Autodesk Certified Professional in BIM Management for Building Design Question and Answers

Autodesk Certified Professional in BIM Management for Building Design

Last Update Aug 26, 2026
Total Questions : 57

We are offering FREE BIM_MGT_101 Autodesk exam questions. All you do is to just go and sign up. Give your details, prepare BIM_MGT_101 free exam questions and then go for complete pool of Autodesk Certified Professional in BIM Management for Building Design test questions that will help you more.

BIM_MGT_101 pdf

BIM_MGT_101 PDF

$36.75  $104.99
BIM_MGT_101 Engine

BIM_MGT_101 Testing Engine

$43.75  $124.99
BIM_MGT_101 PDF + Engine

BIM_MGT_101 PDF + Testing Engine

$57.75  $164.99
Questions 1

A project manager who is not familiar with Autodesk Forma has asked a BIM manager to lead clash detection for their Revit project. The project manager would like to review the issue lists weekly, by discipline, to track progress and coordinate with consultants as needed.

What should the BIM manager do to fulfil this request efficiently?

Options:

A.  

Export the Autodesk Forma issues to an Excel file manually every week and email it to the project manager.

B.  

Schedule weekly reports with appropriate filters in Autodesk Forma that are saved to the project files.

C.  

Run the Interfere command in AutoCAD and email the Autodesk Forma issues every week.

D.  

Use an Excel file to track issues instead of Autodesk Forma to accommodate the project manager.

Discussion 0
Questions 2

The BIM manager is coordinating a multi-building project in which each building must maintain a unique internal coordinate system but share a common origin point for site-wide references.

Which two actions are required to correctly manage the coordinate setup in this scenario? (Select two.)

Options:

A.  

Place the Survey Point at the shared site origin for all buildings.

B.  

Create unique Survey and Project Base Points for all buildings, maintaining individual Building Coordination.

C.  

Place the Project Base Point at the shared site origin for all buildings.

D.  

Share coordinates by acquiring from the master site model, using a single Survey and Project Base Point.

E.  

Assign a unique Project Base Point for each building model.

Discussion 0
Questions 3

For a project that is well into its Design Development phase, it is discovered that there is an easement on the property that increases the setback by 1 ft 6 in. (450 mm).

Which method for updating the geolocation of the project would be least disruptive to the extended design team?

Options:

A.  

Specify coordinates at a point along the setback edge using the new data.

B.  

Reposition the civil site property-boundary resource file, then publish the new position coordinates to the civil file.

C.  

Select all model elements in a 3D view and move them away from the increased setback boundary.

D.  

Reset coordinates, reposition the site property-boundary resource file, then acquire coordinates from the repositioned civil file.

Discussion 0
Questions 4

A BIM manager is running clash detection for the first time on a large retail project during the Design Development phase. After copying all the models to the coordination space on Autodesk Forma, the matrix shows no clashes among any of the models.

How should the BIM manager proceed?

Options:

A.  

Add sheets to the publish settings and rerun the clash.

B.  

Verify the shared coordinates for each model and republish.

C.  

Continue forward on the project because there are no coordination issues.

D.  

Use the project as a case study for a firm-wide presentation.

Discussion 0
Questions 5

A federated model has been created for a multidisciplinary project, but clashes are being reported in areas where coordination should already be resolved. Upon investigation, the BIM manager finds that some models were exported with outdated links and local coordinates.

What is the most appropriate next step before proceeding with coordination analysis?

Options:

A.  

Instruct teams to verify model references and coordinate systems before reassembly.

B.  

Freeze the current model state and ask trades to work around the identified issues.

C.  

Notify the client and exclude the faulty models from further coordination.

D.  

Run an additional clash-detection pass with adjusted tolerance thresholds to reduce clash totals.

Discussion 0
Questions 6

The BIM manager is working in an Architectural model that uses the phases Existing and New Construction . They have linked in a Structural model that uses only Phase 1 for existing and Phase 2 for new construction. After linking, they notice that demolition elements from the Structural model do not display correctly in the demolition views.

