ISTQB Foundation Level - Acceptance Testing Question and Answers

ISTQB Foundation Level - Acceptance Testing

Last Update May 17, 2024
Total Questions : 40

We are offering FREE CTFL-AcT iSQI exam questions. All you do is to just go and sign up. Give your details, prepare CTFL-AcT free exam questions and then go for complete pool of ISTQB Foundation Level - Acceptance Testing test questions that will help you more.

CTFL-AcT pdf

CTFL-AcT PDF

$35  $99.99
CTFL-AcT Engine

CTFL-AcT Testing Engine

$42  $119.99
CTFL-AcT PDF + Engine

CTFL-AcT PDF + Testing Engine

$56  $159.99
Questions 1

The standard ISO 25010 defines a quality in use model with characteristics and subcharacteristics. Which elements of the following list is a characteristic of quality in use according to this standard?

Options:

A.  

Efficiency

B.  

Usability

C.  

Compatibility

D.  

Portability

Discussion 0
Questions 2

As a tester you participate in the project of the decision support system for granting a loan. You are asked to review the acceptance criteria for the following requirement:

REQ 3.28. The automated system records critical credit application data (CCAD. needed to support application screening.

Assume that it is well known what kind of data CCAD are. Which of the following would be the BEST example of an acceptance criterion for this requirement?

Options:

A.  

The CCAD are stored in the MySQL relational database after each successful data entry procedure.

B.  

The CCAD is not recorded if it is incomplete and a message is displayed.

C.  

The CCAD record process is quick and reversible.

D.  

The process for collecting CCAD meets corporate usability guidelines.

Discussion 0
Questions 3

Which one of the following statements regarding performance testing is MOST correct?

Options:

A.  

Depending on the model used to simulate the workload, performance tests are called load, stress or endurance / stability tests.

B.  

Performance testing aims to determine a system’s robustness against malicious attacks.

C.  

The performance of the system is measured in a context that reflects, as far as possible, representative operating conditions.

D.  

The performance test results serve to determine hardware and software performance requirements.

Discussion 0
Questions 4

The project team is currently facing a difficult situation originating from their difficulty in envisioning the future and the necessary steps to reach it together with a certain loss of motivation due to a strong feeling of stagnation. You try to unlock the situation by proposing a workshop. Which one would fit the best?

Options:

A.  

You ask two volunteers to play a part in front of the team. One will try to defend the project and propose positive arguments and ways forward. The other will do the opposite. You then recapitulate the major arguments of both sides and debate them openly with the team.

B.  

You draw a staircase with 11 steps, each of them representing a major milestone of the project. The bottom of the stairs corresponds to the first day of the project and the upper step means that the project is released. You locate the present situation in the middle of the stairs. The team is asked to identify and discuss the major steps down and up.

C.  

You organize a day out with challenging physical exercises practiced in teams followed by an afterwork dinner and drink. After all, nothing is best for motivation than hard times together, strong common objectives and a promise of good time.

D.  

You visualize all remaining major milestones of the project, starting with today and ending with project release. Then, you ask the team to identify and discuss the necessary actions to move forward from the present situation and to reach the milestones.

Discussion 0
Questions 5

Which of the following techniques is most likely applied to ensure the quality of acceptance testing activities?

Options:

A.  

Review of the source code to ensure traceability of user stories to system components.

B.  

Verification of the traceability between user stories and test cases to make sure it is up to date.

C.  

Checklist-based verification of requirements to ensure their completeness and quality.

D.  

Eye tracking to verify the feasibility of previously defined user acceptance tests.

Discussion 0
Questions 6

Your company wants to establish a new human resources management application. As tester, you propose to use an ATDD approach and to use business process models for test case design.

Which of the following statements is the LEAST meaningful argument for this approach?

Options:

A.  

The process models will help testers to understand the use cases to be tested.

B.  

Testers will be able to show test coverage directly within the graphical representation of business processes.

C.  

Business process models will make it easier to detect defects in the application code.

D.  

As business process models will be updated to maintain the tests, they will be a living documentation of the product.

Discussion 0