designs
  • DOE with Regression
  • DOE with example
1.6 Section VI – Control  
  • Taguchi’s Loss Function
  • Control Charts (Variable Control Charts and Attribute Control Charts)
  • Measurement System Re-analysis
  • Control Plan and Project Storyboard Transfer
  • Project Closure
  • Introduction to Total Productive Maintenance
  • Lean Process Improvement
Lean Process Improvement  
  • Understanding Lean
  • The Toyota Production System
  • The Toyota Production System House
  • The Five Critical Improvement Concepts
  • Understanding Value with the Kano Model
  • Types of Waste
  • Creating a Lean Enterprise
  • Understanding Lean
  • The Plan, Do, Study, Act (PDSA) Cycle
  • Using the R-DMAIC-S Model
  • Lean Thinking Tools
  • Kaizen Events
  • Data Gathering and Mapping