A concentrating solar thermal system collects 5 GJ/h of thermal heat, which is delivered to a 94% efficient hot water generator. The hot water generator is used to raise the water temperature from 15°C to 65°C. The specific heat of water (Cp) is 4.2 kJ/kg-°C. What flow rate (liter/second) of hot water can be delivered from the hot water generator?
Infiltration (inward air leakage) in a building is dependent on several factors. Which of the following is least likely to affect or influence infiltration in a building?
When should commissioning be included in the design and construction of a facility?
Using a degree-day base of 18°C, calculate the number of cooling degree days (CDD) if the outside temperature is a uniform 25°C throughout the year (365 days/year).
A 1OO-kW packaged engine-generate combined heat and power (CHP) system has the specifications listed below. The CHP equipment operates fully loaded for 8.000 h/yr. What isthe annual fuel cost for the ChP equipment?
CMP equipment specifications: Electrical output 100kw Electrical efficiency: 25% Thermal recovery efficiency: 50*6 Total CMP efficiency: 75%
Additional information: Fuel cost: S3.S0/GJ Electricity cost S0.06/kWh Previous water heating efficiency: 8046 Mot water usage: 75,700 liters/day (21 *C temperature rise)
[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]
A fully-loaded heat pump unit delivers 36-kW thermal heating with a power draw of 12-kW electric. What is the coefficient of performance (COP) at full load?
Which type of lighting control technique operates in "manual on" and "auto-off mode, and can be used in situations where there is brief occupancy that do not need lights on?
When comparing two similar facilities, you see that the facility with newer, higher-efficiency equipment has a higher energy-use index [EUI] (kJ/m²-yr). What might be the cause?
Natural gas costs $4.80/GJ. How much does it cost to heat 500 liters of water from 18°C to 50°C using a natural gas water heater with an efficiency of 85%? [The efficiency and fuel price are both based on HHV. The specific heat of water (C) is 4.2 kJ/kg-°C.]
A new lighting system costs $60,000. The new lighting system has a 15-year life and the minimum required rate of return (MARR) is 15%. How much must the new lighting system save to be life-cycle cost effective?
A 25-kW motor, at full load, drives a centrifugal fan that produces 160,000 liters per second (l/s) of ventilation air. If the fan speed is reduced to a flow rate of 150,000 l/s, what is the new load on the motor?
A motor operates with a normal and constant load. The electric current is measured to be 25% of the motor's nameplate rating. What does this mean?
A facility replaces a natural gas heating system rated at 10,000 kJ/h and 80% efficiency with an electric heat pump rated at 10,000 kJ/h and a coefficient of performance (COP) of 2.3. Will this project also reduce the annual energy utilization index (EUI) for the facility?
Which electric rate tariff would best cost justify a thermal energy storage (TES) system?
What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?
A hot-water boiler has a cut-in set point of 65°C on the hot water supply temperature and a differential set point of 10°C. What is the hot-water supply temperature that causes the boiler to turn off?
A controlled valve is full closed when it gets a signal of 4 mA. The valve is full open when it gets a signal of 20 mA. With a control signal of 8 mA, what is the valve position?
According to the institute of Electrical and Electronic Engineers (IEEE) standard 519. "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems." the maximum total harmonic distortion (THD) for general low voltage systems less than 600 votts) should be:
SELECT THE CORRECT ANSWER
At the end of a performance contract, who owns the equipment installed by the project?
A facility has a monthly peak power demand of 1,000 kW and an average power factor of 80%. The facility pays a demand charge of $7.50/kVA-month. What is the additional cost per month because the power factor is less than 100%?
A refrigerant-to-water heat exchanger can be added to air-conditioning equipment to heat water using the waste heat in the vapor compression refrigerant cycle. Where is this type of heat exchanger located in the refrigerant loop?
A facility has the thermal cooling load profile shown in the table below. The utility rate traffic has an no-peak time-of-use period that begins at 10:00 a.m ends at 7:00 p.m. What chiller capacity (output) is required for a load-leveling operating strategy?

[Question from the previous image, which was about chiller capacity for load leveling, but the table was missing]
How can you tell if steam traps in a steam distribution system may NOT be working correctly?
A building has a 100 m² wall with an R-value of 14.4 (m²-C/W) in a climate with 3,500 heating degree days (HDD). The building heater is 85% efficient [based on the fuel's higher-heating value (HHV)]. The fuel cost is $5.00/GJ [based on the fuel's higher-heating value (HHV)]. What is the annual cost of the heat loss through the wall?
A 7 bar (gauge pressure) compressed air system has 5 leaks that are 3 mm in diameter and 3 leaks that are 6 mm in diameter. The compressed-air system is pressurized 8,760 hours per year. Electricity cost is $0.10/kWh. What is the annual cost of the leaks in the compressed air system?
A steam trap with a 6-mm orifice in an 0.8-MPa steam system has failed open. The steam system is pressurized8.760 hours/yr. The steam cost is $15.00 /GJ. Using thetable below, what is the annualcost of the vented steam through the failed steam trap? ignore any condensate return issues.

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]
Which of the following statements regarding refrigerants is NOT correct?
5ELECT THE CORRECT ANSWER
Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?
An air-conditioning system at full load is rated at 70-kW (thermal cooling) and has a coefficient of performance (COP) of 4.1. What is the electrical load at full load?
A facility uses 250,000 kWh in a 31-day billing period. The peak demand in the billing period is 1,200 kW. What is the facility partial load factor?