Easter Sale Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

Execution and Control of Operations Question and Answers

Execution and Control of Operations

Last Update May 20, 2024
Total Questions : 105

We are offering FREE CPIM-ECO APICS exam questions. All you do is to just go and sign up. Give your details, prepare CPIM-ECO free exam questions and then go for complete pool of Execution and Control of Operations test questions that will help you more.

CPIM-ECO pdf

CPIM-ECO PDF

$35  $99.99
CPIM-ECO Engine

CPIM-ECO Testing Engine

$42  $119.99
CPIM-ECO PDF + Engine

CPIM-ECO PDF + Testing Engine

$56  $159.99
Questions 1

Small-group improvement activities are most effective when the:

Options:

A.  

group is guided by a professional facilitator.

B.  

group focuses on solvable problems.

C.  

machine operators are required to participate.

D.  

company's industrial engineers participate.

Discussion 0
Questions 2

Which of the following are fundamental building blocks for workforce empowerment and engagement?

Options:

A.  

Motivation, capability and determination

B.  

Salary, promotions and bonuses

C.  

Accountability, responsibility and teamwork

D.  

Open communication, transparency and trust

Discussion 0
Questions 3

When a company moves from sampling inspection to internal process control, which of the following actions should be taken prior to evaluating supplier performance?

Options:

A.  

Plan and analyze results.

B.  

Conduct a supplier kaizen.

C.  

Establish quality criteria.

D.  

Establish target inventory levels.

Discussion 0
Questions 4

Which of the following benefits is a result of Standardized Work?

Options:

A.  

Ergonomic repetitive movements

B.  

Reduced quality checks

C.  

Evolutionary operations

D.  

Process stability

Discussion 0
Questions 5

Control charts are used to do which of the following?

Options:

A.  

Determine preventative maintenance schedules

B.  

Display variation of the production process

C.  

Determine the percentage of output within specification limits

D.  

Verify ongoing process capability

Discussion 0
Questions 6

Which of the following characteristics are found in a good quality management system?

Options:

A.  

It covers a broad range of activities.

B.  

It emphasizes sampling inspection.

C.  

It relies on qualitative measurements.

D.  

It reduces variability in the workplace.

Discussion 0
Questions 7

During a soldering operation some components were getting damaged due to high temperatures. A fix to eliminate the defect was put into place, which resulted in a(n):

Options:

A.  

SPC study.

B.  

6 sigma process.

C.  

poka-yoke.

D.  

100% inspection.

Discussion 0
Questions 8

Operation-to-operation quantity reporting is most important to which of the following production environments?

Options:

A.  

Job-lot production

B.  

Process production

C.  

Repetitive manufacturing

D.  

Continuous manufacturing

Discussion 0
Questions 9

The primary value of a process map is to show:

Options:

A.  

product routings between work centers.

B.  

plant layout.

C.  

material and operator movements.

D.  

material and information flow.

Discussion 0
Questions 10

Which of the following components are associated with inventory functions?

Options:

A.  

Transit, cycle, and warehousing

B.  

Transit, cycle, and safety stock

C.  

Safety stock, anticipation, and work in process (WIP)

D.  

Raw, work in process (WIP), and finished goods

Discussion 0
Questions 11

Standard costing systems may encourage production managers to do which of the following activities?

Options:

A.  

Concentrate on easy orders to maintain high productivity ratios.

B.  

Implement Theory of Constraints.

C.  

Implement lean production systems to reduce cycle times.

D.  

Build finished-goods inventory to net requirements.

Discussion 0
Questions 12

Throughput for a family of parts can be increased by use of which of the following approaches?

Options:

A.  

Cell layout

B.  

Functional layout

C.  

High utilization

D.  

Batch processing

Discussion 0
Questions 13

To decrease time to market for discrete products, it is most effective to improve which of the following phases?

Options:

A.  

Product definition

B.  

Product design

C.  

Production

D.  

Distribution

Discussion 0
Questions 14

Which of the following approaches should improve a supplier's quality, price, and delivery performance?

Options:

A.  

Long-term commitments for capacity

B.  

Fixed warehouse storage locations

C.  

Secondary sources for components

D.  

Timely inspection of material

Discussion 0
Questions 15

An immediate benefit of implementing lean manufacturing is improvement in:

Options:

A.  

employee development.

B.  

inventory valuation.

C.  

total quality.

D.  

lead time.