SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Question and Answers

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing

Last Update May 15, 2024
Total Questions : 80

We are offering FREE C_TS422_2022 SAP exam questions. All you do is to just go and sign up. Give your details, prepare C_TS422_2022 free exam questions and then go for complete pool of SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing test questions that will help you more.

C_TS422_2022 pdf

C_TS422_2022 PDF

$35  $99.99
C_TS422_2022 Engine

C_TS422_2022 Testing Engine

$42  $119.99
C_TS422_2022 PDF + Engine

C_TS422_2022 PDF + Testing Engine

$56  $159.99
Questions 1

What can you use heuristics in Advanced Planning (PP/DS) for?

Options:

A.  

To optimize costs and times in production plans

B.  

To solve planning problems for defined objects

C.  

To automate material movements in material staging

D.  

To set default values in production master data

Discussion 0
Questions 2

Which standard item categories can you select inside a bill of material (BOM)?

Note: There are 2 correct answers to this question

Options:

A.  

Work item

B.  

Variable-size item

C.  

Non-stock item

D.  

WBS item

Discussion 0
Questions 3

Which time elements are relevant for lead time scheduling of a production order? Note:

There are 2 correct answers to this question.

Options:

A.  

setup time

B.  

Opening Period

C.  

Float after Production

D.  

Total replenishment lead time

Discussion 0
Questions 4

You Have a scheduling agreement with a vendor, you want classic MRP to automatically create

schedule lines in case of material shortage, what must you do?

Note: there are 2 correct answers to this question.

Options:

A.  

Add the agreement to the source list and mark it for MRP relevance.

B.  

Set the creation indicator for purchase requisition on the initial screen of the MRP run.

C.  

Add the agreement to the quota arrangement and mark it for MRP relevance.

D.  

Set the creation indicator for delivery schedule lines on the initial screen the MRP run.

Discussion 0
Questions 5

which SAP application can be used for forecasting in Supply Chain Planning?

Note: there are 2 correct answers to this question.

Options:

A.  

Integration Business Planning (IBP)

B.  

Capacity Requirement Planning (CRP)

C.  

Supply Chain Management (SCM)

D.  

Material Requirement Planning (MRP)

Discussion 0
Questions 6

You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

Options:

A.  

Choose planning strategy 50 (Planning without final assembly) and select the — corresponding Individual/Collective indicator.

B.  

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

C.  

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

D.  

Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collectiveindicator.

Discussion 0
Questions 7

which actions does the system perform by default when you save a confirmation for a finished

product in repetitive manufacturing?

Note: There are 3 Correct answers to this question.

Options:

A.  

Posting of production costs to the production cost collector

B.  

posting of goods receipt for the product

C.  

Reduction of associated capacity requirements

D.  

Archiving of document for assembly scrap

E.  

Material staging for next order in sequence

Discussion 0
Questions 8

Which of the following questions do you have to answer before you start creating a bill of material (BOM)?

Options:

A.  

Is the material type allowed in the BOM?

B.  

Which base unit of measure does the material have?

C.  

What status does the BOM have?

D.  

In which storage location is the BOM required?

Discussion 0
Questions 9

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

Options:

A.  

Routing

B.  

Work Center

C.  

Bill of material (BOM)

D.  

Material Master

Discussion 0
Questions 10

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

Options:

A.  

Specify a negative planning horizon.

B.  

Specify a positive planning horizon.

C.  

Specify a positive offset time.

D.  

Specify a negative offset time.

Discussion 0
Questions 11

You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?

Options:

A.  

Manual Planning Without Check

B.  

Consumption-Based Planning

C.  

Material Requirements Planning

D.  

Advanced Planning

Discussion 0
Questions 12

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run?

Note: there are 2 correct answers to this question.

Options:

A.  

Use a specific material status

B.  

Use a specific material group

C.  

Use a specific MRP type

D.  

Use a specific MRP list

Discussion 0
Questions 13

Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag?

Note: There are 2 correct answers to this question.

Options:

A.  

Work Center

B.  

Production Version

C.  

Material

D.  

plant

Discussion 0
Questions 14

How would you define pegging in the context of Advanced Planning?

Options:

A.  

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements

B.  

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

C.  

An evaluation to verify if there are material or capacity shortages in the ^ network after the production planning run

D.  

An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run

Discussion 0
Questions 15

You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?

Options:

A.  

Insert operation

B.  

Squeeze in

C.  

Schedule in working time only

D.  

Find Slot

Discussion 0
Questions 16

What is the work center hierarchy in capacity planning?

Options:

A.  

A group of work center in a parallel sequence that is used to split production quantities and work on them in parallel

B.  

A group of alternative work centers providing a cumulative available capacity for production

C.  

A group of work centers in a production line being used in sequence for production

D.  

A group of alternative work centers for production, structured in hierarchy levels by priorities

Discussion 0
Questions 17

How can a material availability check be triggered automatically for a production order?

Note: There are 2 correct answers to this question.

Options:

A.  

By capacity planning

B.  

By mass processing

C.  

By order release

D.  

By order confirmation

Discussion 0
Questions 18

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

Options:

A.  

The planned order is converted to a production order.

B.  

The planned order's component availability is checked.

C.  

The planned order generates capacity requirements

D.  

The planned order's components are copied to the picking list.

Discussion 0
Questions 19

Which business processes are affected by settings in the order-type-dependent parameters?

Note: There are 2 correct answers to this question.

Options:

A.  

Check material availability.

B.  

Schedule production orders.

C.  

Define integration with cost accounting.

D.  

Select master data.

Discussion 0
Questions 20

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

Options:

A.  

Resource matrix

B.  

Resource network

C.  

Resource hierarchy

D.  

Resource selection

Discussion 0
Questions 21

What does the material type influence?

Note: There are 2 correct answers to this question.

Options:

A.  

Which document types and class categories are allowed

B.  

Which material master screens appear and in which sequence

C.  

Whether the material is produced in-house, procured externally, or both

D.  

Which plant-specific and plant-independent statuses are allowed

Discussion 0
Questions 22

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?

Note: There are 2 correct answers to this question.

Options:

A.  

Order (pool) chart

B.  

Capacity requirements chart

C.  

Work center capacities chart

D.  

Orders (dispatched) chart

Discussion 0
Questions 23

Which time elements can be reduced by a reduction strategy?

Note: There are 3 correct answers to this question.

Options:

A.  

Goods receipt processing time

B.  

Move time

C.  

Wait time

D.  

Float after production

E.  

Queue time

Discussion 0
Questions 24

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

Options:

A.  

The new operation is inserted at the desired time; the previous dispatched operation is moved forward.

B.  

The new operation is inserted at the desired time; the previously dispatched operation is moved backward

C.  

The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.

D.  

The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

Discussion 0