Big Black Friday Sale 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exams65

ExamsBrite Dumps

Certified Energy Manager (CEM) Question and Answers

Certified Energy Manager (CEM)

Last Update Nov 30, 2025
Total Questions : 130

We are offering FREE CEM AEE exam questions. All you do is to just go and sign up. Give your details, prepare CEM free exam questions and then go for complete pool of Certified Energy Manager (CEM) test questions that will help you more.

CEM pdf

CEM PDF

$36.75  $104.99
CEM Engine

CEM Testing Engine

$43.75  $124.99
CEM PDF + Engine

CEM PDF + Testing Engine

$57.75  $164.99
Questions 1

A concentrating solar thermal system collects 5 GJ/h of thermal heat, which is delivered to a 94% efficient hot water generator. The hot water generator is used to raise the water temperature from 15°C to 65°C. The specific heat of water (Cp) is 4.2 kJ/kg-°C. What flow rate (liter/second) of hot water can be delivered from the hot water generator?

Options:

A.  

4.2 liter/second

B.  

6.2 liter/second

C.  

9.2 liter/second

D.  

12.0 liter/second

Discussion 0
Questions 2

Infiltration (inward air leakage) in a building is dependent on several factors. Which of the following is least likely to affect or influence infiltration in a building?

Options:

A.  

Outside air wind speed

B.  

Outside air temperature

C.  

Building height

D.  

Fuel type used for heating and cooling

E.  

Poor or missing weatherstripping

Discussion 0
Questions 3

In an ammonia-water absorption chiller, what material is the refrigerant?

Options:

A.  

Some form of fluorocarbon

B.  

Water

C.  

Lithium bromide

D.  

Ammonia

Discussion 0
Questions 4

Which of the following is NOT included in commissioning documentation?

Options:

A.  

Original facility and equipment design intent

B.  

As-built drawings

C.  

Financing payment structure reports

D.  

Equipment control sequence documentation

E.  

Equipment operations and maintenance manuals

Discussion 0
Questions 5

When should commissioning be included in the design and construction of a facility?

Options:

A.  

When the planning process begins

B.  

When the design is finalized

C.  

When installation of the energy systems begins

D.  

When construction is finalized

E.  

When the occupancy permit is accepted

Discussion 0
Questions 6

Using a degree-day base of 18°C, calculate the number of cooling degree days (CDD) if the outside temperature is a uniform 25°C throughout the year (365 days/year).

Options:

A.  

1,845 CDD/yr

B.  

1,955 CDD/yr

C.  

2,250 CDD/yr

D.  

2,555 CDD/yr

E.  

2,975 CDD/yr

Discussion 0
Questions 7

A 1OO-kW packaged engine-generate combined heat and power (CHP) system has the specifications listed below. The CHP equipment operates fully loaded for 8.000 h/yr. What isthe annual fuel cost for the ChP equipment?

CMP equipment specifications: Electrical output 100kw Electrical efficiency: 25% Thermal recovery efficiency: 50*6 Total CMP efficiency: 75%

Additional information: Fuel cost: S3.S0/GJ Electricity cost S0.06/kWh Previous water heating efficiency: 8046 Mot water usage: 75,700 liters/day (21 *C temperature rise)

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]

Options:

A.  

$28,900/yr

B.  

$32,668/yr

C.  

$43,776/yr

D.  

$52,222/yr

E.  

$58,300/yr

Discussion 0
Questions 8

A fully-loaded heat pump unit delivers 36-kW thermal heating with a power draw of 12-kW electric. What is the coefficient of performance (COP) at full load?

Options:

A.  

2.0

B.  

3.0

C.  

4.0

D.  

5.0

E.  

6.0

Discussion 0
Questions 9

What is the main reason for using instrumentation in energy audits?

Options:

A.  

Save energy

B.  

Determine energy flows

C.  

Validate utility energy bills

D.  

Support the local economy

Discussion 0
Questions 10

Which type of lighting control technique operates in "manual on" and "auto-off mode, and can be used in situations where there is brief occupancy that do not need lights on?

Options:

A.  

Microphonics technology

B.  

PIR/Microphonics dual technology

C.  

Photocell control

D.  

Vacancy sensor

E.  

Occupancy sensor

Discussion 0
Questions 11

When comparing two similar facilities, you see that the facility with newer, higher-efficiency equipment has a higher energy-use index [EUI] (kJ/m²-yr). What might be the cause?

Options:

A.  

The facility with the higher EUI is in need of commissioning

B.  

The facility with the lower EUI is in need of commissioning

C.  

The facility with the lower EUI requires a performance contract

D.  

The facility with the higher efficiency equipment should have a higher EUI

E.  

The facility with the higher EUI requires a supervisory control and data acquisition (SCADA) system

Discussion 0
Questions 12

Thermal scans of electrical equipment are useful for:

Options:

A.  

Locating areas of high power factor

B.  

Reading current carrying capacity of installed conductors

C.  