Which approach allows the BIM manager to display linked elements correctly based on this phase setup, without changing the phases in the linked model?

Options:

A.  

Apply a phase-filter override to the linked model using Visibility/Graphics settings.

B.  

Open the linked model and manually change its phase names to match the host model.

C.  

Map the linked model’s phases to the host model’s phases in the Revit Link properties.

D.  

Override the linked view’s phase settings using view templates in the host model.

Discussion 0
Questions 7

What is included in a BIM Execution Plan?

Options:

A.  

Project schedule and design playbook.

B.  

Modeling standards and technology ecosystem.

C.  

LOD Matrix and project specifications.

D.  

Collaboration protocols and project playbook.

Discussion 0
Questions 8

Due to unpredictable material tariffs, a campus project anticipates possibly changing its structural framing system once pricing is finalized. This could affect floor-to-floor heights across several buildings.

What method would best ensure both initial and ongoing coordination of Levels and Grids across a large multidisciplinary Revit project?

Options:

A.  

Use the Copy/Monitor tool on Levels and Grids.

B.  

Establish a Main Model in Autodesk Forma through Design Collaboration.

C.  

Provide consultants a model with Shared Coordinates pre-acquired.

D.  

Export Property Lines, Report Shared Coordinates, and Levels and Grids.

Discussion 0
Questions 9

A BIM manager is preparing to onboard a group of subcontractors into Autodesk Forma for a large healthcare project. These subcontractors need access to a limited set of model files related only to interior partitions, but should not be able to view or modify structural, MEP, or scheduling content.

What two actions should the BIM manager take to manage data security in this scenario? (Select two.)

Options:

A.  

Create and share a Package with specific set-up content.

B.  

Provide access to the entire model set but watermark any non-applicable content.

C.  

Assign full project access and ask team leads to verbally explain access limitations.

D.  

Hide coordination issues from the subcontractors to limit liability.

E.  

Assign role-based permissions and folder-level access aligned with the subcontractors’ scope.

Discussion 0
Questions 10

A project model, which includes multidisciplinary and DWG links, has been exhibiting problematic behavior. It takes a long time to save and synchronize, or crashes unexpectedly. Even though there are no imported DWGs, a scan of the model reveals a large number of IMPORT line patterns that typically come from DWG imports and links and are a possible cause of model-performance loss.

To remedy and prevent a repetition of this situation, the BIM manager is attempting to mentor the team on best practices for preparing DWGs for linking to a Revit model.

Which workflow steps will optimize the DWG files and prevent inefficiencies and loss of productive time due to repeated poor DWG-linking practices?

Options:

A.  

Delete all XREFs; change all fonts to Arial.

B.  

Delete all text; explode all geometry.

C.  

PROXYGRAPHICS=0, PURGE, AUDIT, OVERKILL.

D.  

PROXYGRAPHICS=1, PURGE ALL, AUDIT, OVERKILL.

Discussion 0
Questions 11

The BIM manager has finalized the BIM Execution Plan (BEP) for a multi-discipline educational facility project. Some consultants have already begun modelling, while others are onboarding late. A few external stakeholders are not listed in the original BEP distribution but will need access to coordinated models during design and preconstruction.

What two actions could be taken in order to manage distribution of updates? (Select two.)

Options:

A.  

Update and reissue the BEP only to the consultants who have not yet started modelling to ensure they catch up to project standards.

B.  

Formally distribute the BEP to all relevant parties as an addendum to the contract.

C.  

Formally distribute the BEP to all relevant parties and confirm receipt to ensure alignment on roles, responsibilities, and agreed BIM processes.

D.  

Upload the BEP in a shared Autodesk Forma Data Management folder to ensure version tracking and verify access to stakeholders.

E.  

