SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Question and Answers

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing

Last Update Apr 26, 2024
Total Questions : 82

We are offering FREE C_TS422_2021 SAP exam questions. All you do is to just go and sign up. Give your details, prepare C_TS422_2021 free exam questions and then go for complete pool of SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing test questions that will help you more.

C_TS422_2021 pdf

C_TS422_2021 PDF

$35  $99.99
C_TS422_2021 Engine

C_TS422_2021 Testing Engine

$42  $119.99
C_TS422_2021 PDF + Engine

C_TS422_2021 PDF + Testing Engine

$56  $159.99
Questions 1

What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

Options:

A.  

Consumption sequence procedure

B.  

Requirements profile

C.  

Order type

D.  

Requirements type

Discussion 0
Questions 2

Which SAP application can be used for forcasting in Supply Chain Planning?

Options:

A.  

Material Requirements Planning (MRP)

B.  

Supply Chain Management(SCM)

C.  

Integrated Business Planning (IBP)

D.  

Capacity Requirements Planning (CRP)

Discussion 0
Questions 3

What does it mean for the production planner when MRP works with infinite capacities?

Options:

A.  

MRP assigns capacity requirements automatically after the last scheduled order on a work center.

B.  

MRP creates capacity requirements without checking the capacity of a work center.

C.  

MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

D.  

MRP creates capacity requirements only if the work center has sufficient capacity.

Discussion 0
Questions 4

What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

Options:

A.  

The work center has several invidula capacities.

B.  

The finite Scheduling indicator is NOT set in the strategy profile.

C.  

The Change Planning Direction indicator is set in strategy profile.

D.  

Alternative work centers are fully occupied.

Discussion 0
Questions 5

You want to use capacity availability checks for production orders. Which settings have to be made for this?

Options:

A.  

A checking rule must be assigned in the checking control

B.  

The PRT Availability Check must be set in the checking control.

C.  

An overall profile must be assigned in the checking control.

D.  

The Relevant for Finite Scheduling indicator must be set

Discussion 0
Questions 6

You want to create a production order from a planned order. What methods could you use?

Options:

A.  

Combined conversion

B.  

Partial conversion

C.  

Collective conversion

D.  

Order release

Discussion 0
Questions 7

What are some uses for the low-level code assigned to each material?

Options:

A.  

It is used in MRP to determine the sequence in which materials are planned.

B.  

It is used by product costing to determine how coast are rolled up.

C.  

It is used by engineering to indentify subitems in an engineering bill of material (BOM).

D.  

it is used by ATP to determine the priority of alternative components.

Discussion 0
Questions 8

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.  

Non-stock item

B.  

Work item

C.  

Variable-size item

D.  

WBS item

Discussion 0
Questions 9

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Options:

A.  

Using run schedule quantities for in-house production

B.  

Using quotations for internal and external procurement

C.  

Using purchase orders for external procurement

D.  

Using stock transfer reservations for stock transfer

E.  

Using purchasing costs for automated source prioritization

Discussion 0
Questions 10

Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

Options:

A.  

Run MRP with quota arrangement.

B.  

Run MRP with automatic selection of production version.

C.  

Assign planned orders manual lying the planning table.

D.  

Run PP/DS heuristics for repetitive manufacturing.

Discussion 0
Questions 11

Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

Options:

A.  

When multiple operations are maintained for one product

B.  

When alternate resources are used within one operation

C.  

When multiple planned orders exist on one resource

D.  

When multiple production versions are maintained for one product

Discussion 0
Questions 12

Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?

Options:

A.  

Work center

B.  

Production version

C.  

Plant

D.  

Material

Discussion 0