Locating a loose electrical connection

D.  

Measuring the load on a refrigerant system

Discussion 0
Questions 13

Natural gas costs $4.80/GJ. How much does it cost to heat 500 liters of water from 18°C to 50°C using a natural gas water heater with an efficiency of 85%? [The efficiency and fuel price are both based on HHV. The specific heat of water (C) is 4.2 kJ/kg-°C.]

Options:

A.  

$0.25

B.  

$0.38

C.  

$0.76

D.  

$1.25

E.  

$1.44

Discussion 0
Questions 14

A new lighting system costs $60,000. The new lighting system has a 15-year life and the minimum required rate of return (MARR) is 15%. How much must the new lighting system save to be life-cycle cost effective?

Options:

A.  

$10,260/year

B.  

$12,556/year

C.  

$15,650/year

D.  

$27,090/year

E.  

$33,200/year

Discussion 0
Questions 15

A 25-kW motor, at full load, drives a centrifugal fan that produces 160,000 liters per second (l/s) of ventilation air. If the fan speed is reduced to a flow rate of 150,000 l/s, what is the new load on the motor?

Options:

A.  

15.2 kW

B.  

20.6 kW

C.  

24.2 kW

D.  

25.0 kW

E.  

30.3 kW

Discussion 0
Questions 16

A motor operates with a normal and constant load. The electric current is measured to be 25% of the motor's nameplate rating. What does this mean?

Options:

A.  

The motor is operating at high efficiency

B.  

The motor is oversized and may be downsized to increase efficiency

C.  

The applied voltage is too low and should be increased to improve efficiency

D.  

The applied voltage is too high and should be reduced to improve efficiency

Discussion 0
Questions 17

A facility replaces a natural gas heating system rated at 10,000 kJ/h and 80% efficiency with an electric heat pump rated at 10,000 kJ/h and a coefficient of performance (COP) of 2.3. Will this project also reduce the annual energy utilization index (EUI) for the facility?

Options:

A.  

Yes

B.  

No

Discussion 0
Questions 18

Which electric rate tariff would best cost justify a thermal energy storage (TES) system?

Options:

A.  

High electricity rate and low peak-demand rate

B.  

Low electricity rate and low peak-demand rate

C.  

Great differential between off-peak and on-peak time-of-use electricity rates

D.  

Great differential between high season and low season electricity rates

E.  

Great differential between high season and low season demand rates

Discussion 0
Questions 19

What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?

Options:

A.  

Heat pipe

B.  

Shell and tube

C.  

Ceramic recuperator

D.  

Desiccant heat wheel

E.  

Run-around system

Discussion 0
Questions 20

A hot-water boiler has a cut-in set point of 65°C on the hot water supply temperature and a differential set point of 10°C. What is the hot-water supply temperature that causes the boiler to turn off?

Options:

A.  

55°C

B.  

65°C

C.  

75°C

D.  

It depends on the return water temperature

Discussion 0
Questions 21

What is a common method to reduce the impact of voltage imbalance?

Options:

A.  

Rebalance single-phase loads

B.  

Install harmonic filters

C.  

Install capacitors to improve power factor on three-phase loads

D.  

Reverse phase connections on three-phase motors

Discussion 0
Questions 22

A controlled valve is full closed when it gets a signal of 4 mA. The valve is full open when it gets a signal of 20 mA. With a control signal of 8 mA, what is the valve position?

Options:

A.  

12.5% open

B.  

25% open

C.  

45% open

D.  

75% open

E.  

82% open

Discussion 0
Questions 23

What is a common cause of poor power quality?

Options:

A.  

Natural gas turbine power generation by utilities

B.  

Electronic equipment, such as personal computers

C.  

Incandescent lighting

D.  

Synchronous motors

E.  

Partially loaded induction motors

Discussion 0
Questions 24

According to the institute of Electrical and Electronic Engineers (IEEE) standard 519. "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems." the maximum total harmonic distortion (THD) for general low voltage systems less than 600 votts) should be:

SELECT THE CORRECT ANSWER

Options:

A.  

Less than 20%

B.  

Less than 10%

C.  

Less than 5%

D.  

Less than 1%

E.  

Greater than 1%

Discussion 0
Questions 25

At the end of a performance contract, who owns the equipment installed by the project?

Options:

A.  

The bank

B.  

The energy service company

C.  

The equipment manufacturer

D.  

The company that paid the contract payments

Discussion 0
Questions 26

In a PID control system, what is the purpose of the Proportional Gain?

Options:

A.  

Reacts to change

B.  

Reduces/eliminates offset

C.  

Senses high load rate

D.  

Control point

Discussion 0
Questions 27

A facility has a monthly peak power demand of 1,000 kW and an average power factor of 80%. The facility pays a demand charge of $7.50/kVA-month. What is the additional cost per month because the power factor is less than 100%?

Options:

A.  

$0/month

B.  

$187/month

C.  

$1,875/month

D.  

$2,244/month

E.  