Wait until construction coordination begins before sharing the BEP with external stakeholders.

Discussion 0
Questions 12

During early coordination on a hospital project, the BIM manager runs a general clash detection between all models and generates over 3,000 clash results. Many are low-priority issues, such as wall-grid overlaps and minor duct-ceiling intersections. The project’s clash matrix outlines only high-impact clashes between structural, MEP, and architecture in specific zones.

For the BIM manager, what is the most appropriate next step to align clash reporting with the project’s coordination strategy?

Options:

A.  

Share the full clash report with all project teams and instruct them to determine and resolve the issues they consider most important.

B.  

Export the entire clash list into spreadsheet format so project managers can manually sort, review, and prioritize the items by trade.

C.  

Disable or relax selected non-critical clash rules within the detection software to temporarily reduce the total number of reported issues.

D.  

Apply the clash matrix to filter out low-priority clashes, adjust detection tolerances where appropriate, and produce reports for each discipline’s scope.

Discussion 0
Questions 13

Refer to the exhibit.

A designer cannot see a 2x4 tile ceiling in the hallway area of their Reflected Ceiling Plan, but that same ceiling is visible in a 3D view. The 2x2 ceilings in the other rooms are visible in both views.

What are two possible reasons for this? (Select two.)

Options:

A.  

The ceiling was inadvertently deleted.

B.  

A View Filter has been applied for that ceiling type.

C.  

A View Template has been assigned with ceilings category visibility off.

D.  

A Plan Region with a higher cut level has been applied to that area.

E.  

Hide in View by Category was applied to that ceiling.

Discussion 0
Questions 14

During a model review, several linked files appear missing or unloadable in the federated coordination file. The files were present and working the day before, and no changes were made to the Revit host model itself.

As the BIM manager, what is the most appropriate step to troubleshoot the issue?

Options:

A.  

Check that file paths to linked models were set as relative and validate that the folder structure remains unchanged.

B.  

Ask the modelling team to rebind all linked models using absolute file paths.

C.  

Remove the missing links and advise each team to reinsert their models before the next coordination meeting.

D.  

Recreate the host model using a previous backup and manually reload each link.

Discussion 0
Questions 15

A design team is distributing models to a construction team’s coordinator, who reports that the various models are not aligned to each other when linked into the coordination environment.

What step should the design team’s lead BIM manager take to resolve the positioning issue?

Options:

A.  

Reset coordinates and advise the coordinator to link all models by Internal Origin to Internal Origin.

B.  

Publish coordinates from the Main Model out to all linked consumed consultant files.

C.  

Report coordinates to provide the coordinator with the desired positioning of each model for them to reposition.

D.  

Advise consultants to acquire coordinates from the primary design team’s model and resubmit updated models.

Discussion 0
Questions 16

The BIM manager is launching a civic center project with strict sustainability and lifecycle data goals. During early planning, each discipline proposes different modelling approaches, and there is concern that downstream data handoff may be inconsistent.

To establish BIM goals and uses that ensure alignment from design through operations, what should the BIM manager do first?

Note: In the context of this exam, the term Level of Development (LOD) is used interchangeably with level of information need.

Options:

A.  

Ask each team to submit its standard BEPs for review and consolidate them into one reference document.

B.  

Finalize the LOD matrix and data drops based on similar past projects, updating it during the design process as needed.

C.  

Begin developing the internal BIM templates and content, assuming they will be applicable to this project.

D.  

Host a stakeholder session to review the project-specific requirements and BIM uses, and establish mobilization needs and modelling requirements.

Discussion 0
Questions 17

Refer to the exhibits.

A BIM manager is preparing a site model that includes three separate buildings. Which exhibit shows the correct way to assemble and position the individual building models on the site while maintaining proper coordinates and orientation?

Options:

A.  

Exhibit 4

B.  

Exhibit 3

C.  

Exhibit 2

D.  

Exhibit 1

Discussion 0