SAP Certified Application Associate - SAP S/4HANA Asset Management Question and Answers

SAP Certified Application Associate - SAP S/4HANA Asset Management

Last Update Apr 28, 2024
Total Questions : 87

We are offering FREE C_TS413_2021 SAP exam questions. All you do is to just go and sign up. Give your details, prepare C_TS413_2021 free exam questions and then go for complete pool of SAP Certified Application Associate - SAP S/4HANA Asset Management test questions that will help you more.

C_TS413_2021 pdf

C_TS413_2021 PDF

$35  $99.99
C_TS413_2021 Engine

C_TS413_2021 Testing Engine

$42  $119.99
C_TS413_2021 PDF + Engine

C_TS413_2021 PDF + Testing Engine

$56  $159.99
Questions 1

Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

Options:

A.  

It defines the allowed characters for a functional location.

B.  

It can have a maximum length of 50 characters.

C.  

It defines hierarchy levels of the functional location structure.

D.  

It defines which data is transferred to the lower levels of the hierarchy.

Discussion 0
Questions 2

The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?

Options:

A.  

It is not shifted.

B.  

It is postponed by 5 days.

C.  

It is postponed by a full cycle (100%).

D.  

It will be 5 days earlier.

Discussion 0
Questions 3

Which parameter in the material master is a prerequisite for refurbishment?

Options:

A.  

Valuation class 8000

B.  

Valuation category C (condition-based)

C.  

Valuation type H (origin)

D.  

Valuation category B (in-house/external procurement)

Discussion 0
Questions 4

You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

Options:

A.  

Define the functional location category.

B.  

Define the number range for the functional location category.

C.  

Define the reference functional location.

D.  

Define the structure indicator.

Discussion 0
Questions 5

You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question.

Options:

A.  

You can assign a network to a revision.

B.  

You must assign maintenance notifications to the revision.

C.  

You must use hierarchical task lists for the MEB scenario.

D.  

You can assign a hierarchical task list to the revision.

Discussion 0
Questions 6

Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.

Options:

A.  

The planner can change estimated costs only at header level.

B.  

Shop papers can only be printed after the order release.

C.  

Goods receipts for external services can be entered.

D.  

The controller can determine actual cost surcharges.

E.  

The planner can change planned costs at operation level.

Discussion 0
Questions 7

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.  

Cycle length divided by annual performance

B.  

Cycle length divided by monthly performance

C.  

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.  

Cycle length divided by (annual performance / 365)

Discussion 0
Questions 8

Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

Options:

A.  

In the single-level list editing function for maintenance orders

B.  

In the report Material: Where-Used List

C.  

Within a maintenance order

D.  

In the material reservation list in inventory management

Discussion 0
Questions 9

What happens if you change the primary key of a functionallocation?

Options:

A.  

The functional location is immediately assigned to a new superior functional location when the new label is entered.

B.  

The user must define a new labelling system for the new primary key.

C.  

Changing the superior functional location via alternative labeling is not possible.

D.  

The user must decide whether the functional location is assigned to a new superior functional location.

Discussion 0
Questions 10

You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

Options:

A.  

Assign a piece of equipment with an allocated measuring point to a task list operation.

B.  

Assign an inspection lot to the task list header.

C.  

Assign a measuring point as a production resources/tools(PRT) to a task list operation.

D.  

Assign an inspection document as PRT to the task list operation.

Discussion 0
Questions 11

Which material type is the best choice if you only want to create a structure element within the BOM?

Options:

A.  

Spare part (ERSA)

B.  

Maintenance assembly (IBAU)

C.  

Non-valuated material (UNBW)

D.  

Operating supplies (HIBE)

Discussion 0
Questions 12

Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question.

Options:

A.  

Fixed price of the activity type

B.  

Capacity category

C.  

Organizational unit (HR)

D.  

Calculation key

Discussion 0
Questions 13

Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question.

Options:

A.  

Web Dynpro apps can be used in the SAP Fiori launchpad

B.  

The cloud version can also use SAP GUI for Windows.

C.  

SAP GUI transactions can be used in the SAP Fiori launchpad.

D.  

SAP Fiori launchpad only supports SAP UI5 apps.

Discussion 0