$3,370/month

Discussion 0
Questions 28

How can commissioning reduce the life-cycle cost to owners and operators?

Options:

A.  

Reduce the cost of change orders during construction

B.  

Improve the performance of energy systems

C.  

Improve the satisfaction of building occupants

D.  

Improve the effectiveness of operations and maintenance

E.  

All of the above

Discussion 0
Questions 29

A refrigerant-to-water heat exchanger can be added to air-conditioning equipment to heat water using the waste heat in the vapor compression refrigerant cycle. Where is this type of heat exchanger located in the refrigerant loop?

Options:

A.  

After the condenser coil, before the thermal expansion valve

B.  

After the expansion valve, before the evaporator coil

C.  

After the evaporator coil, before the compressor

D.  

After the compressor, before the condenser coil

Discussion 0
Questions 30

A facility has the thermal cooling load profile shown in the table below. The utility rate traffic has an no-peak time-of-use period that begins at 10:00 a.m ends at 7:00 p.m. What chiller capacity (output) is required for a load-leveling operating strategy?

[Question from the previous image, which was about chiller capacity for load leveling, but the table was missing]

Options:

A.  

4.0 GJ/h

B.  

5.0 GJ/h

C.  

7.0 GJ/h

D.  

8.0 GJ/h

Discussion 0
Questions 31

How can you tell if steam traps in a steam distribution system may NOT be working correctly?

Options:

A.  

Robust flash steam rising from condensate receiver tank vent pipes

B.  

An increase in make-up water requirements relative to steam demand

C.  

Rapid chattering of disk steam traps

D.  

No sound from inverted bucket steam traps

E.  

All of the above

Discussion 0
Questions 32

A building has a 100 m² wall with an R-value of 14.4 (m²-C/W) in a climate with 3,500 heating degree days (HDD). The building heater is 85% efficient [based on the fuel's higher-heating value (HHV)]. The fuel cost is $5.00/GJ [based on the fuel's higher-heating value (HHV)]. What is the annual cost of the heat loss through the wall?

Options:

A.  

$10.56/yr

B.  

$12.35/yr

C.  

$14.44/yr

D.  

$16.22/yr

E.  

$22.56/yr

Discussion 0
Questions 33

A 7 bar (gauge pressure) compressed air system has 5 leaks that are 3 mm in diameter and 3 leaks that are 6 mm in diameter. The compressed-air system is pressurized 8,760 hours per year. Electricity cost is $0.10/kWh. What is the annual cost of the leaks in the compressed air system?

Options:

A.  

$18,150/yr

B.  

$25,220/yr

C.  

$30,910/yr

D.  

$48,480/yr

E.  

$56,500/yr

Discussion 0
Questions 34

A steam trap with a 6-mm orifice in an 0.8-MPa steam system has failed open. The steam system is pressurized8.760 hours/yr. The steam cost is $15.00 /GJ. Using thetable below, what is the annualcost of the vented steam through the failed steam trap? ignore any condensate return issues.

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]

Options:

A.  

$5,000/yr

B.  

$10,000/yr

C.  

$20,000/yr

D.  

$30,000/yr

E.  

$40,000/yr

Discussion 0
Questions 35

Which of the following statements regarding refrigerants is NOT correct?

5ELECT THE CORRECT ANSWER

Options:

A.  

R-407C is a blended Hydro Fluoro Carbon or near Azeotropic mixture, and can be used as a replacement for R-22 in commercial applications

B.  

R-11 and R-12 are Chloro Fluoro Carbons with significant ozone depleting potential

C.  

R-1234yf is a Hydro Fluoro Olefin with zero ozone depleting potential, and little global warming potential

D.  

R-22 is a Hydro Chloro Carbon with significant ozone depleting potential and significant global warming impact

E.  

R-32 and R-134a are Hydro Fluoro Carbons with zero ozone depleting potential, and significant global warming impact

Discussion 0
Questions 36

Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?

Options:

A.  

IRR < 0%

B.  

IRR < 15%

C.  

IRR = 15%

D.  

IRR > 15%

Discussion 0
Questions 37

An air-conditioning system at full load is rated at 70-kW (thermal cooling) and has a coefficient of performance (COP) of 4.1. What is the electrical load at full load?

Options:

A.  

17.1 kW

B.  

23.3 kW

C.  

35.0 kW

D.  

46.7 kW

E.  

70.0 kW

Discussion 0
Questions 38

A facility uses 250,000 kWh in a 31-day billing period. The peak demand in the billing period is 1,200 kW. What is the facility partial load factor?

Options:

A.  

28%

B.  

33%

C.  

45%

D.  

66%

E.  

77%

Discussion 0
Questions 39

Which of the following is/are benefits of commissioning?

Options:

A.  

Ensures a system is designed to operate as intended

B.  

Ensures a system is installed to operate as intended

C.  

Ensures staff know how to operate a system as intended

D.  

Ensures staff know how to maintain a system as intended

E.  

All of the above

Discussion 0